637 resultados para North-East New South Wales
Resumo:
Australian heroin markets have recently undergone dramatic change, sparking debate about the nature of such markets. This study aimed to determine the onset, peak and decline of the heroin shortage in New South Wales (NSW), using the most appropriate available methods to detect market level changes. The parameters of the heroin shortage were determined by reviewing: reports of heroin users about availability and price (derived from the existing literature and the Illicit Drug Reporting System); qualitative interviews with injecting drug users, and health and law enforcement professionals working in the illicit drug field; and examining data on heroin seizures over the past decade. There was a marked reduction in heroin supply in NSW in early 2001. An increase in the price of heroin occurred in 2001, whereas it had decreased steadily since 1996. A reduction in purity also occurred, as reported by drug users and heroin seizures. The peak period of the shortage appears to have been January to April 2001. The market appears to have stabilised since that time, although it has not returned to pre- 2001 levels: heroin prices have decreased in NSW for street grams, but not to former levels, and the price of `caps' (street deals) remain elevated. Heroin purity in NSW has remained low, with perhaps a 10% increase above the lowest recorded levels. These data support the notion that the heroin market in NSW underwent significant changes, which appear to have involved a lasting shift in the nature of the market.
Resumo:
In the three years to June 2005, 959 injuries associated with continuous miners (CMs), shuttle cars (SCs), load–haul–dump and personnel transport (PT) were reported by NSW underground coal mines, comprising 23% of all injuries reported. The present paper reports an analysis of the narrative field accompanying these reports to determine opportunities for controlling injury risks. The most common combinations of activity and mechanism were: strain while handling CM cable (96 injuries); caught between or struck by moving parts while bolting on a CM (86 injuries); strains while bolting on CM (54 injuries); and slipping off a CM during access, egress or other activity (60 injuries). For the other equipment considered, the common injury mechanism was the vehicle running over a pothole or other roadway abnormality causing the driver or passengers to be injured (169 injuries). Potential control measures include: monorails for CM services; hydraulic cable reelers; handrails on CM platforms; redesign of CM platforms and bolting rigs to reduce reach distances during drilling and bolting; improvements to guarding of bolting controls; standardisation and shape coding of bolting controls; two handed fast feed; improvements in underground roadway maintenance, vehicle suspension, visibility and seating; and pedestrian proximity warning devices.
Resumo:
This paper argues that we need to bring government back into discussions about network governance, via the concept of metagovernance which uses water reform in an Australian state as an example. Metagovernance is defined as the government of governance, and is a vital but under researched and under theorised problem because it is difficult and contentious. The paper identifies a range of metagovernance failures in this case and suggests that the lessons learnt by the Australian authorities from the experience have led to some rethinking about the benefits and desirable scope of network governance.