900 resultados para cost of stock


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The desire to create a statistical or mathematical model, which would allow predicting the future changes in stock prices, was born many years ago. Economists and mathematicians are trying to solve this task by applying statistical analysis and physical laws, but there are still no satisfactory results. The main reason for this is that a stock exchange is a non-stationary, unstable and complex system, which is influenced by many factors. In this thesis the New York Stock Exchange was considered as the system to be explored. A topological analysis, basic statistical tools and singular value decomposition were conducted for understanding the behavior of the market. Two methods for normalization of initial daily closure prices by Dow Jones and S&P500 were introduced and applied for further analysis. As a result, some unexpected features were identified, such as a shape of distribution of correlation matrix, a bulk of which is shifted to the right hand side with respect to zero. Also non-ergodicity of NYSE was confirmed graphically. It was shown, that singular vectors differ from each other by a constant factor. There are for certain results no clear conclusions from this work, but it creates a good basis for the further analysis of market topology.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main aim of this research was to develop cost of poor quality calculation model which will better reflect business impacts of lost productivity caused by IT incidents for the case company. This objective was pursued by reviewing literature and conducting a study in a Finnish multinational manufacturing company. Broad analysis of the scientific literature allowed to identify main theories and models of Cost of Poor Quality and provided better base for development of measurements of business impacts of lost productivity. Empirical data was gathered with semi-structured interviews and internet based survey. In total, twelve interviews with experts and 39 survey results from business stakeholders were gathered. Main results of empirical study helped to develop the measurement model of cost of poor quality and it was tied to incident priority matrix. Nevertheless, the model was created based on available data. Main conclusions of the thesis were that cost of poor quality measurements could be even further improved if additional data points could be used. New model takes into consideration different cost regions and utilizes on this notion.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Electrical Development Company of Ontario was created in 1903. It was one of three private power companies that had water power leases with the Niagara Parks Commission, but was the only one that was financed with Canadian capital. The company built the Toronto Power Generating Station at Niagara Falls beginning in 1906, and the power house was completed in 1913. During the construction, there was much debate about whether the utility should remain privately operated or become a public utility. In 1920, the company became part of the public utility.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Handwritten sheet of paper detailing the cost of transporting boxes containing the Gravatt’s level from London to St. Catharines, April 1847.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Handwritten sheet of paper detailing the cost of transporting boxes containing the Gravatt’s level from London to St. Catharines. This sheet is signed by S.D. Woodruff, Jan. 11, 1847.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Approximate cost of completing the railway from Port Dalhousie to St. Catharines and an estimate of the cost of the piers at Port Dalhousie signed by William Hamilton Merritt (5 pages, handwritten), July 8, 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Approximate estimate of the cost of completing the Port Dalhousie Railway to the Grand Central Railway Station at Lock 12. This document is badly torn and burned but most of the text is legible, July 14, 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Estimated cost of the Port Dalhousie and Thorold Railway sent to George Rykert by S.D. Woodruff, Aug. 5, 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Approximate estimate of the cost of constructing and completing the Port Dalhousie and Thorold Railway to St. Catharines signed by S.D. Woodruff (2 pages, handwritten), Jan. 8, 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cost of the railway from Port Dalhousie to St. Catharines (1 page, handwritten), Jan. 11, 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Approximate estimate of the cost of extending the Port Dalhousie and Thorold Railway from Geneva Street to the Great Western Railway Station at Lock no. 12 (2 copies) [one appears to be a rough copy] (2 pages, handwritten), Feb. 2, 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Letter of estimate sent to S.D. Woodruff for the total cost of construction and equipment of the extension of the line to Port Colborne [this is unsigned]. There is an envelope with this letter that suggests that it is from Mr. Shanly, Mar. 12, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chart of estimate of cost of Port Dalhousie and Thorold Railway extension Line no. 1 signed by Mr. Shanly, Mar. 12, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chart of the estimated cost of Line no. 1, n.d.