999 resultados para 13368-014
Resumo:
OBJECTIVE: Theoretical and empirical analysis of items and internal consistency of the Portuguese-language version of Social Phobia and Anxiety Inventory (SPAI-Portuguese). METHODS: Social phobia experts conducted a 45-item content analysis of the SPAI-Portuguese administered to a sample of 1,014 university students. Item discrimination was evaluated by Student's t test; interitem, mean and item-to-total correlations, by Pearson coefficient; reliability was estimated by Cronbach's alpha. RESULTS: There was 100% agreement among experts concerning the 45 items. On the SPAI-Portuguese 43 items were discriminative (p < 0.05). A few inter-item correlations between both subscales were below 0.2. The mean inter-item correlations were: 0.41 on social phobia subscale; 0.32 on agoraphobia subscale and 0.32 on the SPAI-Portuguese. Item-to-total correlations were all higher then 0.3 (p < 0.001). Cronbach's alphas were: 0.95 on the SPAI-Portuguese; 0.96 on social phobia subscale; 0.85 on agoraphobia subscale. CONCLUSION: The 45-item content analysis revealed appropriateness concerning the underlying construct of the SPAI-Portuguese (social phobia, agoraphobia) with good discriminative capacity on 43 items. The mean inter-item correlations and reliability coefficients demonstrated the SPAI-Portuguese and subscales internal consistency and multidimensionality. No item was suppressed in the SPAI-Portuguese but the authors suggest that a shortened SPAI, in its different versions, could be an even more useful tool for research settings in social phobia.
Resumo:
The city of Ankeny is submitting this WIRB application for development of green urban stormwater practices on city and private property in the Fourmile Creek watershed. The stormwater project proposed includes stream restoration of the SE Tributary to Fourmile Creek (Tributary B), including weirs, bank shaping, toe protection, trees, and native plantings. The project also includes the creation of a native buffer along the stream channel in the city’s Summerbrook Park, installing four native planting beds, installing a pervious surface trail, installing a series of rain gardens/biorentention cells, and installing educational signage. Polk County Soil and Water Conservation District has committed $17,000 towards the native buffer and rain garden/biorentention cell. The city of Ankeny was also awarded a $100,000 I-JOBS grant from IDNR to complete the stormwater retrofit practices. The largest component of this project is public education. Our vision for this project is to take the entire 281 acre watershed and address it as a whole. We want to make a collaborative watershed that not only addresses the water entering the stream channel through adjacent properties, but takes each individual parcel within the watershed and strives to reduce contributions to the stormwater system. The stormwater issues of concern for Tributary B include stormwater volume, sediment, and nutrients. The stream restoration, best management practices (BMP) at Summerbrook Park, and BMPs on private property should help decrease the volume of stormwater and reduce the amount of sediment and nutrients that enter Tributary B and ultimately Fourmile Creek.
Resumo:
This project brings together rural and urban partners to address the impairment of Miners Creek, a cold water trout stream in Northeast Iowa. It eliminates point source pollution contributions from the City of Guttenberg, decreases non-point source pollution and increases in-stream and near stream habitat in the Miners Creek Watershed. It specifically eliminates sewage and storm water runoff from the City of Guttenberg into Miners Creek; it develops, enhances and preserves wetlands; reduces direct livestock access to the. stream through rotational grazing systems; completes stream bank stabilizatio11 and in-stream habitat creation; targets upland land treatment; and promotes targeted application of continuous CRP and forestry practices. This project recognizes that non-point source pollution improvements could be hampered by point source pollutants ihat inhibit biologic reproduction and survival. It takes appropliate measures to improve all aspects of the stream ecosystem.
Resumo:
3D engineered modeling is a relatively new and developing technology that can provide numerous benefits to owners, engineers, contractors, and the general public. This manual is for highway agencies that are considering or are in the process of switching from 2D plan sets to 3D engineered models in their highway construction projects. It will discuss some of the benefits, applications, limitations, and implementation considerations for 3D engineered models used for survey, design, and construction. Note that is not intended to cover all eventualities in all states regarding the deployment of 3D engineered models for highway construction. Rather, it describes how one state—Iowa—uses 3D engineered models for construction of highway projects, from planning and surveying through design and construction.
Resumo:
The Mitchell County Soil and Water Conservation District is applying on behalf of the incorporated community of Carpenter to construct a wastewater collection and treatment system to assist in the environmental cleanup and protection of Deer Creek. IDNR water monitoring of the community tile line has shown consistently elevated levels of fecal coliform bacteria indicating the presence of untreated sewage water. These are obvious health threats to the downstream users and wildlife in Deer Creek and the Cedar River. A new sewer system for the community of Carpenter will eliminate illegal discharges into the creed and be the first step in the overall protection of the stream.
Resumo:
The Watershed Improvement Review Board (WIRB) Grant will be used to enhance an on-going water quality project in Elk River Watershed. A targeted, locally controlled project has been active in the watershed since 2001. Current funding is being received primarily from the EPA-319 program, administrated by IDNR and the Watershed Protection Fund (WSPF) administrated by IDALS-DSC. Substantial funding is also obtained from the yearly county allocation of the Environmental Quality Incentive Program (EQIP) administrated by the USDA-NRCS. The overall objective of the Elk River Water Quality Project is to improve and restore the water quality in this water body by keying in on the potential sources of the identified impairments, and forging a working partnership between the local residents and the conservation agencies and organizations involved in the project. The major potential sources of the known surface water quality problems were identified during the assessment process and pointed to feedlot runoff and sediment delivery from within priority sub-watersheds. WIRB Funds will be used to cost share the application of Best Management Practices, thus reducing the projects dependency on federal funds. Funds will also be used to overcome a project’s limiting factor associated with insufficient technical assistance.
Resumo:
Twelve Mile Creek Lake is a 660 acre, Significant Publicly Owned Lake with a watershed of 14,820 acres for a ratio of 21:3. The watershed is predominately privately owned agricultural land that originates in Adair County and drains into the lake which serves as the primary source water for the City of Creston, Union County and the seven counties served by the Southern Iowa Rural Water Association. In recent years, frequent algae blooms and recurrent spikes in suspended solid concentrations have been inflating water treatment expenses for the Creston Municipal Utilities (CMU). Declining trends in water quality spurred CMU to enlist the Union Soil and Water Conservation District (SWCD) to assist in evaluating watershed conditions for potential upland improvements. Significant gully erosion issues that had been previously underestimated were discovered during this watershed assessment process. Newly acquired LiDAR elevation data readily revealed this concern which was previously obscured from view by the dense tree canopy. A Watershed Development and Planning Assistance Grant Application was approved and funded by the Iowa Department of Ag and Land Stewardship- Division of Soil Conservation. Throughout the planning process, project partners innovatively evaluated and prioritized a number of resource concerns throughout the watershed. The implementation plan presented will thwart these threats which left unaided will continue to diminish the overall health of the system, reduce the appeal of the lake to recreational users, and contribute to higher water treatment costs.
Resumo:
Bridge expansion joints, if not properly designed, constructed, and maintained, often lead to the deterioration of critical substructure elements. Strip seal expansion joints consisting of a steel extrusion and neoprene gland are one type of expansion joint and are commonly used by the Iowa Department of Transportation (DOT). Strip seal expansion joints are susceptible to tears and pull outs that allow water, chlorides, and debris to infiltrate the joint, and subsequently the bearings below. One area of the strip seal that is particularly problematic is where it terminates at the interface between the deck and the barrier rail. The Iowa DOT has noted that the initial construction quality of the current strip seal termination detail is not satisfactory, nor ideal, and a need exists for re-evaluation and possibly re-design of this detail. Desirable qualities of a strip seal termination detail provide a seal that is simple and fast to construct, facilitate quick gland removal and installation, and provide a reliable, durable barrier to prevent chloride-contaminated water from reaching the substructure. To meet the objectives of this research project, several strip seal termination details were evaluated in the laboratory. Alternate termination details may not only function better than the current Iowa DOT standard, but are also less complicated to construct, facilitating better quality control. However, uncertainties still exist regarding the long-term effects of using straight-through details, with or without the dogleg, that could not be answered in the laboratory in the short time frame of the research project.
Resumo:
The current means and methods of verifying that high-strength bolts have been properly tightened are very laborious and time consuming. In some cases, the techniques require special equipment and, in other cases, the verification itself may be somewhat subjective. While some commercially available verification techniques do exist, these options still have some limitations and might be considered costly options. The main objectives of this project were to explore high-strength bolt-tightening and verification techniques and to investigate the feasibility of developing and implementing new alternatives. A literature search and a survey of state departments of transportation (DOTs) were conducted to collect information on various bolt-tightening techniques such that an understanding of available and under-development techniques could be obtained. During the literature review, the requirements for materials, inspection, and installation methods outlined in the Research Council on Structural Connections specification were also reviewed and summarized. To guide the search for finding new alternatives and technology development, a working group meeting was held at the Iowa State University Institute for Transportation October 12, 2015. During the meeting, topics central to the research were discussed with Iowa DOT engineers and other professionals who have relevant experiences.