1000 resultados para U.S. Atomic Energy Commission. Technical Information Center.
Resumo:
AEC Report No. TID-375.
Resumo:
"TID-5290."
Resumo:
A total of 193 annotated references to unclassified reports on the design, development and construction of the Shippingport Pressurized Water Reactor is presented. Author, subject, and report number indexes are included.
Resumo:
K-25 Laboratories, Carbide and Carbon Chemicals Corporation; Formerly of Clinton Engineer Works--Tennessee Eastman Corporation.
Resumo:
Cover title.
Resumo:
"Contract No. W-7405-eng-92."
Resumo:
"March 1, 1952."
Resumo:
"TID-3076."
Resumo:
Xerox copy.
Resumo:
"Work performed under Contract no. AT-(30-1)-534."
Resumo:
Includes bibliographical references (p. 15)
Resumo:
Cover title.
Resumo:
"Conf-651131, General, miscellaneous, and progress reports (TID-4500)."
Resumo:
Mode of access: Internet.
Resumo:
TID-3717 cover misprinted as Feb./Mar 1963, should be Apr./May 1963.