896 resultados para Supply and demand


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Over the last two decades, Jordan has suffered a chronic water crisis, and is the tenth most water-scarce nation on Earth. Such water stress has been well illustrated in the case of Greater Amman, the capital, which has grown dramatically from a population of around 2000 in the 1920s, to 2.17 million today. One of the distinctive characteristics of the water supply regime of Greater Amman is that since 1987 it has been based on a system of rationing, with households receiving water once a week for various durations. Amman is highly polarized socio-economically, and by means of household surveys, both quantitative and qualitative, conducted in high- and low-income divisions of the city, a detailed empirical evaluation of the storage and use of water, the strategies used by households to manage water and overall satisfaction with water supply issues is provided in this paper, looking specifically at issues of social equity. The analysis demonstrates the social and economic costs of water rationing and consequent management to be high, as well as emphasizing that issues of water quality are of central importance to all consumers regardless of their socio-economic status within the city.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Reproductive parameters of Mallard Anas platyrhynchos were investigated in relation to vegetative development, physical characteristics and invertebrate food abundance of a complex of flooded gravel quarries in southern Britain. Breeding pair density over the study area was particularly high with 2.2 pairs km(-1) of shoreline. Across all lakes breeding success was limited to an average of 0.9 ducklings fledged pair(-1), yet an associated study showed that very little of the mortality could be attributed to predation. The results of stepwise multiple regressions indicated that the availability of emerging insects was important in determining the breeding density and breeding success of Mallards rather than habitat structure. We suggest that the overall great availability of suitable nest-sites combined with the variable but unmeasured stocking densities of fish may explain the lack of the latter correlations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The River Lugg has particular problems with high sediment loads that have resulted in detrimental impacts on ecology and fisheries. A new dynamic, process-based model of hydrology and sediments (INCA- SED) has been developed and applied to the River Lugg system using an extensive data set from 1995–2008. The model simulates sediment sources and sinks throughout the catchment and gives a good representation of the sediment response at 22 reaches along the River Lugg. A key question considered in using the model is the management of sediment sources so that concentrations and bed loads can be reduced in the river system. Altogether, five sediment management scenarios were selected for testing on the River Lugg, including land use change, contour tillage, hedging and buffer strips. Running the model with parameters altered to simulate these five scenarios produced some interesting results. All scenarios achieved some reduction in sediment levels, with the 40% land use change achieving the best result with a 19% reduction. The other scenarios also achieved significant reductions of between 7% and 9%. Buffer strips produce the best result at close to 9%. The results suggest that if hedge introduction, contour tillage and buffer strips were all applied, sediment reductions would total 24%, considerably improving the current sediment situation. We present a novel cost-effectiveness analysis of our results where we use percentage of land removed from production as our cost function. Given the minimal loss of land associated with contour tillage, hedges and buffer strips, we suggest that these management practices are the most cost-effective combination to reduce sediment loads.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The National Housing and Planning Advice Unit commissioned Professor Michael Ball of Reading University to undertake empirical research into how long it was taking to obtain planning consent for major housing sites in England. The focus on sites as opposed to planning applications is important because it is sites that generate housing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Public water supplies in England and Wales are provided by around 25 private-sector companies, regulated by an economic regulator (Ofwat) and and environmental regulator (Environment Agency). As part of the regulatory process, companies are required periodically to review their investment needs to maintain safe and secure supplies, and this involves an assessment of the future balance between water supply and demand. The water industry and regulators have developed an agreed set of procedures for this assessment. Climate change has been incorporated into these procedures since the late 1990s, although has been included increasingly seriously over time and it has been an effective legal requirement to consider climate change since the 2003 Water Act. In the most recent assessment in 2009, companies were required explicitly to plan for a defined amount of climate change, taking into account climate change uncertainty. A “medium” climate change scenario was defined, together with “wet” and “dry” extremes, based on scenarios developed from a number of climate models. The water industry and its regulators are now gearing up to exploit the new UKCP09 probabilistic climate change projections – but these pose significant practical and conceptual challenges. This paper outlines how the procedures for incorporating climate change information into water resources planning have evolved, and explores the issues currently facing the industry in adapting to climate change.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is growing international interest in the impact of regulatory controls on the supply of housing The UK has a particularly restrictive planning regime and a detailed and uncertain process of development control linked to it. This paper presents the findings of empirical research on the time taken to gain planning permission for selected recent major housing projects from a sample of local authorities in southern England. The scale of delay found was far greater than is indicated by average official data measuring the extent to which local authorities meet planning delay targets. If these results are representative of the country as a whole, they indicate that planning delay could be a major cause of the slow responsiveness of British housing supply.