806 resultados para Audiovisual projects management
Resumo:
Relatório de estágio apresentado à Escola Superior de Comunicação Social como parte dos requisitos para obtenção de grau de mestre em Audiovisual e Multimédia.
Resumo:
The continuous changing impacts appeared in all solution understanding approaches in the projects management field (especially in the construction field of work) by adopting dynamic solution paths. The paper will define what argue to be a better relational model for project management constraints (time, cost, and scope). This new model will increase the success factors of any complex program / project. This is a qualitative research adopting a new avenue of investigation by following different approach of attributing project activities with social phenomena, and supporting phenomenon with field of observations rather than mathematical method by emerging solution from human, and ants' colonies successful practices. The results will show the correct approach of relation between the triple constraints considering the relation as multi agents system having specified communication channels based on agents locations. Information will be transferred between agents, and action would be taken based on constraint agents locations in the project structure allowing immediate changes abilities in order to overcome issues of over budget, behind schedule, and additional scope impact. This is complex adaptive system having self organizes technique, and cybernetic control. Resulted model can be used for improving existing project management methodologies.
Resumo:
O presente trabalho busca analisar o resultado da restituição das receitas investidas nos projetos audiovisuais pela empresa RioFilme, no período de 2009 a 2013, por meio do mecanismo de investimento reembolsável, visando identificar a possibilidade de retroalimentação para novos investimentos. A RioFilme, que é uma empresa pública de investimentos em audiovisual da Prefeitura do Rio de Janeiro, realiza investimentos reembolsáveis, nos quais adquire participação nas receitas dos projetos; e não reembolsáveis, em que não há possibilidade restituição financeira para a empresa. Para a operacionalização da pesquisa foi realizada a análise documental de 79 processos administrativos e extraídos dados dos investimentos financeiros realizados RioFilme no setor audiovisual carioca no período de 2009 a 2013. O setor audiovisual brasileiro possui grande intervenção governamental, seja ela de forma direta, como também indireta, através das leis de incentivo à cultura, que utilizam a renúncia fiscal. Este modelo não traz restituição direta para o ente estatal, e consequentemente não possibilita a retroalimentação financeira do Estado para novos investimentos. Desta forma, a análise dos modelos alternativos de financiamento do setor audiovisual, como o mecanismo reembolsável utilizado pela RioFilme é de suma importância para a política cultural audiovisual brasileira, tendo em vista que neste modelo de investimento utilizado pela mesma há possibilidade de restituição financeira direta, possibilitando sua retroalimentação para investimentos em novas obras audiovisuais.
Resumo:
The objective of this paper is to address the methodological process of a teaching strategy for training project management complexity in postgraduate programs. The proposal is made up of different methods —intuitive, comparative, deductive, case study, problem-solving Project-Based Learning— and different activities inside and outside the classroom. This integration of methods motivated the current use of the concept of “learning strategy”. The strategy has two phases: firstly, the integration of the competences —technical, behavioral and contextual—in real projects; and secondly, the learning activity was oriented in upper level of knowledge, the evaluating the complexity for projects management in real situations. Both the competences in the learning strategy and the Project Complexity Evaluation are based on the ICB of IPMA. The learning strategy is applied in an international Postgraduate Program —Erasmus Mundus Master of Science— with the participation of five Universities of the European Union. This master program is fruit of a cooperative experience from one Educative Innovation Group of the UPM -GIE-Project-, two Research Groups of the UPM and the collaboration with other external agents to the university. Some reflections on the experience and the main success factors in the learning strategy were presented in the paper
Resumo:
The objective of this paper is to address the methodological process of a teaching strategy for training project management complexity in postgraduate programs. The proposal is made up of different methods —intuitive, comparative, deductive, case study, problem-solving Project-Based Learning— and different activities inside and outside the classroom. This integration of methods motivated the current use of the concept of ―learning strategy‖. The strategy has two phases: firstly, the integration of the competences —technical, behavioral and contextual—in real projects; and secondly, the learning activity was oriented in upper level of knowledge, the evaluating the complexity for projects management in real situations. Both the competences in the learning strategy and the Project Complexity Evaluation are based on the ICB of IPMA. The learning strategy is applied in an international Postgraduate Program —Erasmus Mundus Master of Science— with the participation of five Universities of the European Union. This master program is fruit of a cooperative experience from one Educative Innovation Group of the UPM -GIE-Project-, two Research Groups of the UPM and the collaboration with other external agents to the university. Some reflections on the experience and the main success factors in the learning strategy were presented in the paper.
Resumo:
Facing the frequent failure of projects in rural areas with top-down approaches, there has been a promotion of participation of the local people in decisions that affect their territories (bottom-up approach) to promote sustainable regional development (Chambers, 1997; Lusthaus et al., 1999; Horton, 2004; Vazquez-Barquero, 2000). In fact participation was deemed necessary to ensure the success and sustainability of projects (UNDP, 2006; WRI, 2008; Davies, 2009). Hence, the progressive strengthening of the local population should be promoted so that they can acquire a range of skills and knowledge that allow them to manage resources properly and undertake productive activities in their territory (Contreras, 2000). These are intangibles and therefore difficult to measure. Hence, in this research a model of integration of intangibles in rural development projects management is proposed. The model designed supplements and enriches the conceptual framework ?Working with People? WWP (Cazorla et al, 2013).
Resumo:
Nowadays, it has become evident the need to seek sustainable development models that address challenges arising in a variety of contexts. The resilience concept appears connected to the ability of people to cope with adversities that inevitably arise due to context dynamics, at different spatial and temporal scales. This concept is related to the model known as Working With People (WWP), focused on rural development projects planning, management and evaluation, from the integration of three dimensions: technical-entrepreneurial, ethical-social and political-contextual. The research reported is part of the RETHINK European Project, whose overall aim is farm modernization and rural resilience. The resilience concept has been analyzed, in the scope of rural development projects management, and a relationship with the WWP model has been established. To this end, a thorough review of the scientific literature concerning this topic has been addressed, in order to develop the state of the art of the different concepts and models involved. A conceptual proposal for the integration of resilience in rural development projects sustainable management, through the three-dimensional WWP model is presented.
Resumo:
National Highway Traffic Safety Administration, Office of Alcohol Countermeasures, Washington, D.C.
Resumo:
The business model of an organization is an important strategic tool for its success, and should therefore be understood by business professionals and information technology professionals. By this context and considering the importance of information technology in contemporary business models, this article aims to verify the use of the business model components in the information technology (IT) projects management process in enterprises. To achieve this goal, this exploratory research has investigated the use of the Business Model concept in the information technology projects management, by a survey applied to 327 professionals from February to April 2012. It was observed that the business model concept, as well as its practices or its blocks, are not so well explored in its whole potential, possibly because it is relatively new. One of the benefits of this conceptual tool is to provide an understanding in terms of the core business for different areas, enabling a higher level of knowledge in terms of the essential activities of the enterprise IT professionals and the business area.
Resumo:
A synopsis and preparation presentation of a Society of American Archivists pre-conference workshop (workshop held on August 17, 2015.
Resumo:
Changing has been addressed by projects and it had happened in a fast and disarrenged way. In consequence of the increasing on demand for projects, to get better success rate is essential manage projects adequately. The creation of an organitional structure intended to concentrate the development of process and methodologies is a great initiative to spread the projects management concepts. The purpose of this work is to apply a model to analyse the maturity level on project management of the Petrobras IT Department and indicate an Project Management Office adequated to the level found, that could be improved with the increase of the maturity level.
Resumo:
Em um mundo onde a questão da necessidade de se preservar o meio ambiente e de movimentos socialmente responsáveis em alta, este trabalho surgiu da curiosidade de se buscar entender o binômio do desenvolvimento econômico versus o desenvolvimento sustentável, visando compreender como se deu a evolução desta relação em grandes projetos hidrelétricos brasileiros. Neste contexto, os levantamentos de acontecimentos à época da construção de Itaipu serviram de base comparativa para o que hoje está sendo vivenciado pela hidrelétrica de Santo Antônio. É fato que projetos desse porte vão causar impactos e externalidades, porém como, hoje estão sendo tratadas, é algo que pode nortear o andamento futuro de sua gestão. Por isso, questões como a preservação da fauna e flora, reassentamento e desenvolvimento local, foram colocadas na pauta para verificação de como, ainda hoje, mesmo com o avanço da tecnologia e com pressões externas a respeito da questão sustentável, as externalidades desses projetos são as mesmas. As luzes das teorias apresentadas de Responsabilidade Social Corporativa, desenvolvimento sustentável e econômico, além da estruturação dos movimentos sociais, servirão de base para entender as questões apresentadas. Identificou-se que o sacrifício de poucos para usufruto de muitos continua a ser uma das principais questões a ser resolvida, e neste, inclui-se a questão da terra, assim como a não integração entre stakeholders e shareholders para se conseguir em alinhamento a melhor forma de se aproveitar e interagir com o meio em que será inserido o empreendimento, a exclusão política dos stakeholders do processo decisório sobre os projetos hidrelétricos a serem implementados.
Resumo:
O desenvolvimento de Sistemas de Gestão da Segurança e Saúde no Trabalho (SGSST) ganha um significado cada vez mais importante no desempenho das empresas, pois, por meio deles, é possível obter a promoção da saúde e satisfação dos trabalhadores e a redução dos riscos de acidentes. No entanto, para que um SGSST obtenha bons resultados, as empresas precisam estar atentas às dificuldades comumente encontradas durante o seu processo de implantação, procurando solucioná-las de maneira antecipada e estruturada. Pelo exposto, este trabalho tem como principal objetivo apresentar diretrizes, baseadas no referencial teórico e nos resultados dos estudos de caso realizados, para implantação de SGSSTs em empresas fabricantes de baterias automotivas. Para o seu desenvolvimento adotou-se o método de pesquisa qualitativa a partir da realização de dois estudos de caso em empresas fabricantes de baterias automotivas localizadas na cidade de Bauru. Os instrumentos de coleta de dados foram entrevistas semiestruturadas, análise de documentos e observação in loco. Ao final do artigo, são propostas diretrizes relacionadas aos seguintes elementos: alta direção, estratégia organizacional, cultura organizacional, departamento de Segurança e Saúde do Trabalho (SST), técnicos de SST, recursos humanos, treinamento, equipes multidisciplinares, comunicação interna, resistência à mudança, indicadores de desempenho, ferramentas gerenciais para solução de problemas de SST, gestão de projetos, recompensas e incentivos, e integração do sistema.