931 resultados para key schedule


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Most one-round key exchange protocols provide only weak forward secrecy at best. Furthermore, one-round protocols with strong forward secrecy often break badly when faced with an adversary who can obtain ephemeral keys. We provide a characterisation of how strong forward secrecy can be achieved in one-round key exchange. Moreover, we show that protocols exist which provide strong forward secrecy and remain secure with weak forward secrecy even when the adversary is allowed to obtain ephemeral keys. We provide a compiler to achieve this for any existing secure protocol with weak forward secrecy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper focuses on information sharing with key suppliers and seeks to explore the factors that might influence its extent and depth. We also investigate how information sharing affects a company’s performance with regards to resource usage, output, and flexibility. Drawing from transaction cost- and contingency theories, several factors, namely environmental uncertainty, demand uncertainty, dependency and, the product life cycle stage are proposed to explain the level of information shared with key suppliers. We develop a model where information sharing mediates the (contingent) factors and company performance. A mail survey was used to collect data from Finnish and Swedish companies. Partial Least Squares analysis was separately performed for each country (n=119, n=102). There was consistent evidence that environmental uncertainty, demand uncertainty and supplier/buyer dependency had explanatory power, whereas no significance was found for the product life cycle stage. The results also confirm previous studies by providing support for a positive relationship between information sharing and performance, where output performance was found to be the most strongly related

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper focuses on information sharing with key suppliers and seeks to explore the factors that might influence its extent and depth. We also investigate how information sharing affects a company’s performance with regards to resource usage, output, and flexibility. Drawing from transaction cost- and contingency theories, several factors, namely environmental uncertainty, demand uncertainty, dependency and, the product life cycle stage are proposed to explain the level of information shared with key suppliers. We develop a model where information sharing mediates the (contingent) factors and company performance. A mail survey was used to collect data from Finnish and Swedish companies. Partial Least Squares analysis was separately performed for each country (n=119, n=102). There was consistent evidence that environmental uncertainty, demand uncertainty and supplier/buyer dependency had explanatory power, whereas no significance was found for the relationship between product life cycle stage and information sharing. The results also confirm previous studies by providing support for a positive relationship between information sharing and performance, where output performance was found to be the most strongly related.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Just Fast Keying (JFK) is a simple, efficient and secure key exchange protocol proposed by Aiello et al. (ACM TISSEC, 2004). JFK is well known for its novel design features, notably its resistance to denial-of-service (DoS) attacks. Using Meadows’ cost-based framework, we identify a new DoS vulnerability in JFK. The JFK protocol is claimed secure in the Canetti-Krawczyk model under the Decisional Diffie-Hellman (DDH) assumption. We show that security of the JFK protocol, when reusing ephemeral Diffie-Hellman keys, appears to require the Gap Diffie-Hellman (GDH) assumption in the random oracle model. We propose a new variant of JFK that avoids the identified DoS vulnerability and provides perfect forward secrecy even under the DDH assumption, achieving the full security promised by the JFK protocol.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper investigates the use of visual artifacts to represent a complex adaptive system (CAS). The integrated master schedule (IMS) is one of those visuals widely used in complex projects for scheduling, budgeting, and project management. In this paper, we discuss how the IMS outperforms the traditional timelines and acts as a ‘multi-level and poly-temporal boundary object’ that visually represents the CAS. We report the findings of a case study project on the way the IMS mapped interactions, interdependencies, constraints and fractal patterns in a complex project. Finally, we discuss how the IMS was utilised as a complex boundary object by eliciting commitment and development of shared mental models, and facilitating negotiation through the layers of multiple interpretations from stakeholders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Two-party key exchange (2PKE) protocols have been rigorously analyzed under various models considering different adversarial actions. However, the analysis of group key exchange (GKE) protocols has not been as extensive as that of 2PKE protocols. Particularly, an important security attribute called key compromise impersonation (KCI) resilience has been completely ignored for the case of GKE protocols. Informally, a protocol is said to provide KCI resilience if the compromise of the long-term secret key of a protocol participant A does not allow the adversary to impersonate an honest participant B to A. In this paper, we argue that KCI resilience for GKE protocols is at least as important as it is for 2PKE protocols. Our first contribution is revised definitions of security for GKE protocols considering KCI attacks by both outsider and insider adversaries. We also give a new proof of security for an existing two-round GKE protocol under the revised security definitions assuming random oracles. We then show how to achieve insider KCIR in a generic way using a known compiler in the literature. As one may expect, this additional security assurance comes at the cost of an extra round of communication. Finally, we show that a few existing protocols are not secure against outsider KCI attacks. The attacks on these protocols illustrate the necessity of considering KCI resilience for GKE protocols.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Key establishment is a crucial cryptographic primitive for building secure communication channels between two parties in a network. It has been studied extensively in theory and widely deployed in practice. In the research literature a typical protocol in the public-key setting aims for key secrecy and mutual authentication. However, there are many important practical scenarios where mutual authentication is undesirable, such as in anonymity networks like Tor, or is difficult to achieve due to insufficient public-key infrastructure at the user level, as is the case on the Internet today. In this work we are concerned with the scenario where two parties establish a private shared session key, but only one party authenticates to the other; in fact, the unauthenticated party may wish to have strong anonymity guarantees. We present a desirable set of security, authentication, and anonymity goals for this setting and develop a model which captures these properties. Our approach allows for clients to choose among different levels of authentication. We also describe an attack on a previous protocol of Øverlier and Syverson, and present a new, efficient key exchange protocol that provides one-way authentication and anonymity.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The lack of satisfactory consensus for characterizing the system intelligence and structured analytical decision models has inhibited the developers and practitioners to understand and configure optimum intelligent building systems in a fully informed manner. So far, little research has been conducted in this aspect. This research is designed to identify the key intelligent indicators, and develop analytical models for computing the system intelligence score of smart building system in the intelligent building. The integrated building management system (IBMS) was used as an illustrative example to present a framework. The models presented in this study applied the system intelligence theory, and the conceptual analytical framework. A total of 16 key intelligent indicators were first identified from a general survey. Then, two multi-criteria decision making (MCDM) approaches, the analytic hierarchy process (AHP) and analytic network process (ANP), were employed to develop the system intelligence analytical models. Top intelligence indicators of IBMS include: self-diagnostic of operation deviations; adaptive limiting control algorithm; and, year-round time schedule performance. The developed conceptual framework was then transformed to the practical model. The effectiveness of the practical model was evaluated by means of expert validation. The main contribution of this research is to promote understanding of the intelligent indicators, and to set the foundation for a systemic framework that provide developers and building stakeholders a consolidated inclusive tool for the system intelligence evaluation of the proposed components design configurations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In maintaining quality of life, preventative health is an important area in which the performance of pro-social behaviours provides benefits to individuals who perform them as well as society. The establishment of the Preventative Health Taskforce in Australia demonstrates the significance of preventative health and aims to provide governments and health providers with evidence-based advice on preventative health issues (Preventative Health Taskforce, 2009). As preventative health behaviours are voluntary, for consumers to sustain this behaviour there needs to be a value proposition (Dann, 2008; Kotler and Lee, 2008). Customer value has been shown to influence repeat behaviour (McDougall and Levesque, 2000), word-of-mouth (Hartline and Jones, 1999), and attitudes (Dick and Basu, 2008). However to date there is little research that investigates the source of value for preventative health services. This qualitative study explores and identifies three categories of sources that influence four dimensions of value – functional, emotional, social and altruistic (Holbrook 2006). A conceptual model containing five propositions outlining these relationships is presented. This study provides evidence-based research that reveals sources of value that influence individuals’ decisions to perform pro-social behaviours in the long-term through their use of preventative health services. This research uses BreastScreen Queensland (BSQ), a cancer screening service, as the service context.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose---The aim of this study is to identify complexity measures for building projects in the People’s Republic of China (PRC). Design/Methodology/Approach---A three-round of Delphi questionnaire survey was conducted to identify the key parameters that measure the degree of project complexity. A complexity index (CI) was developed based on the identified measures and their relative importance. Findings---Six key measures of project complexity have been identified, which include, namely (1) building structure & function; (2) construction method; (3) the urgency of the project schedule; (4) project size/scale; (5) geological condition; and (6) neighboring environment. Practical implications---These complexity measures help stakeholders assess degrees of project complexity and better manage the potential risks that might be induced to different levels of project complexity. Originality/Value---The findings provide insightful perspectives to define and understand project complexity. For stakeholders, understanding and addressing the complexity help to improve project planning and implementation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose-- DB clients play a vital role in the delivery of DB system and the clients’ competences are critical to the success of DB projects. Most of DB clients, however, remain inexperienced with the DB system. This study, therefore, aims to identify the key competences that DB clients should possess to ensure the success of DB projects in the construction market of China. Design/Methodology/Approach -- Five semi-structured face-to-face interviews and two rounds Delphi questionnaire survey were conducted in the construction market of China to identify the key competences of DB clients. Rankings have been assigned to these key competences on the basis of their relative importance. Findings-- Six ranked key competences of DB clients have been identified, which are, namely, (1) the ability to clearly define project scope and objectives; (2) financial capacity for the projects; (3) capacity in contract management; (4) adequate staff or consulting team; (5) effective coordination with DB contractors and (6) experience with similar design-build projects. Calculation of Kendall’s Coefficient of Concordance (W) indicates a statistically significant consensus of panel experts on these top six key competences. Practical implications—Clients should clearly understand the competence requirements in DB projects and should assess their DB capability before going for the DB option. Originality/Value-- The examination of DB client’s key competences will help the client deepen the understanding of the DB system. DB clients can also make use of the research findings as guidelines to improve their DB competence.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-builders play a vital role in the success of DB projects. In the construction market of the People’s Republic of China, most of the design-builders, however, lack adequate competences to conduct the DB projects successfully. The objective of this study is, therefore, to identify the key competences that design-builders should possess to not only ensure the success of DB projects but also acquire the competitive advantages in the DB market. Five semi-structured face-to-face interviews and two rounds of Delphi questionnaire survey were conducted to identify the key competences of design-builders. Rankings have been assigned to these key competences on the basis of their relative importance. Six ranked key competences of design-builders have been identified, which are, namely, (1) experience with similar DB projects; (2) capability of corporate management; (3) combination of building techniques and design expertise; (4) financial capability for DB projects; (5) enterprise qualification and scale; and (6) credit records and reputation in the industry. The design-builders can make use of the research findings as guidelines to improve their DB competence. These research findings will also be useful to clients during the selection of design-builders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The design-build system has been demonstrated as an effective delivery method and gained popularity worldwide. Although there are an increasing number of clients adopting DB method in China, most of them remain inexperienced with method. The objective of this study is therefore to identify the key competences that a client or its consultant should possess to ensure the success of DB projects. Face-to-face interviews and a two-round Delphi questionnaire survey were conducted to find the following six key competences of clients, which include the (1) ability to clearly articulate project scope and objectives; (2) financial capacity for DB projects; (3) capability in contract management; (4) adequate staff or consulting team; (5) effective coordination with contractors and (6) experience with similar DB projects. This study will hopefully provide clients with measures to evaluate their DB competence and further promote their understanding of DB system in the PRC.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A hospital consists of a number of wards, units and departments that provide a variety of medical services and interact on a day-to-day basis. Nearly every department within a hospital schedules patients for the operating theatre (OT) and most wards receive patients from the OT following post-operative recovery. Because of the interrelationships between units, disruptions and cancellations within the OT can have a flow-on effect to the rest of the hospital. This often results in dissatisfied patients, nurses and doctors, escalating waiting lists, inefficient resource usage and undesirable waiting times. The objective of this study is to use Operational Research methodologies to enhance the performance of the operating theatre by improving elective patient planning using robust scheduling and improving the overall responsiveness to emergency patients by solving the disruption management and rescheduling problem. OT scheduling considers two types of patients: elective and emergency. Elective patients are selected from a waiting list and scheduled in advance based on resource availability and a set of objectives. This type of scheduling is referred to as ‘offline scheduling’. Disruptions to this schedule can occur for various reasons including variations in length of treatment, equipment restrictions or breakdown, unforeseen delays and the arrival of emergency patients, which may compete for resources. Emergency patients consist of acute patients requiring surgical intervention or in-patients whose conditions have deteriorated. These may or may not be urgent and are triaged accordingly. Most hospitals reserve theatres for emergency cases, but when these or other resources are unavailable, disruptions to the elective schedule result, such as delays in surgery start time, elective surgery cancellations or transfers to another institution. Scheduling of emergency patients and the handling of schedule disruptions is an ‘online’ process typically handled by OT staff. This means that decisions are made ‘on the spot’ in a ‘real-time’ environment. There are three key stages to this study: (1) Analyse the performance of the operating theatre department using simulation. Simulation is used as a decision support tool and involves changing system parameters and elective scheduling policies and observing the effect on the system’s performance measures; (2) Improve viability of elective schedules making offline schedules more robust to differences between expected treatment times and actual treatment times, using robust scheduling techniques. This will improve the access to care and the responsiveness to emergency patients; (3) Address the disruption management and rescheduling problem (which incorporates emergency arrivals) using innovative robust reactive scheduling techniques. The robust schedule will form the baseline schedule for the online robust reactive scheduling model.