959 resultados para estimate


Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The residence time has long been used as a classification parameter for estuaries and other semi- enclosed water bodies. It aims to quantify the time water remains inside the estuary, being used as an indicator both for pollution assessment and for ecological processes. Estuaries with a short residence time will export nutrients from upstream sources more rapidly then estuaries with longer residence time. On the other hand the residence time determines if micro-algae can stay long enough to generate a bloom. As a consequence, estuaries with very short residence time are expected to have much lower algae blooms, then estuaries with longer residence time. In addition, estuaries with residence times shorter than the doubling time of algae cells will inhibit formation of algae blooms (EPA, 2001). The residence time is also an important issue for processes taking place in the sediment. The fluxes of particulate matter and associated adsorbed species from the water column to the sediment depends of the particle’s vertical velocity, water depth and residence time. This is particularly important for the fine fractions with lower sinking velocities. The question is how to compute the residence time and how does it depend on the computation method adopted.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Throughout recent years, there has been an increase in the population size, as well as a fast economic growth, which has led to an increase of the energy demand that comes mainly from fossil fuels. In order to reduce the ecological footprint, governments have implemented sustainable measures and it is expected that by 2035 the energy produced from renewable energy sources, such as wind and solar would be responsible for one-third of the energy produced globally. However, since the energy produced from renewable sources is governed by the availability of the respective primary energy source there is often a mismatch between production and demand, which could be solved by adding flexibility on the demand side through demand response (DR). DR programs influence the end-user electricity usage by changing its cost along the time. Under this scenario the user needs to estimate the energy demand and on-site production in advance to plan its energy demand according to the energy price. This work focuses on the development of an agent-based electrical simulator, capable of: (a) estimating the energy demand and on-site generation with a 1-min time resolution for a 24-h period, (b) calculating the energy price for a given scenario, (c) making suggestions on how to maximize the usage of renewable energy produced on-site and to lower the electricity costs by rescheduling the use of certain appliances. The results show that this simulator allows reducing the energy bill by 11% and almost doubling the use of renewable energy produced on-site.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Original estimate of Mr. Danforth on the Port Dalhousie and Thorold Railway (1 page, handwritten), Nov. 3, 1853.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Approximate cost of completing the railway from Port Dalhousie to St. Catharines and an estimate of the cost of the piers at Port Dalhousie signed by William Hamilton Merritt (5 pages, handwritten), July 8, 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Approximate estimate of the cost of completing the Port Dalhousie Railway to the Grand Central Railway Station at Lock 12. This document is badly torn and burned but most of the text is legible, July 14, 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Port Dalhousie and Thorold Railway estimate of work done to date with an approximation of probable damage sustained by suspending the track, Aug. 22, 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month ending Aug. 31, 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month of August, 1854, signed by S.D. Woodruff, Sept. 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month ending Sept. 30, 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month of Sept. 1854, signed by S.D. Woodruff, Oct. 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month ending Oct. 31, 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month of Oct. 1854, signed by S.D. Woodruff, Nov. 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Approximate estimate of the cost of constructing and completing the Port Dalhousie and Thorold Railway to St. Catharines signed by S.D. Woodruff (2 pages, handwritten), Jan. 8, 1855.