820 resultados para 1011


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Approximately 40,000 tons of slightly damaged asphalt concrete has been removed from Interstate 80 in Cass and stockpiled. Laboratory tests had indicated that this material had considerable value when upgraded with new aggregate and asphalt cement. This report documents the procedures used and results obtained on an experimental recycling project. It was demonstrated that present drum mixing-recycling equipment and procedures can be used to utilize this material with satisfactory results. Laboratory analyses of material components and mixtures were performed; these analyses indicate mixture can be produced that is uniform, stable, and very closely resembles mixture produced with all new material. Follow~up evaluations will be made to determine the effects of traffic and environment. Preliminary data indicate that plans should be made to incorporate the stockpiled material in projects near the stockpile site.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Approximately 40,000 tons of deteriorated asphalt concrete has been removed from Interstate 80 in Cass County and stockpiled. Laboratory tests indicate that this material has considerable value when upgraded with new aggregate and asphalt cement. This report documents the procedures used and results obtained on an experimental recycling project. It was demonstrated that present drum mixing-recycling equipment and procedures can be used to utilize this material with satisfactory results. Laboratory analyses of material components and mixtures were performed; these analyses indicate mixture can be produced that is uniform, stable, and very closely resembles mixture produced with all virgin material. A 1700 foot long test section was constructed on US 169 in Kossuth County wherein salvaged asphalt concrete from I-80 in Cass County was utilized. The salvaged mix was blended with virgin aggregate and recycled through a modified drum mixing plant, the reprocessed mixture was satisfactorily placed 1 1/2 inches thick as a resurfacing course on an old PCC pavement. An inspection of the test section was made in December of 1978 to evaluate the performance after one full year of service. There was no evidence of rutting or shoving from traffic. The surface does, however, have a very dry and somewhat ravelled appearance. This can be related to a low asphalt content in the mix and some temperature control problems which were difficult to get fully corrected on such a short project and with a short supply of readily available materials.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Competine Creek watershed is a 24,956 acre sub-watershed of Cedar Creek. The creek traverses portions of three counties, slicing through rich and highly productive Southern lowa Drift Plain soils. The watershed is suffering from excessive sediment delivery and frequent flash floods that have been exacerbated by recent high rainfall events. Assessment data reveals soil erosion estimated to be 38,435 tons/year and sediment delivery to the creek at 15,847 tons/year. The Competine Creek Partnership Project is seeking WIRB funds to merge with IDALS-DSC funds and local funds, all targeted for structural Best Management Practices (BMPs) within the 2,760 acres of High Priority Areas (HPAs) identified by the assessment process. The BMPs will include grade stabilization structures, water and sediment basins, tile-outlet terraces, CRP, and urban storm water conservation practices. In addition, Iowa State University Extension-Iowa Learning Farm is investing in the project by facilitating a crop sampling program utilizing fall stalk nitrate, phosphorous index, and soil conditioning index testing. These tests will be used by producers as measures of performance to refine nutrient and soil loss management and to determine effective alternatives to reduce sediment and nutrient delivery to Competine Creek.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Although sugarcane consumption is very popular worldwide there are few studies regarding the postharvest storage of stalks that focus on controlling enzymatic browning. The objective of this study was to evaluate the quality of sugarcane stalks stored at 10±1°C in controlled atmosphere with various oxygen (O2) levels (1kPa, 5kPa, 10kPa, 15kPa, and 21kPa) and to verify the effect of this storage on the activities of polyphenoloxidase (PPO) and peroxidase (POD). At 1kPa and 5kPa O2, the stalks' respiratory rate, POD activity, and reducing sugar content were significantly less (P<0.05) than at higher O2 concentrations. In contrast, low O2 levels did not affect PPO activity or influence cane coloration. These results can be used to guide the choice of plastic films, making it possible to store sugarcane stalks in a controlled atmosphere. © 2013 Elsevier B.V.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Eugene L. Barnwell Papers consist of correspondence, newspaper clippings, speeches, training materials, memorabilia, and personal reflections concerning his life and careers in music and public service including his service as mayor of York, SC from 1982-1991. Of particular interest among the Barnwell Papers is his study of municipal management relative to a council/manager form of government.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A second major change mandates all law enforcement agencies to submit for analysis all criminal SA cases in their possession which had not previously been submitted to a forensic laboratory (Section 20 of the Act). To determine the impact of Section 20 on the forensic laboratories, the ISP established mechanisms for agencies to submit an inventory list of SA cases in their custody by October 15, 2010. The ISP then distributed each agency's list to the forensic laboratory to which the agency would normally submit cases. Each laboratory would then clarify information and resolve questions with the agency, as necessary. As of February 1, 2011, of the 999 law enforcement agency offices required to submit an inventory list to the ISP, 860 (or 86 percent) complied ... Based on the information from the compliant agencies, approximately 4,143 criminal SA cases are anticipated to be submitted pursuant to Section 20 of the Act.