173 resultados para deadline


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Pós-graduação em Biometria - IBB

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The current issue of the Bulletin is based on a document prepared by the ECLAC Transport Unit, Natural Resources and Infrastructure Division, on maritime and port security in South America: implementation of measures, general status as of mid-2004 (in Spanish only). This is a joint activity of the Technical Coordination Committee of the presidential initiative for Regional Infrastructure Integration in South America (IIRSA) and ECLAC. This document served as an input for a meeting on this subject held by representatives of the authorities of South American countries in Montevideo, Uruguay, on 22 June 2004. In this issue the results are presented of two recent surveys conducted by the users, operators and governmental authorities of the region on the new maritime and port security measures of the International Maritime Organization (IMO). An effort was made, on the one hand, to ascertain the existing level of awareness of the measures and the perceptions of impact, the potential costs and responsibility for the cost of the measures, and on the other hand to ascertain the degree of progress in their implementation, for which the deadline was 1 July 2004.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Nicaragua is making progress towards the Millennium Development Goals, but is set to miss a number of targets in 2015. This paper’s general equilibrium analysis shows that it is unfeasible for the government to step up spending in order to meet these targets by the 2015 deadline. Any boost to public spending and financing would have to be front-loaded, which would entail pernicious macroeconomic trade-offs. A more realistic scenario would be to postpone meeting the goals until 2020. In that case, the allocation of public spending would spur economic growth without causing macroeconomic hardships, although the country would nevertheless remain highly vulnerable to external shocks.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Nos últimos anos, a Universidade Federal do Pará (UFPA), entre outras providências importantes, tem investido significativamente na reestruturação e expansão de seus campi, com a construção de novos prédios, ampliação e reforma dos já existentes. Como na maioria das IFES, porém, na UFPA não existe estrutura e tempo suficientes para que a equipe técnica responsável possa gerenciar e executar os projetos executivos, acompanhar e fiscalizar as obras de construção e manutenção. O objetivo deste trabalho é fazer uma análise gerencial dos processos construtivos da UFPA, tomando por base a obra do Complexo de prédios do Instituto de Educação Matemática e Científica (IEMCI) da UFPA, visando à identificação e minimização dos problemas que se apresentaram ao longo de seu fluxo. Para tal, procedeu-se um estudo de caso nos processos administrativos e demais documentos inerentes à construção dos diversos módulos que compõem o Instituto, com o levantamento de dados de todas as obras executadas, e realização de entrevistas, baseadas no modelo de Campos (2011), a todos os envolvidos no processo. Após a análise dos resultados, constatou-se que a falta de planejamento e gerenciamento efetivo dos processos de projeto construtivos produziram vários problemas, entre os quais, projetos incompletos e falhos, levando à construção fragmentada. A obra, executada em várias etapas, custou 35,19% mais, do que se fosse realizada em uma só etapa, integralmente. Quanto ao prazo, esse acréscimo foi maior ainda, chegando a 283%. Concluindo-se que os intervenientes causados pela fragmentação, influenciaram seriamente no prazo e no valor final da obra.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Are being released in the construction market in Brazil ventures called Super 6. These businesses sell the promise of delivery of the apartment in six months after the launch of the venture. To meet this deadline are being deployed the constructive method of concrete walls using aluminum shapes. This system basically consists of pouring slabs and walls once, i.e. building up the wall shapes and slab joints. On the walls are used cloth, with reinforcements in vain and corners of walls and on these screens are tied the electrical boxes and conduits. For each tower is used the so-called system of half way, i.e. the system so it is sufficient to mount the Middle deck. Using a concrete which can be deformed in the next day you can lift one deck every two days with ready electric and hydraulicsystem, without having to tow the wall doing only minor fixes in the imperfections after concrete. With this system won an incredible speed in the construction of the structure reducing in almost one-third the length of the work. This work aims to compare in terms of cost-benefit of masonry structural systems and this new concrete wall system called Super 6. For this comparison will be used as parameter values used for the achievement of the Enterprise Portal of Roses of constructor Tenda which is one of the first to use concrete wall system. This project basically consists of seven towers of six floors each and will be budgeted the cost of this project if it were held in structural masonry. From these data it will be possible to make a comparison about the actual beneficial to adopt this system

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Pós-graduação em Direito - FCHS

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Due to the considerations on the Legal Forest Reserve, the aim of this paper is to show the distribution of the farming areas in the region and their application – especially natural forests. Also, to compare the municipal values with those stated in the Brazilian Forest Code in order to analyze the process of implementing 20% of forest area in relation to the total farming area, at municipal and regional levels, not considering the areas of each of the farms nor the watershed to which they belong with the Brazilian Forestry Code. The work results show that all municipalities in the region of Botucatu do not have forest areas equal or greater than 20% of total area. Therefore, a non-exploratory reforestation procedure will have to be implemented to follow legal requirements. Finally, the results show that the city of Areiópolis will face the greatest difficulties in implementing the 20% of forests with regard to the Legal Forest Reserve, until 2021, when the deadline stated by the Legal Code expires. According to the same variables, the municipalities of Anhembi, Conchas, Laranjal Paulista, Pereiras, Pratânia and São Manuel will face medium-level difficulties, whereas Bofete, Botucatu, Itatinga and Pardinho will implement it the easiest way.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The initial sign-up period for 2009 farm commodity programs and the choice between the new ACRE (Average Crop Revenue Election) program and the existing DCP (Direct and Counter-Cyclical Payment) program is quickly winding down. But as the current August 14 deadline approaches, producers know more and more about the potential safety net provided under the ACRE program, and have a better opportunity to analyze the economics of choosing ACRE versus the DCP program before visiting their USDA Farm Service Agency (FSA) office.