956 resultados para Office management.
Resumo:
This paper is concerned with investigating existing and potential scope of Dublin Core metadata in Knowledge Management contexts. Modelling knowledge is identified as a conceptual prerequisite in this investigation, principally for the purpose of clarifying scope prior to identifying the range of tasks associated with organising knowledge. A variety of models is presented and relationships between data, information, and knowledge discussed. It is argued that the two most common modes of organisation, hierarchies and networks, influence the effectiveness and flow of knowledge. Practical perspective is provided by reference to implementations and projects providing evidence of how DC metadata is applied in such contexts. A sense-making model is introduced that can be used as a shorthand reference for identifying useful facets of knowledge that might be described using metadata. Discussion is aimed at presenting this model in a way that both validates current applications and points to potential novel applications.
Resumo:
The increasing stock of aging office buildings will see a significant growth in retrofitting projects in Australian capital cities. Stakeholders of refitting works will also need to take on the sustainability challenge and realize tangible outcomes through project delivery. Traditionally, decision making for aged buildings, when facing the alternatives, is typically economically driven and on ad hoc basis. This leads to the tendency to either delay refitting for as long as possible thus causing building conditions to deteriorate, or simply demolish and rebuild with unjust financial burden. The technologies involved are often limited to typical strip-clean and repartition with dry walls and office cubicles. Changing business operational patterns, the efficiency of office space, and the demand on improved workplace environment, will need more innovative and intelligent approaches to refurbishing office buildings. For example, such projects may need to respond to political, social, environmental and financial implications. There is a need for the total consideration of buildings structural assessment, modeling of operating and maintenance costs, new architectural and engineering designs that maximise the utility of the existing structure and resulting productivity improvement, specific construction management procedures including procurement methods, work flow and scheduling and occupational health and safety. Recycling potential and conformance to codes may be other major issues. This paper introduces examples of Australian research projects which provided a more holistic approach to the decision making of refurbishing office space, using appropriate building technologies and products, assessment of residual service life, floor space optimisation and project procurement in order to bring about sustainable outcomes. The paper also discusses a specific case study on critical factors that influence key building components for these projects and issues for integrated decision support when dealing with the refurbishment, and indeed the “re-life”, of office buildings.
Resumo:
The purpose of this paper is to explore the trend of Purpose Built Office (PBO) supply and occupancy in Malaysia. In achieving this, the number of PBO supply by the private sector in the market is compared with the government sector to gain an understanding of the current emerging market for the PBO. There have been limited studies in Malaysia comparing the trend supply and occupancy of PBOs by both sectors. This paper outcome will illustrate the needs for public sector asset management in Malaysia, particularly for PBOs. An analytical framework is developed using time series to measure the level of supply and occupancy of PBO by both sectors, indicating the percentage of government’s PBO compared to the total numbers of PBOs in the market from 2004 to 2010
Resumo:
As global warming entails new conditions for the built environment, the thermal behavior of existing buildings, which were designed based on current weather data, may become unclear and remain a great concern. Through building computer simulation, this paper investigates the sensitivity of different office building zoning to the potential global warming. From the sample office building examined, it is found that compared with the middle and top floors, the ground floor for most cities appears to be most sensitive to the effect of global warming and has the highest tendency to having the overheating problem. From the analysis of the responses of different zone orientations to the outdoor air temperature increase, it is also found that there are widely different responses between different zone orientations, with South or Core zone being most sensitive. With an increased external air temperature, the difference between different floors or different zone orientations will become more significant.
Resumo:
Australia’s domestic income tax legislation and double tax agreements contain transfer pricing rules which are designed to counter the underpayment of tax by businesses engaged in international dealings between related parties. The current legislation and agreements require that related party transactions take place at a value which reflects an arm’s length price, that is, a price which would be charged between unrelated parties. For a host of reasons, it is increasingly difficult for multinational entities to demonstrate that they are transferring goods and services at a price which is reflective of the behaviour of independent parties, thereby making it difficult to demonstrate compliance with the relevant legislation. Further, where an Australian business undertakes cross-border related party transactions there is the risk of an audit by the Australian Tax Office (ATO). If a business wishes to avoid the risk of an audit, and any ensuing penalties, there is one option: an advance pricing arrangement (APA). An APA is an agreement whereby the future transfer pricing methodology to be used to determine the arm’s length price is agreed to by the taxpayer and the relevant tax authority or authorities. The ATO views the APA process as an important part of its international tax strategy and believes that there are complementary benefits provided to both the taxpayer and the ATO. The ATO promotes the APA process on the basis of creating greater certainty for all parties while reducing compliance costs and the risk of audit and penalty. While the ATO regards the APA system as a success, it may be argued that the implementation of such a system is simply a practical solution to an ongoing problem of an inherent failure in both the legislation and ATO interpretation and application of this legislation to provide certainty to the taxpayer. This paper investigates the use of APAs as a solution to the problem of transfer pricing and considers whether they are the success the ATO claims. It is argued that there is no doubt that APAs provide a valuable practical tool for multinational entities facing the challenges of the taxation of global trading under the current transfer pricing regime. It does not, however, provide a long term solution. Rather, the long term solution may be in the form of legislative amendment.
Resumo:
Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.
Resumo:
This important research is published at a critical time in the history of PRINCE2. The world’s project managers are under incredible scrutiny and pressure to ensure their projects deliver quality on time and on budget – and even more so during a world recession. The research shows that PRINCE2 goes a long way to helping them achieve these goals. Although its origins began in the UK, PRINCE2 now has a truly international reach. We are delighted that the Queensland University of Technology (QUT) has undertaken this global, thorough and informative research project. While it highlights the strengths of the methodology itself, the report also looks at the challenges organisations face when using a project management method such as PRINCE2. We’re sure the challenges will resonate with project managers around the world. Securing executive support to champion the adoption of PRINCE2, creating a robust business case and prioritising project governance are key issues that all project managers will grapple with during their career. The research also shows that to be thoroughly effective, organisations need to properly embed PRINCE2 and tailor it to suit their particular circumstances. Many successful organisations have sought the effective help of accredited consulting organisations to assist them in developing a programme to tailor and inculcate this method into their organisational culture. The latest version incorporates a whole chapter on tailoring PRINCE2. We believe that the publication of PRINCE2 Directing Successful Projects using PRINCE2 and the development of further support in the form of materials, mentoring and training for senior executives will be of significant benefit to contemporary project based organisations. The APM Group has already developed a qualification for sponsors in conjunction with the UK’s Home Office to help with this.
Resumo:
In 2003, the Green Building Council of Australia (GBCA) launched their Green Star rating tools for various types of buildings in order to promote green building practice in Australia. Of these, the Green Star-Office Interior rating tool is designed for building owners, tenants and interior designers to assess the environmental impact of an interior fitout. It covers a number of categories, including Management, Indoor Environment Quality, Energy, Transport, Water, Materials, Land Use and Ecology, Emissions, and Innovation. This paper reviews the usage of the Green Star system in Australian office tenancy fitouts and the potential challenges associated with Green Star-Office Interior implementation. This involves the analysis of score sheets of 66 office interior projects across Australia that achieved Green Star certification. The percentage of green star points obtained within each category and sub-categories (credits) for each project are investigated to illustrate the achievement of credits. The results show that Emission-related credits and Innovation related credits are the easiest and most difficult respectively to obtain. It is also found that 6 Green Star office interior projects perform especially better in the categories of Energy and Ecology than 4 and 5 Star projects. The investigation of point frequency in each category provides prospective Green Star applicants with insights into credit achievement for future projects.
Resumo:
Business Process Management (BPM) is accepted globally as an organizational approach to enhance productivity and drive cost efficiencies. Studies confirm a shortage of BPM skilled professionals with limited opportunities to develop the required BPM expertise. This study investigates this gap starting from a critical analysis of BPM courses offered by Australian universities and training institutions. These courses were analyzed and mapped against a leading BPM capability framework to determine how well current BPM education and training offerings in Australia address the core capabilities required by BPM professionals globally. To determine the BPM skill-sets sought by industry, online recruitment advertisements were collated, analyzed, and mapped against this BPM capability framework. The outcomes provide a detailed overview on the alignment of available BPM education/training and industry demand. These insights are useful for BPM professionals and their employers to build awareness of the BPM capabilities required for a BPM mature organization. Universities and other training institutions will benefit from these results by understanding where demand is, where the gaps are, and what other BPM education providers are supplying. This structured comparison method could continue to provide a common ground for future discussion across university-industry boundaries and continuous alignment of their respective practices.
Resumo:
The number of office building retrofit projects is increasing. These projects are characterised by processes which have a close relationship with waste generation and therefore demand a high level of waste management. In a preliminary study reported separately, we identified seven critical factors of on-site waste generation in office building retrofit projects. Through semi-structured interviews and Interpretive Structural Modelling, this research further investigated the interrelationships among these critical waste factors, to identify each factor’s level of influence on waste generation and propose effective solutions for waste minimization. “Organizational commitment” was identified as the fundamental issue for waste generation in the ISM system. Factors related to plan, design and construction processes were found to be located in the middle levels of the ISM model but still had significant impacts on the system as a whole. Based on the interview findings and ISM analysis results, some practical solutions were proposed for waste minimization in building retrofit projects: (1) reusable and adaptable fit-out design; (2) a system for as-built drawings and building information; (3) integrated planning for retrofitting work process and waste management; and (4) waste benchmarking development for retrofit projects. This research will provide a better understanding of waste issues associated with building retrofit projects and facilitate enhanced waste minimization.
Interaction of psychosocial risk factors explain increased neck problems among female office workers
Resumo:
This study investigated the relationship between psychosocial risk factors and (1) neck symptoms and (2) neck pain and disability as measured by the neck disability index (NDI). Female office workers employed in local private and public organizations were invited to participate, with 333 completing a questionnaire. Data were collected on various risk factors including age, negative affectivity, history of previous neck trauma, physical work environment, and task demands. Sixty-one percent of the sample reported neck symptoms lasting greater than 8 days in the last 12 months. The mean NDI of the sample was 15.5 out of 100, indicating mild neck pain and disability. In a hierarchical multivariate logistic regression, low supervisor support was the only psychosocial risk factor identified with the presence of neck symptoms. Similarly, low supervisor support was the only factor associated with the score on the NDI. These associations remained after adjustment for potential confounders of age, negative affectivity, and physical risk factors. The interaction of job demands, decision authority, and supervisor support was significantly associated with the NDI in the final model and this association increased when those with previous trauma were excluded. Interestingly, and somewhat contrary to initial expectations, as job demands increased, high decision authority had an increasing effect on the NDI when supervisor support was low.
Resumo:
This study was undertaken to investigate any relationship between sensory features and neck pain in female office workers using quantitative sensory measures to better understand neck pain in this group. Office workers who used a visual display monitor for more than four hours per day with varying levels of neck pain and disability were eligible for inclusion. There were 85 participants categorized according to their scores on the neck disability index (NDI): 33 with no pain (NDI < 8); 38 with mild levels of pain and disability (NDI 9–29); 14 with moderate levels of pain (NDI ⩾ 30). A fourth group of women without neck pain (n = 22) who did not work formed the control group. Measures included: thermal pain thresholds over the posterior cervical spine; pressure pain thresholds over the posterior neck, trapezius, levator scapulae and tibialis anterior muscles, and the median nerve trunk; sensitivity to vibrotactile stimulus over areas of the hand innervated by the median, ulnar and radial nerves; sympathetic vasoconstrictor response. All tests were conducted bilaterally. ANCOVA models were used to determine group differences between the means for each sensory measure. Office workers with greater self-reported neck pain demonstrated hyperalgesia to thermal stimuli over the neck, hyperalgesia to pressure stimulation over several sites tested; hypoaesthesia to vibration stimulation but no changes in the sympathetic vasoconstrictor response. There is evidence of multiple peripheral nerve dysfunction with widespread sensitivity most likely due to altered central nociceptive processing initiated and sustained by nociceptive input from the periphery.
Resumo:
This study determined differences between computer workers with varying levels of neck pain in terms of work stressors, employee strain, electromyography (EMG) amplitude and heart rate response to various tasks. Participants included 85 workers (33, no pain; 38, mild pain; 14, moderate pain) and 22 non-working controls. Work stressors evaluated were job demands, decision authority, and social support. Heart rate was recorded during three tasks: copy-typing, typing with superimposed stress and a colour word task. Measures included electromyography signals from the sternocleidomastoid (SCM), anterior scalene (AS), cervical extensor (CE) and upper trapezius (UT) muscles bilaterally. Results showed no difference between groups in work stressors or employee strain measures. Workers with and without pain had higher measured levels of EMG amplitude in SCM, AS and CE muscles during the tasks than controls (all P < 0.02). In workers with neck pain, the UT had difficulty in switching off on completion of tasks compared with controls and workers without pain. There was an increase in heart rate, perceived tension and pain and decrease in accuracy for all groups during the stressful tasks with symptomatic workers producing more typing errors than controls and workers without pain. These findings suggest an altered muscle recruitment pattern in the neck flexor and extensor muscles. Whether this is a consequence or source of the musculoskeletal disorder cannot be determined from this study. It is possible that workers currently without symptoms may be at risk of developing a musculoskeletal disorder.
Resumo:
Study Design Cross-sectional study. Objective To explore aspects of cervical musculoskeletal function in female office workers with neck pain. Summary of Background Data Evidence of physical characteristics that differentiate computer workers with and without neck pain is sparse. Patients with chronic neck pain demonstrate reduced motion and altered patterns of muscle control in the cervical flexor and upper trapezius (UT) muscles during specific tasks. Understanding cervical musculoskeletal function in office workers will better direct intervention and prevention strategies. Methods Measures included neck range of motion; superficial neck flexor muscle activity during a clinical test, the craniocerivcal flexion test; and a motor task, a unilateral muscle coordination task, to assess the activity of both the anterior and posterior neck muscles. Office workers with and without neck pain were formed into 3 groups based on their scores on the Neck Disability Index. Nonworking women without neck pain formed the control group. Surface electromyographic activity was recorded bilaterally from the sternocleidomastoid, anterior scalene (AS), cervical extensor (CE) and UT muscles. Results Workers with neck pain had reduced rotation range and increased activity of the superficial cervical flexors during the craniocervical flexion test. During the coordination task, workers with pain demonstrated greater activity in the CE muscles bilaterally. On completion of the task, the UT and dominant CE and AS muscles demonstrated an inability to relax in workers with pain. In general, there was a linear relationship between the workers’ self-reported levels of pain and disability and the movement and muscle changes. Conclusion These results are consistent with those found in other cervical musculoskeletal disorders and may represent an altered muscle recruitment strategy to stabilize the head and neck. An exercise program including motor reeducation may assist in the management of neck pain in office workers.