836 resultados para Project Management Systems
Resumo:
This thesis is an exploratory study to scrutinise Project Knowledge Management in Project-Based Organisations, specifically in the Project Management Office (PMO). It is the first attempt to investigate the maturity of Project Management, from a Knowledge Management perspective. The findings of this study address multiple Knowledge Management processes and practices to both assess the level of Knowledge Management Maturity in PMOs, and improve the capability of Project Knowledge Management in Project-based Organisations. This research significantly contributes to bridge the current gap in the existing Project Management Maturity Models.
Resumo:
The power of projects has been demonstrated by the growth in their use across an increasing range of industries and workplaces in recent years. Not only has the number of people involved in project management increased, but the qualifications and backgrounds of those people have also broadened, with engineering no longer being the only path to project management (PM). Predicting the career trajectories in Project Management has become more important for both organisations employing project managers and project managers building career portfolios. Our research involved interviewing more than 75 project officers and project managers across a range of industries to explore their career journey. We used Wittgenstein’s family resemblance theory is to analyse the information from the transcripts to identify the extent to which the roles of participants fit with the commonly accepted definition of project management. Findings demonstrate diversity of project manager backgrounds and experiences and relational competencies across these backgrounds that form and shape PM careers.
Resumo:
Management of large projects, especially the ones in which a major component of R&D is involved and those requiring knowledge from diverse specialised and sophisticated fields, may be classified as semi-structured problems. In these problems, there is some knowledge about the nature of the work involved, but there are also uncertainties associated with emerging technologies. In order to draw up a plan and schedule of activities of such a large and complex project, the project manager is faced with a host of complex decisions that he has to take, such as, when to start an activity, for how long the activity is likely to continue, etc. An Intelligent Decision Support System (IDSS) which aids the manager in decision making and drawing up a feasible schedule of activities while taking into consideration the constraints of resources and time, will have a considerable impact on the efficient management of the project. This report discusses the design of an IDSS that helps in project planning phase through the scheduling phase. The IDSS uses a new project scheduling tool, the Project Influence Graph (PIG).
Resumo:
Purpose - The purpose of this paper is to explore the concept of performance plumbing, arguing that too often performance management systems in organisations are not correctly installed. Without the appropriate plumbing, performance management systems do not drive organisational change and improvement. Design/methodology/approach - The paper draws on the consultancy experiences of two of the authors, as well as the research of the third. Specific case examples are provided throughout the paper to illustrate the points being made. Findings - The paper argues that the key elements of a plumbed-in performance management system are: performance architecture; performance insights; performance focus; and performance action. Taken together, these four elements provide the necessary plumbing to enable performance management systems to deliver real value. Research limitations/implications - The paper draws on the experience of the authors, rather than a formally designed piece of research. The ideas presented in the paper would therefore benefit from further investigation and testing. Originality/value - The paper will be valuable to scholars and practitioners interested in ensuring that performance management systems deliver lasting value. © Emerald Group Publishing Limited.
Resumo:
The aim of this study was to explore how the remote control of appliances/lights (active energy management system) affected household well-being, compared to in-home displays (passive energy management system). A six-week exploratory study was conducted with 14 participants divided into the following three groups: active; passive; and no equipment. The effect on well-being was measured through thematic analysis of two semi-structured interviews for each participant, administered at the start and end of the study. The well-being themes were based on existing measures of Satisfaction and Affect. The energy demand for each participant was also measured for two weeks without intervention, and then compared after four weeks with either the passive or active energy management systems. These measurements were used to complement the well-being analysis. Overall, the measure of Affect increased in the passive group but Satisfaction decreased; however, all three measures on average decreased in the active group. The measured energy demand also highlighted a disconnect between well-being and domestic energy consumption. The results point to a need for further investigation in this field; otherwise, there is a risk that nationally implemented energy management solutions may negatively affect our happiness and well-being. © 2013 Elsevier Ltd.
Resumo:
Due to concerns about environmental protection and resource utilization, product lifecycle management for end-of-life (EOL) has received increasing attention in many industrial sectors including manufacturing, maintenance/repair, and recycling/refurbishing of the product. To support these functions, crucial issues are studied to realize a product recovery management system (PRMS), including: (1) an architecture design for EOL services, such as remanufacturing and recycling; (2) a product data model required for EOL activity based on international standards; and (3) an infrastructure for information acquisition and mapping to product lifecycle information. The presented works are illustrated via a realistic scenario. © 2008 Elsevier B.V. All rights reserved.