999 resultados para Australian JGOFS Projects


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The green building trend has increased rapidly worldwide in recent decades as a means of addressing growing concerns over climate change and global warming and to reduce the impact of the building industry on the environment. A significant contribution in Australia is the use of a series of rating tools by the Green Building Council Australia (GBCA) for the certification of various types of buildings. This paper reviews the use of the Green Star system in Australian building construction, and investigates the potential challenges involved in acquiring the certification of Australian buildings by critically analysing a database of most recently certified GBCA projects. The results show that management-related credits and innovation-related credits are the easiest and most difficult respectively to obtain. Additionally, 6-Star green buildings achieve significantly higher points than other certified buildings in the Energy category. In contrast, 4 Star green buildings achieve more points in the Material category than 5 and 6 Star buildings. The study offers a useful reference for both property developers and project teams to obtain a better understanding of the rating scheme and consequently the effective preparation of certification documentation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is increasing momentum within the construction industry to deploy distributed teams on projects, yet the major challenges that companies face for managing teams in distributed arrangements have yet to be explored in the construction context. Driven by such need, this study is intended to present an account of the major challenges encountered throughout the life cycle of offshore outsourcing arrangements within the South Australian construction industry. To this end, the study describes the observations made within the natural contexts of one construction project in terms of the challenges to the success of deploying distributed teams for outsourcing of works. Discussions remain in dialogue with relevant theories and the pertinent literature to explain the interpretations and lessons learned and to underpin the conclusions made. It is contended that this study contributes to the field by providing an illuminating insight into potential challenges facing distributed teams being implemented in outsourcing tasks in construction projects. Discussions also offer practical guidelines for construction project managers and assist them in dealing with potential challenges of offshore outsourcing through the lenses of distributed team working principles.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Implementation of global virtual engineering teams (GVETs) commenced since at least two decades ago, but construction has been behind other industries in terms of harnessing this new paradigm. Nevertheless, GVETs are receiving increasing attention within the construction context due to numerous potential benefits they can bring about for the projects. On the other hand, the research about GVETs in Australia is still in its embryonic stages. Australian scholars noticeably have paid scant attention to GVETs in comparison to their colleagues in other developed countries. This paper assumes the process of implementation of a GVET as an isolated project. The study then highlights the well-known main areas of necessary knowledge for managing a GVET project within the construction context based on a project lifecycle approach. Recognizing the weaknesses of existing literature, the paper sets out an agenda for further research within Australian construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sediment trap moorings were deployed from September 21, 1997 through February 21, 1998 at three locations south of Australia along 140°E: at -47°S in the central Subantarctic Zone (SAZ) with traps at 1060, 2050, and 3850 m depth, at -51°S in the Subantarctic Front with one trap at 3080 m, and at -54°S in the Polar Frontal Zone (PFZ) with traps at 830 and 1580 m. Particle fluxes were high at all the sites (18-32 g/m**2/yr total mass and 0.5-1.4 g organic carbon/m**2/yr at -1000 m, assuming minimal flux outside the sampled summer period). These values are similar to other Southern Ocean results and to the median estimated for the global ocean by Lampitt and Antia [1997], and emphasize that the Southern Ocean exports considerable carbon to the deep sea despite its 'high-nutrient, low chlorophyll' characteristics. The SAZ site was dominated by carbonate (>50% of total mass) and the PFZ site by biogenic silica (>50% of total mass). Both sites exhibited high export in spring and late summer, with an intervening low flux period in December. For the 153 day collection period, particulate organic carbon export was somewhat higher in all the traps in the SAZ (range 0.57-0.84 gC/m**2) than in the PFZ (range 0.31-0.53), with an intermediate value observed at the SAF (0.60). The fraction of surface organic carbon export (estimated from seasonal nutrient depletion, Lourey and Trull [2001]) reaching 1000 m was indistinguishable in the SAZ and PFZ, despite different algal communities.