998 resultados para Perovskites with Eu
Resumo:
In this paper, a singularly perturbed ordinary differential equation with non-smooth data is considered. The numerical method is generated by means of a Petrov-Galerkin finite element method with the piecewise-exponential test function and the piecewise-linear trial function. At the discontinuous point of the coefficient, a special technique is used. The method is shown to be first-order accurate and singular perturbation parameter uniform convergence. Finally, numerical results are presented, which are in agreement with theoretical results.
Resumo:
This paper is concerned with the surface profiles of a strip after rigid bodies with serrated (saw-teeth) surfaces indent the strip and are subsequently removed. Plane-strain conditions are assumed. This has application in roughness transfer of final metal forming process. The effects of the semi-angle of the teeth, the depth of indentation and the friction on the contact surface on the profile are considered.
Resumo:
In this paper, a space fractional di®usion equation (SFDE) with non- homogeneous boundary conditions on a bounded domain is considered. A new matrix transfer technique (MTT) for solving the SFDE is proposed. The method is based on a matrix representation of the fractional-in-space operator and the novelty of this approach is that a standard discretisation of the operator leads to a system of linear ODEs with the matrix raised to the same fractional power. Analytic solutions of the SFDE are derived. Finally, some numerical results are given to demonstrate that the MTT is a computationally e±cient and accurate method for solving SFDE.
Resumo:
A range of influences, technical and organizational, has encouraged the wide spread adaption of Enterprise Systems (ES). Nevertheless, there is a growing consensus that Enterprise Systems have in the many cases failed to provide the expected benefits to organizations. This paper presents ongoing research, which analyzes the benefits realization approach of the Queensland Government. This approach applies a modified Balance Scorecard. First, history and background of Queensland Government’s Enterprise Systems initiative is introduced. Second, the most common reasons for ES under performance are related. Third, relevant performance measurement models and the Balanced Scorecard in particular are discussed. Finally, the Queensland Government initiative is evaluated in light of this overview of current work in the area. In the current and future work, the authors aim to use their active involvement in Queensland Government’s benefits realization initiative for an Action Research based project investigating the appropriateness of the Balanced Scorecard for the purposes of Enterprise Systems benefits realization.