949 resultados para 660201 Hydro-electric


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper introduces a novel load sharing algorithm to enable island synchronization. The system model used for development is based on an actual system for which historical measurement and fault data is available and is used to refine and test the algorithms performance and validity. The electrical system modelled is selected due to its high-level of hydroelectric generation and its history of islanding events. The process of developing the load sharing algorithm includes a number of steps. Firstly, the development of a simulation model to represent the case study accurately - this is validated by way of matching system behavior based on data from historical island events. Next, a generic island simulation is used to develop the load sharing algorithm. The algorithm is then tested against the validated simulation model representing the case study area selected. Finally, a laboratory setup is described which is used as validation method for the novel load sharing algorithm.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sir Adam Beck ( a London, Ontario manufacturer, Mayor and Conservative member of the provincial legislature) was a champion of municipal and provincial power ownership. Beck become the “Power Minister” and chairman of the Hydro-Electric Power Commission of Ontario which was the world’s first publicly owned utility. In 1925 the first unit of the Hydro Electric Power Commission’s Queenston Chippawa hydro-electric development on the Niagara River went into service. The station was renamed in 1950 as “Sir Adam Beck #1”. This marked the 25th anniversary of Beck’s death. This is one of 2 generating stations in Niagara Falls. There is also Adam Beck Plant #2. The Niagara generating stations supply one quarter of all power used in New York State and Ontario.Ontario Hydro has two water tunnels which traverse the entire City of Niagara Falls from the Village of Chippawa in the South to the Sir Adam Beck Hydro Electric Generating Stations in the North. Also they are in the process of building the third tunnel. In addition, Ontario Hydro has a 13.6 km open canal which traverses the entire City of Niagara Falls. Source: http://www.hydroone.com/OurCompany/Pages/OurHistory.aspx

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Public Ownership League of America Conference, September 10th to 13th, 1923, at Toronto, Ontario.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We present a simulator of a hydropower company’s view of its scheme, and its broader market and network context, which has been developed to evaluate advanced displays for control room operations. Although simplified, the simulator captures all the main aspects of scheme operations. The simulator allows controlled studies to be performed that test the effectiveness of current vs advanced display concepts under normal vs unexpected operating conditions that can be scripted into the simulator.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We present the design rationale and basic workings of a low-cost, easy-to-use power system simulator developed to support investigations into human interface design for a hydropower plant. The power system simulator is based on three important components: models of power system components, a data repository, and human interface elements. Dynamic Data Exchange (DDE) allows simulator components to communicate with each other within the simulator. To construct the modules of the simulator we have combined the advantages of commercial software such as Matlab/Simulink, ActiveX Control, Visual Basic and Excel and integrated them in the simulator. An important advantage of our approach is that further components of the simulator now can be developed independently. An initial assessment of the simulator indicates it is fit for intended purpose.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A brochure for Ontario Hydro marking the 50 year Jubilee. The brochure also describes the change over from 25 cycle to 60 cycle service. A map details the areas that have made the change to 60 cycle power and those still waiting to transition. There is also a section of eight questions and answers concerning the change to 60 cycle power.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This research employs econometric analysis on a cross section of American electricity companies in order to study the cost implications associated with unbundling the operations of integrated companies into vertically and/or horizontally separated companies. Focusing on the representative sample average firm, we find that complete horizontal and vertical disintegration resulting in the creation of separate nuclear, conventional, and hydro electric generation companies as well as a separate firm distributing power to final consumers, results in a statistically significant 13.5 percent increase in costs. Maintaining a horizontally integrated generator producing nuclear, conventional, and hydro electric generation while imposing vertical separation by creating a stand alone distribution company, results in a lower but still substantial and statistically significant cost penalty amounting to an 8.1 % increase in costs relative to a fully integrated structure. As these results imply that a vertically separated but horizontally integrated generation firm would need to reduce the costs of generation by 11% just to recoup the cost increases associated with vertical separation, even the costs associated with just vertical unbundling are quite substantial. Our paper is also the first academic paper we are aware of that systematically considers the impact of generation mix on vertical, horizontal, and overall scope economies. As a result, we are able to demonstrate that the estimated cost of unbundling in the electricity sector is substantially influenced by generation mix. Thus, for example, we find evidence of strong vertical integration economies between nuclear and conventional generation, but little evidence for vertical integration benefits between hydro generation and the distribution of power. In contrast, we find strong evidence suggesting the presence of substantial horizontal integration economies associated with the joint production of hydro generation with nuclear and/or conventional fossil fuel generation. These results are significant because they indicate that the cost of unbundling the electricity sector will differ substantially in different systems, meaning that a blanket regulatory policy with regard to the appropriateness of vertical and horizontal unbundling is likely to be inappropriate.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This research aims to explore and identify political risks on a large infrastructure project in an exaggerated environment to ascertain whether sufficient objective information can be gathered by project managers to utilise risk modelling techniques. During the study, the author proposes a new definition of political risk; performs a detailed project study of the Neelum Jhelum Hydroelectric Project in Pakistan; implements a probabilistic model using the principle of decomposition and Bayes probabilistic theorem and answers the question: was it possible for project managers to obtain all the relevant objective data to implement a probabilistic model?

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The physico-chemical parameters of the surface water of Shiroro Lake and its major tributaries at their entry point to the reservoir were assessed over a period of eighteen months. As in other African inland water bodies there were seasonal variations in the parameters measured. The hydrological regime of the lake, precipitation chemistry, bedrock chemistry and hydro-electric power generation influence and determine the inputs of dissolved organic carbon, nutrient levels and water quality of the lake. The added nutrients to the lake by means of the major tributary rivers and inundation of surrounding areas also influence the water quality of the lake. The wet season mean values for water and air temperature were significantly (P <0.05) higher than dry season mean values in all stations. However, for pH, Dissolved oxygen and Phosphate-phosphorus the dry season mean values were higher than wet season mean values

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The inland fresh waters of the island can be roughly divided into the following as far as fish production is concerned: (a) Perennial shallow irrigation reservoirs of the low-country, comprising about 120,000 acres. (b) " Villus" or flood lakes of the low country many of which are perennial, comprising about 30,000 acres. (c) Seasonal village tanks, mainly in the low-country, comprising about 30,000 acres. (d) Deep reservoirs (irrigation as well as hydro-electric) occurring in up-country and low-country comprising about 50,000 acres. (e) Rivers and streams comprising about 20,000 acres. The total area of all these waters is about 250,000 acres.