994 resultados para Maintenance Engineering
Resumo:
Mode of access: Internet.
Resumo:
Preventive maintenance actions over the warranty period have an impact on the warranty servicing cost to the manufacturer and the cost to the buyer of fixing failures over the life of the product after the warranty expires. However, preventive maintenance costs money and is worthwhile only when these costs exceed the reduction in other costs. The paper deals with a model to determine when preventive maintenance actions (which rejuvenate the unit) carried out at discrete time instants over the warranty period are worthwhile. The cost of preventive maintenance is borne by the buyer. (C) 2003 Elsevier Ltd. All rights reserved.
Resumo:
For leased equipment the lessor incurs penalty costs for failures occurring over the lease period and for not rectifying such failures within a specified time limit. Through preventive maintenance actions the penalty costs can be reduced but this is achieved at the expense of increased maintenance costs. The paper looks at a periodic preventive maintenance policy which achieves a tradeoff between the penalty and maintenance costs. (c) 2005 Elsevier Ltd. All rights reserved.
Resumo:
For leased equipment, the lessor carries out the maintenance of the equipment. Usually, the contract of lease specifies the penalty for equipment failures and for repairs not being carried out within specified time limits. This implies that optimal preventive maintenance policies must take these penalty costs into account and properly traded against the cost of preventive maintenance actions. The costs associated with failures are high as unplanned corrective maintenance actions are costly and the resulting penalties due to lease contract terms being violated. The paper develops a model to determine the optimal parameters of a preventive maintenance policy that takes into account all these costs to minimize the total expected cost to the lessor for new item lease. The parameters of the policy are (i) the number of preventive maintenance actions to be carried out over the lease period, (ii) the time instants for such actions, and (iii) the level of action. (c) 2005 Elsevier B.V. All rights reserved.
Resumo:
Many maintenance managers find it difficult to justify investments in maintenance improvement initiatives. In part, this is due to a tendency by mine managers to regard maintenance purely as a cost centre, and not as a process able to influence productive capacity and profit. It is also hindered by a lack of alignment between commonly used maintenance performance measures and key business drivers, and the lack of formal business training amongst maintenance professionals. With this in mind, a model to assist maintenance managers in evaluating the benefits of maintenance improvement projects was recently formulated. The model considers four cost saving dimensions. These are: 1. reduction in the cost of unplanned repairs and maintenance, 2. increased or accelerated production and/or sales, 3. spares inventory reduction, and 4. reduction in over-investment in physical assets and operating costs. This paper discusses the application of this model and a number of numerical examples are given to justify investments in maintenance improvement projects having varying objectives.
Resumo:
The following topics are dealt with: Requirements engineering; components; design; formal specification analysis; education; model checking; human computer interaction; software design and architecture; formal methods and components; software maintenance; software process; formal methods and design; server-based applications; review and testing; measurement; documentation; management and knowledge-based approaches.
Resumo:
The existing method of pipeline health monitoring, which requires an entire pipeline to be inspected periodically, is unproductive. A risk-based decision support system (DSS) that reduces the amount of time spent on inspection has been presented. The risk-based DSS uses the analytic hierarchy process (AHP), a multiple attribute decision-making technique, to identify the factors that influence failure on specific segments and analyzes their effects by determining probability of occurrence of these risk factors. The severity of failure is determined through consequence analysis. From this, the effect of a failure caused by each risk factor can be established in terms of cost and the cumulative effect of failure is determined through probability analysis. The model optimizes the cost of pipeline operations by reducing subjectivity in selecting a specific inspection method, identifying and prioritizing the right pipeline segment for inspection and maintenance, deriving budget allocation, providing guidance to deploy the right mix labor for inspection and maintenance, planning emergency preparation, and deriving logical insurance plan. The proposed methodology also helps derive inspection and maintenance policy for the entire pipeline system, suggest design, operational philosophy, and construction methodology for new pipelines.
Resumo:
There is a great deal of literature about the initial stages of innovative design. This is the process whereby a completely new product is conceived, invented and developed. In industry, however, the continuing success of a company is more often achieved by improving or developing existing designs to maintain their marketability. Unfortunately, this process of design by evolution is less well documented. This thesis reports the way in which this process was improved for the sponsoring company. The improvements were achieved by implementing a new form of computer aided design (C.A.D.) system. The advent of this system enabled the company to both shorten the design and development time and also to review the principles underlying the existing design procedures. C.A.D. was a new venture for the company and care had to be taken to ensure that the new procedures were compatible with the existing design office environment. In particular, they had to be acceptable to the design office staff. The C.A.D. system produced guides the designer from the draft specification to the first prototype layout. The computer presents the consequences of the designer's decisions clearly and fully, often by producing charts and sketches. The C.A.D. system and the necessary peripheral facilities were implemented, monitored and maintained. The system structure was left sufficiently flexible for maintenance to be undertaken quickly and effectively. The problems encountered during implementation are well documented in this thesis.