This was a two-stage project to inform the Australian property and construction industry generally, and to provide the Australian Building Codes Board (ABCB) with information to allow it to determine whether or not sustainability requirements are necessary in the Future Building Code of Australia (BCA21). Research objectives included: examine overseas sustainability requirements for buildings and outline the reason why it is controlled and regulated in the particular country, state, principality etc. examine studies focusing on sustainability developments in buildings in Australia and overseas identify potential issues and implications associated with sustainable building requirements provide advice on whether provisions are necessary in the BCA21 to make buildings sustainable if the study determines there is a need for sustainability requirements in the BCA21, the study was to demonstrate the need to control and regulate along with the method to control and regulate. This research was broken down into two stages. Stage 1 was a literature review of international requirements as well as current thinking and practice for sustainable building developments. Stage 2 identified issues and implications of sustainability requirements for buildings and advice on whether provisions are necessary in the BCA21. This stage included workshops in all capital cities and involved key stakeholders, such as regulators, local government and representatives from key associations. This final report brings together the work of both stages, along with a searchable internet database of references and a series of nine key recommendations.
Resumo:
Measuring social and environmental metrics of property is necessary for meaningful triple bottom line (TBL) assessments. This paper demonstrates how relevant indicators derived from environmental rating systems provide for reasonably straightforward collations of performance scores that support adjustments based on a sliding scale. It also highlights the absence of a corresponding consensus of important social metrics representing the third leg of the TBL tripod. Assessing TBL may be unavoidably imprecise, but if valuers and managers continue to ignore TBL concerns, their assessments may soon be less relevant given the emerging institutional milieu informing and reflecting business practices and society expectations.
Resumo:
A study has been conducted to investigate current practices on decision-making under risk and uncertainty for infrastructure project investments. It was found that many European countries such as the UK, France, Germany including Australia use scenarios for the investigation of the effects of risk and uncertainty of project investments. Different alternative scenarios are mostly considered during the engineering economic cost-benefit analysis stage. For instance, the World Bank requires an analysis of risks in all project appraisals. Risk in economic evaluation needs to be addressed by calculating sensitivity of the rate of return for a number of events. Risks and uncertainties of project developments arise from various sources of errors including data, model and forecasting errors. It was found that the most influential factors affecting risk and uncertainty resulted from forecasting errors. Data errors and model errors have trivial effects. It was argued by many analysts that scenarios do not forecast what will happen but scenarios indicate only what can happen from given alternatives. It was suggested that the probability distributions of end-products of the project appraisal, such as cost-benefit ratios that take forecasting errors into account, are feasible decision tools for economic evaluation. Political, social, environmental as well as economic and other related risk issues have been addressed and included in decision-making frameworks, such as in a multi-criteria decisionmaking framework. But no suggestion has been made on how to incorporate risk into the investment decision-making process.
Resumo:
This paper presents a comparative study of primarily Australian (and limited international) practices and guidelines on Buildings Asset Management (BAM). The objective of this study was to identify potential gaps in current practices and potential areas of research for further improvement. The paper starts with an overview of BAM. Later sections cover current BAM practices and guidelines across different states of Australia; give a limited overview of international practices and concludes with the authors’ observations.
Resumo:
This publication, summarising outcomes of an investigation into eTendering as a part of a CRC Construction Innovation research project, presents guidelines and recommendations to be considered when implementing eTendering systems, procedures and policies.
Resumo:
The innovation diffusion and knowledge management literature strongly supports the importance of communities of practice (COP) for enabling knowledge about how to use and adopt innovation initiatives. One of the most powerful tools for innovation diffusion is word-of-mouth wisdom from committed individuals who mentor and support each other. Close proximity for face-to-face interaction is highly effective, however, many organisations are geographically dispersed with projects being virtual linked sub-organisations using ICT to communicate. ICT has also introduced a useful facilitating technology for developing knowledge networks. This paper presents findings from a research program concentrating on ICT innovation diffusion in the Australian construction industry. One way in which ICT diffusion is taking place was found to be through within-company communities of practice. We undertook in-depth unstructured interviews with three of the major 10 to 15 contractors in Australia to discuss their ICT diffusion strategies. We discovered that in all three cases,within company networked communities of practice was a central strategy. Further, effective diffusion of ICT groupware tools can be critical in developing COP where they are geographically dispersed.
Resumo:
This paper examines knowledge management and innovation in the Australian Construction Industry. A conceptual model is presented, based upon analysis of the literature and a series of preliminary construction industry interviews. Extensive knowledge management (KM) research has focused upon types of knowledge contained within specific organizational settings. However, we argue that a crucial missing link in KM research concerns the interface between flows of knowledge from external sources of innovations and its channelization in and out, and between organizations. This interface, regulating and facilitating knowledge from external sources of innovation into the organisation, operates under the influence of two main forces visualized as “pulling” and “pushing” forces in the model presented in this paper. The premise of the model lies in a hypothesis that as an organization changes itself into a more mature, learning organization (LO) over time, knowledge flows into it through “pull” rather than “push” forces. We conclude that a successful knowledge management initiative installs a learning and knowledge sharing culture, which is easily adaptable to new learning offering little resistance to new knowledge that flows into the organisation. The model bridges the gap between research and its application in construction practice.
Resumo:
Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.
Resumo:
The Cooperative Research Centre for Construction Innovation1 (hereafter called Construction Innovation) supports the notion of the establishment of a Sustainability Charter for Australia and is interested in working collaboratively to achieve this outcome. A number of challenges need to be addressed to develop this Charter. This submission outlines these challenges and possible responses to them by a Sustainability Commission.
Resumo:
Off-site manufacture (OSM) offers numerous benefits to all parties in the construction process. The uptake of OSM in Australia has, however, been limited. This limited uptake corresponds to similar trends in the UK and US, although the level of OSM there appears to be increasing. This project undertook three workshops — one each in Victoria, Queensland and Western Australia — and 18 interviews with key stakeholders to assist in identifying the general benefits and barriers to OSM uptake in the Australian construction industry. Seven case studies were also undertaken, involving construction projects that used OSM, ranging from civil projects through to residential. Each of these case studies has been analysed to identify what worked and what didn’t, and suggest the lessons to be learned from each project.
Resumo:
Much has been written on Off-site Manufacture (OSM) in construction, particularly regarding the perceived benefits and barriers to implementation. However, very little understanding of the state of OSM in the Australian construction industry exists. A ‘scoping study' has recently been undertaken to determine the ‘state-of-the-art’ of OSM in Australia. This involved several industry workshops, interviews and case studies across four major states of Australia. The study surveyed a range of suppliers across the construction supply-chain, incorporating the civil, commercial and housing segments of the market. This revealed that skills shortages and lack of adequate OSM knowledge are generally the greatest issues facing OSM in Australia. The drivers and constraints that emerged from the research were, in large measure, consistent with those found in the US and UK, although some Australian anomalies are evident, such as the geographical disparity of markets. A comparative analysis with similar studies in the UK and US is reported, illustrating both the drivers and constraints confronting the industry in Australia. OSM uptake into the future is however dependent on many factors, not least of which is a better understanding of the construction process and its associated costs.
Resumo:
The challenges of maintaining a building such as the Sydney Opera House are immense and are dependent upon a vast array of information. The value of information can be enhanced by its currency, accessibility and the ability to correlate data sets (integration of information sources). A building information model correlated to various information sources related to the facility is used as definition for a digital facility model. Such a digital facility model would give transparent and an integrated access to an array of datasets and obviously would support Facility Management processes. In order to construct such a digital facility model, two state-of-the-art Information and Communication technologies are considered: an internationally standardized building information model called the Industry Foundation Classes (IFC) and a variety of advanced communication and integration technologies often referred to as the Semantic Web such as the Resource Description Framework (RDF) and the Web Ontology Language (OWL). This paper reports on some technical aspects for developing a digital facility model focusing on Sydney Opera House. The proposed digital facility model enables IFC data to participate in an ontology driven, service-oriented software environment. A proof-of-concept prototype has been developed demonstrating the usability of IFC information to collaborate with Sydney Opera House’s specific data sources using semantic web ontologies.
Resumo:
Purpose: Choosing the appropriate procurement system for construction projects is a complex and challenging task for clients particularly when professional advice has not been sought. To assist with the decision making process, a range of procurement selection tools and techniques have been developed by both academic and industry bodies. Public sector clients in Western Australia (WA) remain uncertain about the pairing of procurement method to bespoke construction project and how this decision will ultimately impact upon project success. This paper examines ‘how and why’ a public sector agency selected particular procurement methods. · Methodology/Approach: An analysis of two focus group workshops (with 18 senior project and policy managers involved with procurement selection) is reported upon · Findings: The traditional lump sum (TLS) method is still the preferred procurement path even though alternative forms such as design and construct, public-private-partnerships could optimize the project outcome. Paradoxically, workshop participants agreed that alternative procurement forms should be considered, but an embedded culture of uncertainty avoidance invariably meant that TLS methods were selected. Senior managers felt that only a limited number of contractors have the resources and experience to deliver projects using the nontraditional methods considered. · Research limitations/implications: The research identifies a need to develop a framework that public sector clients can use to select an appropriate procurement method. A procurement framework should be able to guide the decision-maker rather than provide a prescriptive solution. Learning from previous experiences with regard to procurement selection will further provide public sector clients with knowledge about how to best deliver their projects.
Resumo:
This paper uses the case study of a hybrid public-private strategic alliance as data to complement and contrast with the traditional views on knowledge transfer and learning between alliance partners. In particular, the paper explores whether the concept of competitive collaboration conceptualized by Hamel (1991) in his seminal work holds true for all forms of strategic alliances. Conceptualizing the knowledge boundaries of organisations in alliances as a ‘collaborative membrane’, we focus attention on the permeability of these boundaries rather than the actual location of the boundaries. In this vein, we present a case study of a major public sector organization that illustrates how these principles have allowed it to start rebuilding its internal capabilities adopting a more collaborative stance and ensuring their knowledge boundaries are highly porous as they move more major projects into hybrid public private alliance contracts.