792 resultados para Management Effectiveness


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building for a sustainable environment requires sustainable infrastructure assets. Infrastructure capacity management is the process of ensuring optimal provision of such infrastructure assets. Effectiveness in this process will enable the infrastructure asset owners and its stakeholders to receive full value on their investment. Business research has shown that an organisation can only achieve business value when it has the right capabilities. This paradigm can also be applied to infrastructure capacity management. With limited access to resources, the challenge for infrastructure organisations is to identify and develop core capabilities to enable infrastructure capacity management. This chapter explores the concept of capability and identifies the core capability needed in infrastructure capacity management. Through a case study of the Port of Brisbane, this chapter shows that infrastructure organisations must develop their intelligence gathering capability to effectively manage the capacity of their infrastructure assets.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Water Sensitive Urban Design (WSUD) systems have the potential mitigate the hydrologic disturbance and water quality concerns associated with stormwater runoff from urban development. In the last few years WSUD has been strongly promoted in South East Queensland (SEQ) and new developments are now required to use WSUD systems to manage stormwater runoff. However, there has been limited field evaluation of WSUD systems in SEQ and consequently knowledge of their effectiveness in the field, under storm events, is limited. The objective of this research project was to assess the effectiveness of WSUD systems installed in a residential development, under real storm events. To achieve this objective, a constructed wetland, bioretention swale and a bioretention basin were evaluated for their ability to improve the hydrologic and water quality characteristics of stormwater runoff from urban development. The monitoring focused on storm events, with sophisticated event monitoring stations measuring the inflow and outflow from WSUD systems. Data analysis undertaken confirmed that the constructed wetland, bioretention basin and bioretention swale improved the hydrologic characteristics by reducing peak flow. The bioretention systems, particularly the bioretention basin also reduced the runoff volume and frequency of flow, meeting key objectives of current urban stormwater management. The pollutant loads were reduced by the WSUD systems to above or just below the regional guidelines, showing significant reductions to TSS (70-85%), TN (40-50%) and TP (50%). The load reduction of NOx and PO4 3- by the bioretention basin was poor (<20%), whilst the constructed wetland effectively reduced the load of these pollutants in the outflow by approximately 90%. The primary reason for the load reduction in the wetland was due to a reduction in concentration in the outflow, showing efficient treatment of stormwater by the system. In contrast, the concentration of key pollutants exiting the bioretention basin were higher than the inflow. However, as the volume of stormwater exiting the bioretention basin was significantly lower than the inflow, a load reduction was still achieved. Calibrated MUSIC modelling showed that the bioretention basin, and in particular, the constructed wetland were undersized, with 34% and 62% of stormwater bypassing the treatment zones in the devices. Over the long term, a large proportion of runoff would not receive treatment, considerably reducing the effectiveness of the WSUD systems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Product placement is a fast growing multi-billion dollar industry yet measures of its effectiveness, which influence the critical area of pricing, have been problematic. Past attempts to measure the effect of a placement, and therefore provide a basis for pricing of placements, have been confounded by the effect on consumers of multiple prior exposures of a brand name in all marketing communications. Virtual product placement offers certain advantages: as a tool to measure the effectiveness of product placements; assistance with the problem of lack of audience selectivity in traditional product placement; testing different audiences for brands and addressing a gap in the existing academic literature by focusing on the impact of product placement on recall and recognition of new brands.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Physical infrastructure assets are important components of our society and our economy. They are usually designed to last for many years, are expected to be heavily used during their lifetime, carry considerable load, and are exposed to the natural environment. They are also normally major structures, and therefore present a heavy investment, requiring constant management over their life cycle to ensure that they perform as required by their owners and users. Given a complex and varied infrastructure life cycle, constraints on available resources, and continuing requirements for effectiveness and efficiency, good management of infrastructure is important. While there is often no one best management approach, the choice of options is improved by better identification and analysis of the issues, by the ability to prioritise objectives, and by a scientific approach to the analysis process. The abilities to better understand the effect of inputs in the infrastructure life cycle on results, to minimise uncertainty, and to better evaluate the effect of decisions in a complex environment, are important in allocating scarce resources and making sound decisions. Through the development of an infrastructure management modelling and analysis methodology, this thesis provides a process that assists the infrastructure manager in the analysis, prioritisation and decision making process. This is achieved through the use of practical, relatively simple tools, integrated in a modular flexible framework that aims to provide an understanding of the interactions and issues in the infrastructure management process. The methodology uses a combination of flowcharting and analysis techniques. It first charts the infrastructure management process and its underlying infrastructure life cycle through the time interaction diagram, a graphical flowcharting methodology that is an extension of methodologies for modelling data flows in information systems. This process divides the infrastructure management process over time into self contained modules that are based on a particular set of activities, the information flows between which are defined by the interfaces and relationships between them. The modular approach also permits more detailed analysis, or aggregation, as the case may be. It also forms the basis of ext~nding the infrastructure modelling and analysis process to infrastructure networks, through using individual infrastructure assets and their related projects as the basis of the network analysis process. It is recognised that the infrastructure manager is required to meet, and balance, a number of different objectives, and therefore a number of high level outcome goals for the infrastructure management process have been developed, based on common purpose or measurement scales. These goals form the basis of classifYing the larger set of multiple objectives for analysis purposes. A two stage approach that rationalises then weights objectives, using a paired comparison process, ensures that the objectives required to be met are both kept to the minimum number required and are fairly weighted. Qualitative variables are incorporated into the weighting and scoring process, utility functions being proposed where there is risk, or a trade-off situation applies. Variability is considered important in the infrastructure life cycle, the approach used being based on analytical principles but incorporating randomness in variables where required. The modular design of the process permits alternative processes to be used within particular modules, if this is considered a more appropriate way of analysis, provided boundary conditions and requirements for linkages to other modules, are met. Development and use of the methodology has highlighted a number of infrastructure life cycle issues, including data and information aspects, and consequences of change over the life cycle, as well as variability and the other matters discussed above. It has also highlighted the requirement to use judgment where required, and for organisations that own and manage infrastructure to retain intellectual knowledge regarding that infrastructure. It is considered that the methodology discussed in this thesis, which to the author's knowledge has not been developed elsewhere, may be used for the analysis of alternatives, planning, prioritisation of a number of projects, and identification of the principal issues in the infrastructure life cycle.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The concept of asset management is not a new but an evolving idea that has been attracting attention of many organisations operating and/or owning some kind of infrastructure assets. The term asset management have been used widely with fundamental differences in interpretation and usage. Regardless of the context of the usage of the term, asset management implies the process of optimising return by scrutinising performance and making key strategic decisions throughout all phases of an assets lifecycle (Sarfi and Tao, 2004). Hence, asset management is a philosophy and discipline through which organisations are enabled to more effectively deploy their resources to provide higher levels of customer service and reliability while balancing financial objectives. In Australia, asset management made its way into the public works in 1993 when the Australian Accounting Standard Board issued the Australian Accounting Standard 27 – AAS27. Standard AAS27 required government agencies to capitalise and depreciate assets rather than expense them against earnings. This development has indirectly forced organisations managing infrastructure assets to consider the useful life and cost effectiveness of asset investments. The Australian State Treasuries and the Australian National Audit Office was the first organisation to formalise the concepts and principles of asset management in Australia in which they defined asset management as “ a systematic, structured process covering the whole life of an asset”(Australian National Audit Office, 1996). This initiative led other Government bodies and industry sectors to develop, refine and apply the concept of asset management in the management of their respective infrastructure assets. Hence, it can be argued that the concept of asset management has emerged as a separate and recognised field of management during the late 1990s. In comparison to other disciplines such as construction, facilities, maintenance, project management, economics, finance, to name a few, asset management is a relatively new discipline and is clearly a contemporary topic. The primary contributors to the literature in asset management are largely government organisations and industry practitioners. These contributions take the form of guidelines and reports on the best practice of asset management. More recently, some of these best practices have been made to become a standard such as the PAS 55 (IAM, 2004, IAM, 2008b) in UK. As such, current literature in this field tends to lack well-grounded theories. To-date, while receiving relatively more interest and attention from empirical researchers, the advancement of this field, particularly in terms of the volume of academic and theoretical development is at best moderate. A plausible reason for the lack of advancement is that many researchers and practitioners are still unaware of, or unimpressed by, the contribution that asset management can make to the performance of infrastructure asset. This paper seeks to explore the practices of organisations that manage infrastructure assets to develop a framework of strategic infrastructure asset management processes. It will begin by examining the development of asset management. This is followed by the discussion on the method to be adopted for this paper. Next, is the discussion of the result form case studies. It first describes the goals of infrastructure asset management and how they can support the broader business goals. Following this, a set of core processes that can support the achievement of business goals are provided. These core processes are synthesised based on the practices of asset managers in the case study organisations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Aim: This paper is a report of a study conducted to determine the effectiveness of a community case management collaborative education intervention in terms of satisfaction, learning and performance among public health nurses. Background: Previous evaluation studies of case management continuing professional education often failed to demonstrate effectiveness across a range of outcomes and had methodological weaknesses such as small convenience samples and lack of control groups. Method: A cluster randomised controlled trial was conducted between September 2005 and February 2006. Ten health centre clusters (5 control, 5 intervention) recruited 163 public health nurses in Taiwan to the trial. After pre-tests for baseline measurements, public health nurses in intervention centres received an educational intervention of four half-day workshops. Post-tests for both groups were conducted after the intervention. Two-way repeated measures analysis of variance was performed to evaluate the effect of the intervention on target outcomes. Results: A total of 161 participants completed the pre- and post-intervention measurements. This was almost a 99% response rate. Results revealed that 97% of those in the experimental group were satisfied with the programme. There were statistically significant differences between the two groups in knowledge (p = 0.001), confidence in case management skills (p = 0.001), preparedness for case manager role activities (p = 0.001), self-reported frequency in using skills (p = 0.001), and role activities (p = 0.004). Conclusion: Collaboration between academic and clinical nurses is an effective strategy to prepare nurses for rapidly-changing roles.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Study Design: Case Study Series.---------- Introduction: Restriction of forearm rotation may be required for effective management and rehabilitation of the upper limb after trauma.---------- Purpose of the Study: To compare the effectiveness of four splints in restricting forearm rotation.---------- Methods: Muenster, Sugartong, antipronation distal radioulnar joint (DRUJ), and standard wrist splints were fabricated for five healthy participants. Active range of motion (AROM) in forearm pronation and supination was measured with a goniometer for each splint, at the initial point of sensory feedback and during exertion of maximal force.---------- Results: Repeated-measures analysis of variance indicated significant differences between splints for all four AROM measures. Post hoc paired t-tests showed that the Sugartong splint was significantly more restrictive in pronation than the Muenster splint. The antipronation DRUJ splint provided significantly greater restriction in pronation than the standard wrist splint. No splints immobilized the forearm completely.---------- Conclusions: The Sugartong splint is recommended for maximal restriction in pronation, but individual patient characteristics require consideration in splint choice.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose - This paper seeks to examine the complex relationships between urban planning, infrastructure management, sustainable urban development, and to illustrate why there is an urgent need for local governments to develop a robust planning support system which integrates with advance urban computer modelling tools to facilitate better infrastructure management and improve knowledge sharing between the community, urban planners, engineers and decision makers. Design/methodology/approach - The methods used in this paper includes literature review and practical project case observations. Originality/value - This paper provides an insight of how the Brisbane's planning support system established by Brisbane City Council has significantly improved the effectiveness of urban planning, infrastructure management and community engagement through better knowledge management processes. Practical implications - This paper presents a practical framework for setting up a functional planning support system within local government. The integration of the Brisbane Urban Growth model, Virtual Brisbane and the Brisbane Economic Activity Monitoring (BEAM) database have proven initially successful to provide a dynamic platform to assist elected officials, planners and engineers to understand the limitations of the local environment, its urban systems and the planning implications on a city. With the Brisbane's planning support system, planners and decision makers are able to provide better planning outcomes, policy and infrastructure that adequately address the local needs and achieve sustainable spatial forms.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There has been a remarkable expansion in the use of executive coaching as an executive development technique over the past two decades. The widespread popularity of executive coaching has been based largely on anecdotal feedback regarding its effectiveness. The small body of empirical research has been growing but conclusive outcomes are rare. This investigation has focused on the factors of executive coaching that contribute to its effectiveness with the perceptions of both executives and coaches being sought. Six major themes were identified, each comprising a collection of meanings. The findings of this study add value to the field by identifying factors contributing to coaching effectiveness, and providing for the coaching practitioner a basis for enhancing their practice of executive coaching.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background--The admission and assessment of patients for elective procedures is a task faced by all healthcare organisations that provide elective surgical services. Several different strategies have been used to facilitate the management of these tasks. Nurse-led preadmission clinics or services have been implemented in many health services as one of these management strategies; however their effectiveness has not been established. Objectives--The objective of this review was to examine the available research on the effectiveness of nurse-led elective surgery preoperative assessment clinics or services on patient outcomes.--Results--Of the 19 included articles, there were 10 audits of patient and hospital data, 3 surveys or questionnaires, 3 descriptive studies, 1 action research design, 1 prospective observational study and 1 RCT. Five of ten studies reporting data on cancellations rates found that nurse-led preadmission services reduced the number of day-of-surgery cancellations. Non-attendance for surgery was also reduced, with nine studies reporting decreases in the number of patients failing to attend. Eight studies reporting data on patient or parent satisfaction found high levels of satisfaction with nurse-led preadmission services. Three of four studies investigating the effect of the nurse-led preadmission service on patient anxiety found a reduction in reported anxiety levels. Three studies found that preoperative preparation was enhanced by the use of a nurse-led preadmission service.--Conclusions--While all included studies reported evidence of effectiveness for nurse-led preadmission services on a wide range of outcomes for elective surgery patients, the lack of experimental trials means that the level of evidence is low, and further research is needed.--Implications for practice--Nurse-led preadmission services may be an effective strategy for reducing procedural cancellations, failure to attend for procedures, and patient anxiety, however currently the evidence level is low.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents the results of a pilot study examining the factors that impact most on the effective implementation of, and improvement to, Quality Mangement Sytems (QMSs) amongst Indonesian construction companies. Nine critical factors were identified from an extensive literature review, and a survey was conducted of 23 respondents from three specific groups (Quality Managers, Project Managers, and Site Engineers) undertaking work in the Indonesian infrastructure construction sector. The data has been analyzed initially using simple descriptive techniques. This study reveals that different groups within the sector have different opinions of the factors regardless of the degree of importance of each factor. However, the evaluation of construction project success and the incentive schemes for high performance staff, are the two factors that were considered very important by most of the respondents in all three groups. In terms of their assessment of tools for measuring contractor’s performance, additional QMS guidelines, techniques related to QMS practice provided by the Government, and benchmarking, a clear majority in each group regarded their usefulness as ‘of some importance’.