885 resultados para 690 Buildings
Resumo:
Current research agendas are increasingly encouraging the construction industry to operate on the basis of 'added value'. Such debates echo the established concept of 'high value manufacturing' and associated trends towards servitization. Within construction, the so-called 'value agenda' draws heavily from the notion of integrated solutions. This is held to be especially appropriate in the context of PFI projects. Also relevant is the concept of service-led projects whereby the project rationale is driven by the client's objectives for delivering an enhanced service to its own customers. Such ideas are contextualized by a consideration of broader trends of privatization and outsourcing within and across the construction industry's client base. The current emphasis on integrated solutions reflects long-term trends within privatized client organizations towards the outsourcing of asset management capabilities. However, such trends are by no means uniform or consistent. An in-depth case study of three operating divisions within a major construction company illustrates that firms are unlikely to reorientate their business in response to the 'value agenda'. In the case of PFI, the tendency has been to establish specialist units for the purposes of winning work. Meanwhile, institutionally embedded operating routines within the rest of the business remain broadly unaffected.
Resumo:
This book is aimed primarily at students for whom the study of building or civil engineering contracts forms part of a construction-based course. We have had in mind the syllabus requirements for first degrees in Building, Civil Engineering, Architecture, Quantity Surveying and Building Surveying, as well as those of postgraduate courses in Construction Management and Project Management. We have also assumed that such students will already have been introduced to the general principles of English law, especially those relating to contract and tort. As a result, while aspects of those subjects that are of particular relevance to construction are dealt with here, the reader must look elsewhere for the general legal background. In producing this third edition, we have again been greatly assisted by the many helpful comments made by reviewers and users of its predecessor. Nonetheless, our basic aim is identical to that which underpinned the first edition: to provide an explanation of the fundamental principles of construction contract law, rather than a clause-by-clause analysis of any particular standard-form contract. As a result, while we draw most frequently upon JCT 98 for our illustrations of particular points, this merely reflects the pre-eminent position occupied by that particular form of contract in the UK construction industry. We conclude by repeating our previous warning as to the dangers inherent in a little learning. Neither this book, nor the courses for which it is intended, seek to produce construction lawyers. The objective is rather to enable those who are not lawyers to resolve simple construction disputes before they become litigious, and to recognize when matters require professional legal advice. It should be the aim of every construction student to understand the legal framework sufficiently that they can instruct and brief specialist lawyers, and this book is designed to help them towards that understanding.
Resumo:
The purpose of this document is to provide a single source of reference for every paper published in the journals directly related to research in Construction Management. It is indexed by author and keyword and contains the titles, authors, abstracts and keywords of every article from the following journals: • Building Research and Information (BRI) • Construction Management and Economics (CME) • Engineering, Construction and Architectural Management (ECAM) • Journal of Construction Procurement (JCP) • Journal of Construction Research (JCR) • Journal of Financial Management in Property and Construction (JFM) • RICS Research Papers (RICS) The index entries give short forms of the bibliographical citations, rather than page numbers, to enable annual updates to the abstracts. Each annual update will carry cumulative indexes, so that only one index needs to be consulted.
Resumo:
The purpose of this document is to provide a single source of reference for every paper published in the journals directly related to research in Construction Management. This volume brings together articles published during 1999. It is indexed by author and keyword and contains the titles, authors, abstracts and keywords of every article from the following journals: • Building Research and Information (BRI) • Construction Management and Economics (CME) • Engineering, Construction and Architectural Management (ECAM) • Journal of Construction Procurement (JCP) • RICS Research Papers (RICS) The index entries give short forms of the bibliographical citations, rather than page numbers, to enable rapid reference to articles. A cumulative volume is available from the editor. Included in this volume is an appendix listing a wide range of journals associated with construction management research, giving details of frequency, editorial addresses and web sites, as well as whether each journal is international and/or refereed.
Resumo:
Recent developments in contracting practice in the UK have built upon recommendations contained in highprofile reports, such as those by Latham and Egan. However, the New Engineering Contract (NEC), endorsed by Latham, is based upon principles of contract drafting that seem open to question. Any contract operates in the context of its legislative environment and current working practices. This report identifies eight contentious hypotheses in the literature on construction contracts and tests their validity in a sample survey that attracted 190 responses. The survey shows, among other things, that while partnership is a positive and useful idea, authoritative contract management is considered more effective and that “win-win” contracts, while desirable, are basically impractical. Further, precision and fairness in contracts are not easy to achieve simultaneously. While participants should know what is in their contracts, they should not routinely resort to legal action; and standard-form contracts should not seek to be universally applicable. Fundamental changes to drafting policy should be undertaken within the context of current legal contract doctrine and with a sensitivity to the way that contracts are used in contemporary practice. Attitudes to construction contracting may seem to be changing on the surface, but detailed analysis of what lies behind apparent agreement on new ways of working reveals that attitudes are changing much more slowly than they appear to be.
Development of Thermally Comfortable Industrial Buildings with Effective Use of Computer Simulations
Resumo:
With the accelerated trend of global warming, the thermal behavior of existing buildings, which were typically designed based on current weather data, may not be able to cope with the future climate. This paper quantifies, through computer simulations, the increased cooling loads imposed by potential global warming and probable indoor temperature increases due to possible undersized air-conditioning system. It is found from the sample office building examined that the existing buildings would generally be able to adapt to the increasing warmth of 2030 year Low and High scenarios projections and 2070 year Low scenario projection. However, for the 2070 year High scenario, the study indicates that the existing office buildings, in all capital cities except for Hobart, will suffer from overheating problems. When the annual average temperature increase exceeds 2°C, the risk of current office buildings subjected to overheating will be significantly increased. For existing buildings which are designed with current climate condition, it is shown that there is a nearly linear correlation between the increase of average external air temperature and the increase of building cooling load. For the new buildings, in which the possible global warming has been taken into account in the design, a 28-59% increase of cooling capacity under 2070 High scenario would be required to improve the building thermal comfort level to an acceptable standard.