955 resultados para Assessing


Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Some polycyclic aromatic hydrocarbons (PAHs) are ubiquitous in air and have been implicated as carcinogenic materials. Therefore, literature is replete with studies that are focused on their occurrence and profiles in indoor and outdoor air samples. However, because the relative potency of individual PAHs vary widely, health risks associated with the presence of PAHs in a particular environment cannot be extrapolated directly from the concentrations of individual PAHs in that environment. In addition, database on the potency of PAH mixtures is currently limited. In this paper, we have utilized multi-criteria decision making methods (MCDMs) to simultaneously correlate PAH-related health risk in some microenvironments to the concentration levels, ethoxyresorufin-O-deethylase (EROD) activity induction equivalency factors and toxic equivalency factors (TEFs) of PAHs found in those microenvironments. The results showed that the relative risk associated with PAHs in different air samples depends on the index used. Nevertheless, this approach offers a promising tool that could help identify microenvironments of concern and assist the prioritisation of control strategies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Abstract Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objective: To assess extent of coder agreement for external causes of injury using ICD-10-AM for injury-related hospitalisations in Australian public hospitals. Methods: A random sample of 4850 discharges from 2002 to 2004 was obtained from a stratified random sample of 50 hospitals across four states in Australia. On-site medical record reviews were conducted and external cause codes were assigned blinded to the original coded data. Code agreement levels were grouped into the following agreement categories: block level, 3-character level, 4-character level, 5th-character level, and complete code level. Results: At a broad block level, code agreement was found in over 90% of cases for most mechanisms (eg, transport, fall). Percentage disagreement was 26.0% at the 3-character level; agreement for the complete external cause code was 67.6%. For activity codes, the percentage of disagreement at the 3-character level was 7.3% and agreement for the complete activity code was 68.0%. For place of occurrence codes, the percentage of disagreement at the 4-character level was 22.0%; agreement for the complete place code was 75.4%. Conclusions: With 68% agreement for complete codes and 74% agreement for 3-character codes, as well as variability in agreement levels across different code blocks, place and activity codes, researchers need to be aware of the reliability of their specific data of interest when they wish to undertake trend analyses or case selection for specific causes of interest.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Shared Services (SS) involves the convergence and streamlining of an organisation’s functions to ensure timely service delivery as effectively and efficiently as possible. As a management structure designed to promote value generation, cost savings and improved service delivery by leveraging on economies of scale, the idea of SS is driven by cost reduction and improvements in quality levels of service and efficiency. Current conventional wisdom is that the potential for SS is increasing due to the increasing costs of changing systems and business requirements for organisations and in implementing and running information systems. In addition, due to commoditisation of large information systems such as enterprise systems, many common, supporting functions across organisations are becoming more similar than not, leading to an increasing overlap in processes and fuelling the notion that it is possible for organisations to derive benefits from collaborating and sharing their common services through an inter-organisational shared services (IOSS) arrangement. While there is some research on traditional SS, very little research has been done on IOSS. In particular, it is unclear what are the potential drivers and inhibitors of IOSS. As the concepts of IOSS and SS are closely related to that of Outsourcing, and their distinction is sometimes blurred, this research has the first objective of seeking a clear conceptual understanding of the differences between SS and Outsourcing (in motivators, arrangements, benefits, disadvantages, etc) and based on this conceptual understanding, the second objective of this research is to develop a decision model (Shared Services Potential model) which would aid organisations in deciding which arrangement would be more appropriate for them to adopt in pursuit of process improvements for their operations. As the context of the study is on universities in higher education sharing administrative services common to or across them and with the assumption that such services were homogenous in nature, this thesis also reports on a case study. The case study involved face to face interviews from representatives of an Australian university to explore the potential for IOSS. Our key findings suggest that it is possible for universities to share services common across them as most of them were currently using the same systems although independently.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Information graphics have become increasingly important in representing, organising and analysing information in a technological age. In classroom contexts, information graphics are typically associated with graphs, maps and number lines. However, all students need to become competent with the broad range of graphics that they will encounter in mathematical situations. This paper provides a rationale for creating a test to measure students’ knowledge of graphics. This instrument can be used in mass testing and individual (in-depth) situations. Our analysis of the utility of this instrument informs policy and practice. The results provide an appreciation of the relative difficulty of different information graphics; and provide the capacity to benchmark information about students’ knowledge of graphics. The implications for practice include the need to support the development of students’ knowledge of graphics, the existence of gender differences, the role of cross-curriculum applications in learning about graphics, and the need to explicate the links among graphics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document outlines a framework that could be used by government agencies in assessing policy interventions aimed at achieving social outcomes from government construction contracts. The framework represents a rational interpretation of the information gathered during the multi-outcomes construction policies project. The multi-outcomes project focused on the costs and benefits of using public construction contracts to promote the achievement of training and employment and public art objectives. The origin of the policy framework in a cost-benefit appraisal of current policy interventions is evidenced by its emphasis on sensitivity to policy commitment and project circumstances (especially project size and scope).The quantitative and qualitative analysis conducted in the multi-outcomes project highlighted, first, that in the absence of strong industry commitment to policy objectives, policy interventions typically result in high levels of avoidance activity, substantial administrative costs and very few benefits. Thus, for policy action on, for example, training or local employment to be successful compliance issues must be adequately addressed. Currently it appears that pre-qualification schemes (similar to the Priority Access Scheme) and schemes that rely on measuring, for example, the training investments of contractors within particular projects do not achieve high levels of compliance and involve significant administrative costs. Thus, an alternative is suggested in the policy framework developed here: a levy on each public construction project – set as a proportion of the total project costs. Although a full evaluation of this policy alternative was beyond the scope of the multi-outcomes construction policies project, it appears to offer the potential to minimize the transaction costs on contractors whilst enabling the creation of a training agency dedicated to improving the supply of skilled construction labour. A recommendation is thus made that this policy alternative be fully researched and evaluated. As noted above, the outcomes of the multi-outcomes research project also highlighted the need for sensitivity to project circumstances in the development and implementation of polices for public construction projects. Ideally a policy framework would have the flexibility to respond to circumstances where contractors share a commitment to the policy objectives and are able to identify measurable social outcomes from the particular government projects they are involved in. This would involve a project-by-project negotiation of goals and performance measures. It is likely to only be practical for large, longer term projects.