998 resultados para tree training


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Emulsions containing liquid crystals present interesting properties and advantages such as the skin moisturize increase, active release modulation, and emulsion stabilization. In this work, emulsions containing annatto, coffee and tea tree oils, and nonionic surfactants were developed. The HLB method was used for selection of surfactants. The required HLB value was established (9.0). Liquid crystals were attained when used the surfactant mixture Ceteareth-5 and Steareth-2 and identified as lamellar. The emulsions showed pseudoplastic behavior and tixotropy. The ternary diagram was useful in the selection of the proportion of surfactant and oily phase considering skin compatibility and liquid crystal presence.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study aims to evaluate the feasibility of using simple techniques - pollen abortion rates, passive diffusive tubes (NO(2)) and trace element accumulation in tree barks - when determining the area of influence of pollution emissions produced in a traffic corridor. Measurements were performed at 0, 60 and 120 meters from a major road with high vehicular traffic, taking advantage of a sharp gradient that exists between the road and a cemetery. NO(2) values and trace elements measured at 0 meters were significantly higher than those measured at more distant points. Al, S. Cl, V. Fe, Cu, and Zn exhibited a higher concentration in tree barks at the vicinity of the traffic corridor. The same pattern was observed for the pollen abortion rates measured at the three different sites. Our data suggests that simple techniques may be applied either to validate dispersion land-based models in an urban settings or, alternatively, to provide better spatial resolution to air pollution exposure when high-resolution pollution monitoring data are not available. (C) 2011 Elsevier B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Although it has long been supposed that resistance training causes adaptive changes in the CNS, the sites and nature of these adaptations have not previously been identified. In order to determine whether the neural adaptations to resistance training occur to a greater extent at cortical or subcortical sites in the CNS, we compared the effects of resistance training on the electromyographic (EMG) responses to transcranial magnetic (TMS) and electrical (TES) stimulation. Motor evoked potentials (MEPs) were recorded from the first dorsal interosseous muscle of 16 individuals before and after 4 weeks of resistance training for the index finger abductors (n = 8), or training involving finger abduction-adduction without external resistance (n = 8). TMS was delivered at rest at intensities from 5 % below the passive threshold to the maximal output of the stimulator. TMS and TES were also delivered at the active threshold intensity while the participants exerted torques ranging from 5 to 60 % of their maximum voluntary contraction (MVC) torque. The average latency of MEPs elicited by TES was significantly shorter than that of TMS MEPs (TES latency = 21.5 ± 1.4 ms; TMS latency = 23.4 ± 1.4 ms; P < 0.05), which indicates that the site of activation differed between the two forms of stimulation. Training resulted in a significant increase in MVC torque for the resistance-training group, but not the control group. There were no statistically significant changes in the corticospinal properties measured at rest for either group. For the active trials involving both TMS and TES, however, the slope of the relationship between MEP size and the torque exerted was significantly lower after training for the resistance-training group (P < 0.05). Thus, for a specific level of muscle activity, the magnitude of the EMG responses to both forms of transcranial stimulation were smaller following resistance training. These results suggest that resistance training changes the functional properties of spinal cord circuitry in humans, but does not substantially affect the organisation of the motor cortex.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Atherosclerotic plaque contains apoptotic endothelial cells with oxidative stress implicated in this process. Vitamin E and a-lipoic acid are a potent antioxidant combination with the potential to prevent endothelial apoptosis. Regular exercise is known to increase myocardial protection, however, little research has investigated the effects of exercise on the endothelium. The purpose of these studies was to investigate the effects of antioxidant supplementation and/or exercise training on proteins that regulate apoptosis in endothelial cells. Male rats received a control or antioxidant-supplemented diet (vitamin E and alpha-lipoic acid) and were assigned to sedentary or exercise-trained groups for 14 weeks. Left ventricular endothelial cells (LVECs) were isolated and levels of the anti-apoptotic protein Bcl-2 and the pro-apoptotic protein Bax were measured. Antioxidant supplementation caused a fourfold increase in Bcl-2 (P < 0.05) with no change in Bax (P > 0.05). Bcl-2:Bax was increased sixfold with antioxidant supplementation compared to non-supplemented animals (P < 0.05). Exercise training had no significant effect on Bcl-2, Bax or Bcl-2:Bax either alone or combined with antioxidant supplementation (P > 0.05) compared to non-supplemented animals. However, Bax was significantly lower (P < 0.05) in the supplemented trained group compared to non-supplemented trained animals. Cultured bovine endothelial cells incubated for 24 h with vitamin E and/or a-lipoic acid showed the combination of the two antioxidants increased Bcl-2 to a greater extent than cells incubated with the vehicle alone. In summary, vitamin E and a-lipoic acid increase endothelial cell Bcl-2, which may provide increased protection against apoptosis. (c) 2005 Elsevier Ltd. All rights reserved

Relevância:

20.00% 20.00%

Publicador:

Resumo:

While the physiological adaptations that occur following endurance training in previously sedentary and recreationally active individuals are relatively well understood, the adaptations to training in already highly trained endurance athletes remain unclear. While significant improvements in endurance performance and corresponding physiological markers are evident following submaximal endurance training in sedentary and recreationally active groups, an additional increase in submaximal training (i.e. volume) in highly trained individuals does not appear to further enhance either endurance performance or associated physiological variables [e.g. peak oxygen uptake (V-dot O2peak), oxidative enzyme activity]. It seems that, for athletes who are already trained, improvements in endurance performance can be achieved only through high-intensity interval training (HIT). The limited research which has examined changes in muscle enzyme activity in highly trained athletes, following HIT, has revealed no change in oxidative or glycolytic enzyme activity, despite significant improvements in endurance performance (p < 0.05). Instead, an increase in skeletal muscle buffering capacity may be one mechanism responsible for an improvement in endurance performance. Changes in plasma volume, stroke volume, as well as muscle cation pumps, myoglobin, capillary density and fibre type characteristics have yet to be investigated in response to HIT with the highly trained athlete. Information relating to HIT programme optimisation in endurance athletes is also very sparse. Preliminary work using the velocity at which V-dot O2max is achieved (Vmax) as the interval intensity, and fractions (50 to 75%) of the time to exhaustion at Vmax (Tmax) as the interval duration has been successful in eliciting improvements in performance in long-distance runners. However, Vmax and Tmax have not been used with cyclists. Instead, HIT programme optimisation research in cyclists has revealed that repeated supramaximal sprinting may be equally effective as more traditional HIT programmes for eliciting improvements in endurance performance. Further examination of the biochemical and physiological adaptations which accompany different HIT programmes, as well as investigation into the optimal HIT programme for eliciting performance enhancements in highly trained athletes is required.

Relevância:

20.00% 20.00%

Publicador: