461 resultados para Ramp metering


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Numerical simulations of thermomagnetic convection of paramagnetic fluids placed in a micro-gravity condition (g nearly 0) and under a uniform vertical gradient magnetic field in an open ended square enclosure with ramp heating temperature condition applied on a vertical wall is investigated in this study. In presence of the strong magnetic gradient field thermal convection of the paramagnetic fluid might take place even in a zero-gravity environment as a direct consequence of temperature differences occurring within the fluid. The thermal boundary layer develops adjacent to the hot wall as soon as the ramp temperature condition is applied on it. There are two scenario that can be observed based on the ramp heating time. The steady state of the thermal boundary layer can be reached before the ramp time is finished or vice versa. If the ramp time is larger than the quasi-steady time then the thermal boundary layer is in a quasi-steady mode with convection balancing conduction after the quasi-steady time. Further increase of the heat input simply accelerates the flow to maintain the proper thermal balance. Finally, the boundary layer becomes completely steady state when the ramp time is finished. Effects of magnetic Rayleigh number, Prandtl number and paramagnetic fluid parameter on the flow pattern and heat transfer are presented.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Cumulative arrays have played an important role in the early development of the secret sharing theory. They have not been subject to extensive study so far, as the secret sharing schemes built on them generally result in much larger sizes of shares, when compared with other conventional approaches. Recent works in threshold cryptography show that cumulative arrays may be the appropriate building blocks in non-homomorphic threshold cryptosystems where the conventional secret sharing methods are generally of no use. In this paper we study several extensions of cumulative arrays and show that some of these extensions significantly improve the performance of conventional cumulative arrays. In particular, we derive bounds on generalised cumulative arrays and show that the constructions based on perfect hash families are asymptotically optimal. We also introduce the concept of ramp perfect hash families as a generalisation of perfect hash families for the study of ramp secret sharing schemes and ramp cumulative arrays.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Weaving sections, a common design of motorways, require extensive lane-change manoeuvres. Numerous studies have found that drivers tend to make their lane changes as soon as they enter the weaving section, as the traffic volume increases. Congestion builds up as a result of this high lane-changing concentration. Importantly, such congestion also limits the use of existing infrastructure, the weaving section downstream. This behaviour thus affects both safety and operational aspects. The potential tool for managing motorways effectively and efficiently is cooperative intelligent transport systems (C-ITS). This research investigates a lane-change distribution advisory application based on C-ITS for weaving vehicles in weaving sections. The objective of this research is to alleviate the lane-changing concentration problem by coordinating weaving vehicles to ensure that such lane-changing activities are evenly distributed over the existing weaving length. This is achieved by sending individual messages to drivers based on their location to advise them when to start their lane change. The research applied a microscopic simulation in AIMSUN to evaluate the proposed strategy’s effectiveness in a one-sided ramp weave. The proposed strategy was evaluated using different weaving advisory proportions, traffic demands and penetration rates. The evaluation revealed that the proposed lane-changing advisory has the potential to significantly improve delay.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

With the recent development of advanced metering infrastructure, real-time pricing (RTP) scheme is anticipated to be introduced in future retail electricity market. This paper proposes an algorithm for a home energy management scheduler (HEMS) to reduce the cost of energy consumption using RTP. The proposed algorithm works in three subsequent phases namely real-time monitoring (RTM), stochastic scheduling (STS) and real-time control (RTC). In RTM phase, characteristics of available controllable appliances are monitored in real-time and stored in HEMS. In STS phase, HEMS computes an optimal policy using stochastic dynamic programming (SDP) to select a set of appliances to be controlled with an objective of the total cost of energy consumption in a house. Finally, in RTC phase, HEMS initiates the control of the selected appliances. The proposed HEMS is unique as it intrinsically considers uncertainties in RTP and power consumption pattern of various appliances. In RTM phase, appliances are categorized according to their characteristics to ease the control process, thereby minimizing the number of control commands issued by HEMS. Simulation results validate the proposed method for HEMS.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A multi-objective design optimization study has been conducted for upstream fuel injection through porous media applied to the first ramp of a two-dimensional scramjet intake. The optimization has been performed by coupling evolutionary algorithms assisted by surrogate modeling and computational fluid dynamics with respect to three design criteria, that is, the maximization of the absolute mixing quantity, total pressure saving, and fuel penetration. A distinct Pareto optimal front has been obtained, highlighting the counteracting behavior of the total pressure against the mixing efficiency and fuel penetration. The injector location and size have been identified as the key design parameters as a result of a sensitivity analysis, with negligible influence of the porous properties in the configurations and conditions considered in the present study. Flowfield visualization has revealed the underlying physics associated with the effects of these dominant parameters on the shock structure and intensity.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Executive Summary: Completion of the Veloway 1 (V1) will provide a dedicated and safe route for cyclists between the Brisbane CBD and the Gateway Motorway off-ramp at Eight Mile Plains alongside the South East Motorway. The V1 is being delivered in stages and when completed will provide a dedicated 3m wide cycleway 17km in length. Two stages (D and E) remain to be constructed to complete the V1. Major trip attractors along the V1 include the Mater, Princes Alexandra and Greenslopes Hospitals, two campuses of Griffith University, Garden City shopping centre and the Australian Tax Office. This report assesses the available evidence on the impacts on cycling behaviour of the recently completed V1 Stage C. The data sources informing this review include three intercept surveys, motion activated traffic cameras and travel time surveys on the V1 and adjoining South East Freeway Bikeway (SEFB), Strava app data, and cyclist crash data along Logan Road. The key findings from the evidence are that the completed V1 Stage C has: a Attracted cyclists from Holland Park, Holland Park West, Mt Gravatt and southern parts of Tarragindi onto the V1 Stage C. b Reduced the crash exposure of pedestrians to cyclists by attracting higher speed cyclists off the adjoining SEFB onto the cycling dedicated V1 Stage C. c Reduced the potential crash exposure of cyclists to motor vehicles by attracting cyclists off Logan Road on to the V1. d Provided travel time benefits to cyclists and reduced road crossings (eight down to two). e Predominantly attracted adults commuting alone to and from work and university. The evidence shows that the two traffic crossings across Birdwood Road (required as a temporary measure until the V1 is completed) negate much of the travel time gains of the V1 Stage C compared to the adjoining SEFB for southbound cyclists. Many cyclists accessing the V1 Stage C from the south are cycling in high-volume vehicular traffic lanes to reduce their travel time along Birdwood Road, but in the process are increasing their exposure to crashes with motor vehicles. Based on these findings this report recommends that TMR: a. Continue with plans to complete the V1 Veloway b. Undertake an engineering feasibility assessment to determine the viability of constructing a section of the V1 Stage E from the intersection Weller and Birdwood Roads over Marshall Road and along Bapaume Road on the western side of the Motorway to the intersection of Bapaume and Sterculia Roads. c. In the interim, improve signage and Birdwood Road crossing points for cyclists accessing and egressing the southern end of the V1 Stage C. d. Work with Brisbane City Council to identify the safest and most practical bicycle facilities to facilitate cycle travel between Logan Road and the V1 south of Birdwood Road. e. Improve the awareness of the V1 Stage C through signage for cyclists approaching from the north with the aim of providing a better understanding of the route of the V1 to the south. f. Refine the use of motion activated traffic cameras to improve the capture rate of useable images and obtain an ongoing collection over time of V1 usage data. g. Undertake discussions with Strava, Inc. to refine the presentation of Strava data to improve visual understanding of maps showing before and after cycle route volumes along and on roads leading to the V1.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Despite great advances in very large scale integrated-circuit design and manufacturing, performance of even the best available high-speed, high-resolution analog-to-digital converter (ADC) is known to deteriorate while acquiring fast-rising, high-frequency, and nonrepetitive waveforms. Waveform digitizers (ADCs) used in high-voltage impulse recordings and measurements are invariably subjected to such waveforms. Errors resulting from a lowered ADC performance can be unacceptably high, especially when higher accuracies have to be achieved (e.g., when part of a reference measuring system). Static and dynamic nonlinearities (estimated independently) are vital indices for evaluating performance and suitability of ADCs to be used in such environments. Typically, the estimation of static nonlinearity involves 10-12 h of time or more (for a 12-b ADC) and the acquisition of millions of samples at high input frequencies for dynamic characterization. ADCs with even higher resolution and faster sampling speeds will soon become available. So, there is a need to reduce testing time for evaluating these parameters. This paper proposes a novel and time-efficient method for the simultaneous estimation of static and dynamic nonlinearity from a single test. This is achieved by conceiving a test signal, comprised of a high-frequency sinusoid (which addresses dynamic assessment) modulated by a low-frequency ramp (relevant to the static part). Details of implementation and results on two digitizers are presented and compared with nonlinearities determined by the existing standardized approaches. Good agreement in results and time savings achievable indicates its suitability.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Despite great advances in very large scale integrated-circuit design and manufacturing, performance of even the best available high-speed, high-resolution analog-to-digital converter (ADC) is known to deteriorate while acquiring fast-rising, high-frequency, and nonrepetitive waveforms. Waveform digitizers (ADCs) used in high-voltage impulse recordings and measurements are invariably subjected to such waveforms. Errors resulting from a lowered ADC performance can be unacceptably high, especially when higher accuracies have to be achieved (e.g., when part of a reference measuring system). Static and dynamic nonlinearities (estimated independently) are vital indices for evaluating performance and suitability of ADCs to be used in such environments. Typically, the estimation of static nonlinearity involves 10-12 h of time or more (for a 12-b ADC) and the acquisition of millions of samples at high input frequencies for dynamic characterization. ADCs with even higher resolution and faster sampling speeds will soon become available. So, there is a need to reduce testing time for evaluating these parameters. This paper proposes a novel and time-efficient method for the simultaneous estimation of static and dynamic nonlinearity from a single test. This is achieved by conceiving a test signal, comprised of a high-frequency sinusoid (which addresses dynamic assessment) modulated by a low-frequency ramp (relevant to the static part). Details of implementation and results on two digitizers are presented and compared with nonlinearities determined by the existing standardized approaches. Good agreement in results and time savings achievable indicates its suitability.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Analogue and digital techniques for linearization of non-linear input-output relationship of transducers are briefly reviewed. The condition required for linearizing a non-linear function y = f(x) using a non-linear analogue-to-digital converter, is explained. A simple technique to construct a non-linear digital-to-analogue converter, based on ' segments of equal digital interval ' is described. The technique was used to build an N-DAC which can be employed in a successive approximation or counter-ramp type ADC to linearize the non-linear transfer function of a thermistor-resistor combination. The possibility of achieving an order of magnitude higher accuracy in the measurement of temperature is shown.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A simple ramp control firing circuit, suitable for use with fully controlled, line-commutated thyristor bridge circuits, is discussed here. This circuit uses very few components and generates the synchronized firing pulses in a simple way. It operates from a single 15 V Supply and has an inherent pulse inhibit facility. This circuit provides the synchronized firing pulses for both thyristors of the same limb in a bridge. To ensure reliability, wide triggering pulses are used, which are modulated to pass through the pulse transformers1 and demodulated before being fed to the thyristor gates. The use of throe such circuits only for a three-phase bridge is discussed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

To strive to improve the rehabilitation program of individuals with transfemoral amputation fitted with bone-anchored prosthesis based on data from direct measurements of the load applied on the residuum we first of all need to understand the load applied on the fixation. Therefore the load applied on the residuum was first directly measured during standardized activities of daily living such as straight line level walking, ascending and descending stairs and a ramp and walking around a circle. From measuring the load in standardized activities of daily living the load was also measured during different phases of the rehabilitation program such as during walking with walking aids and during load bearing exercises.[1-15] The rehabilitation program for individuals with a transfemoral amputation fitted with an OPRA implant relies on a combination of dynamic and static load bearing exercises.[16-20] This presentation will focus on the study of a set of experimental static load bearing exercises. [1] A group of eleven individuals with unilateral transfemoral amputation fitted with an OPRA implant participated in this study. The load on the implant during the static load bearing exercises was measured using a portable system including a commercial transducer embedded in a short pylon, a laptop and a customized software package. This apparatus was previously shown effective in a proof-of-concept study published by Prof. Frossard. [1-9] The analysis of the static load bearing exercises included an analysis of the reliability as well as the loading compliance. The analysis of the loading reliability showed a high reliability between the loading sessions indicating a correct repetition of the LBE by the participants. [1, 5] The analysis of the loading compliance showed a significant lack of axial compliance leading to a systematic underloading of the long axis of the implant during the proposed experimental static LBE.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

An article about holidaying with a child with autism on a popular Australian website has sparked exasperation among many parents and advocates. Ian Rogerson, Nicole Rogerson and Michael Whelan respond. Against a backdrop of a middle-class vacation at a beach house, disability arrives and Lives are Changed when a kid "steals" a sausage roll. No. This is not the premise for a rejected David Williamson screenplay. It's the work of a writer who felt her weekend away with a family whose number happened to include an autistic kid deserved some attention. As parents of children on the autism spectrum we too think the piece published on a major Australian website yesterday deserves some attention. Just, perhaps, not in the way its author had hoped.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Dietary nitrate (NO3−) supplementation with beetroot juice (BR) over 4–6 days has been shown to reduce the O2 cost of submaximal exercise and to improve exercise tolerance. However, it is not known whether shorter (or longer) periods of supplementation have similar (or greater) effects. We therefore investigated the effects of acute and chronic NO3− supplementation on resting blood pressure (BP) and the physiological responses to moderate-intensity exercise and ramp incremental cycle exercise in eight healthy subjects. Following baseline tests, the subjects were assigned in a balanced crossover design to receive BR (0.5 l/day; 5.2 mmol of NO3−/day) and placebo (PL; 0.5 l/day low-calorie juice cordial) treatments. The exercise protocol (two moderate-intensity step tests followed by a ramp test) was repeated 2.5 h following first ingestion (0.5 liter) and after 5 and 15 days of BR and PL. Plasma nitrite concentration (baseline: 454 ± 81 nM) was significantly elevated (+39% at 2.5 h postingestion; +25% at 5 days; +46% at 15 days; P < 0.05) and systolic and diastolic BP (baseline: 127 ± 6 and 72 ± 5 mmHg, respectively) were reduced by ∼4% throughout the BR supplementation period (P < 0.05). Compared with PL, the steady-state V̇o2 during moderate exercise was reduced by ∼4% after 2.5 h and remained similarly reduced after 5 and 15 days of BR (P < 0.05). The ramp test peak power and the work rate at the gas exchange threshold (baseline: 322 ± 67 W and 89 ± 15 W, respectively) were elevated after 15 days of BR (331 ± 68 W and 105 ± 28 W; P < 0.05) but not PL (323 ± 68 W and 84 ± 18 W). These results indicate that dietary NO3− supplementation acutely reduces BP and the O2 cost of submaximal exercise and that these effects are maintained for at least 15 days if supplementation is continued.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A simple ramp control firing circuit, suitable for use with fully controlled, line-commutated thyristor bridge circuits, is discussed here. This circuit uses very few components and generates the synchronized firing pulses in a simple way. It operates from a single 15 V Supply and has an inherent pulse inhibit facility. This circuit provides the synchronized firing pulses for both thyristors of the same limb in a bridge. To ensure reliability, wide triggering pulses are used, which are modulated to pass through the pulse transformers1 and demodulated before being fed to the thyristor gates. The use of throe such circuits only for a three-phase bridge is discussed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Using activity generated with Twitter during Movember 2013, we interrogate the natures of superficiality running through what can be defined as a highly successful public health engagement intervention. Indeed, Movember arguably has not just been successful in one year in terms of raising funds for the causes it is concerned with, it has done this year-on-year since 2004. We tracked the keyword 'movember' (without the hash symbol) using an in-house installation of YourTwapperkeeper hosted on a NECTAR server. Data collection ran from 01 October - 04 December 2013, covering the ramp-up and wind-down periods of the event. We collected a total of 1,313,426 tweets from 759,345 unique users.