746 resultados para Performance management systems


Relevância:

100.00% 100.00%

Publicador:

Resumo:

A través de una investigación relacionada con el análisis de seis profesores de enseñanza primaria filmados en sus aulas, explora la naturaleza de una enseñanza eficiente, que se basa en el informe de Hay McBer 'Un modelo de eficacia docente',donde se examina la eficacia de los profesores en tres elementos clave: las habilidades de enseñanza; características profesionales y el clima en el aula. Todas ellas están dentro del control del profesor y ejercen una influencia significativa en el progreso del alumno. Este libro y DVD permitirán a todos los profesores desarrollar un lenguaje común de prácticas en el aula.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last Planner System™, called ‘KanBIM’, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A homologous series of macrocyclic oligoamides has been prepared in high yield by reaction of isophthaloyl chloride with m-phenylenediamine under pseudo-high-dilution conditions. The products were characterized by infrared and H-1 NMR spectroscopies, matrix assisted laser desorption-ionization time-of-flight mass spectrometry, and gel permeation chromatography (GPC). A series of linear oligomers was prepared for comparison. The macrocycles ranged in size from the cyclic trimer up to at least the cyclic nonamer (90 ring atoms). The same homologous series of macrocyclic oligomers was prepared in high yield by the cyclodepolymerization of poly(m-phenylene isophthalamide) (Nomex). Cyclodepolymerization was best achieved by treating a 1% w/v solution of the polymer in dimethyl sulfoxide containing calcium chloride or lithium chloride with 3-4 mol % of sodium hydride or the sodium salt of benzanilide at 150 degreesC for 70 h. Treatment of a concentrated solution of the macrocyclic oligomers (25% w/v) with 4 mol % of sodium hydride or the sodium salt of benzanilide in a solution of lithium chloride in dimethyl sulfoxide at 170 degreesC for 6 h resulted in efficient entropically driven ring-opening polymerizations to give poly(m-phenylene isophthalamide), characterized by infrared and H-1 NMR spectroscopies and by GPC. The molecular weights obtained were comparable with those of the commercial polymer.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper describes the development and validation of a novel web-based interface for the gathering of feedback from building occupants about their environmental discomfort including signs of Sick Building Syndrome (SBS). The gathering of such feedback may enable better targeting of environmental discomfort down to the individual as well as the early detection and subsequently resolution by building services of more complex issues such as SBS. The occupant's discomfort is interpreted and converted to air-conditioning system set points using Fuzzy Logic. Experimental results from a multi-zone air-conditioning test rig have been included in this paper.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper describes the development of an experimental distributed fuzzy control system for heating and ventilation (HVAC) systems within a building. Each local control loop is affected by a number of local variables, as well as information from neighboring controllers. By including this additional information it is hoped that a more equal allocation of resources can be achieved.

Relevância:

100.00% 100.00%

Publicador: