918 resultados para Hole-board
Resumo:
Agency Performance Plan
Resumo:
Annual Report, Agency Performance Plan
Resumo:
Annual Report, Agency Performance Plan
Resumo:
Annual report for the Iowa Utilities Board
Resumo:
The sparsely spaced highly permeable fractures of the granitic rock aquifer at Stang-er-Brune (Brittany, France) form a well-connected fracture network of high permeability but unknown geometry. Previous work based on optical and acoustic logging together with single-hole and cross-hole flowmeter data acquired in 3 neighbouring boreholes (70-100 m deep) has identified the most important permeable fractures crossing the boreholes and their hydraulic connections. To constrain possible flow paths by estimating the geometries of known and previously unknown fractures, we have acquired, processed and interpreted multifold, single- and cross-hole GPR data using 100 and 250 MHz antennas. The GPR data processing scheme consisting of timezero corrections, scaling, bandpass filtering and F-X deconvolution, eigenvector filtering, muting, pre-stack Kirchhoff depth migration and stacking was used to differentiate fluid-filled fracture reflections from source generated noise. The final stacked and pre-stack depth-migrated GPR sections provide high-resolution images of individual fractures (dipping 30-90°) in the surroundings (2-20 m for the 100 MHz antennas; 2-12 m for the 250 MHz antennas) of each borehole in a 2D plane projection that are of superior quality to those obtained from single-offset sections. Most fractures previously identified from hydraulic testing can be correlated to reflections in the single-hole data. Several previously unknown major near vertical fractures have also been identified away from the boreholes.
Resumo:
Annual report for the Board of Nursing.
Resumo:
Report for the Iowa Utilities Board
Resumo:
Annual Report for Board of Nursing
Resumo:
Annual report for Iowa Utilities Board
Resumo:
Annual report for Iowa Utilities Board
Resumo:
Annual report for Iowa Utilities Board
Resumo:
Annual report for Iowa Utilities Board
Resumo:
Report for Iowa Utilities Board
Resumo:
Right from the beginning of the development of the medical specialty of Physical and Rehabilitation Medicine (PRM) the harmonization of the fields of competence and the specialist training across Europe was always an important issue. The initially informal European collaboration was formalized in 1963 under the umbrella of the European Federation of PRM. The European Academy of PRM and the UEMS section of PRM started to contribute in 1969 and 1974 respectively. In 1991 the European Board of Physical and Rehabilitation Medicine (EBPRM) was founded with the specific task of harmonizing education and training in PRM in Europe. The EBPRM has progressively defined curricula for the teaching of medical students and for the postgraduate education and training of PRM specialists. It also created a harmonized European certification system for medical PRM specialists, PRM trainers and PRM training sites. European teaching initiatives for PRM trainees (European PRM Schools) were promoted and learning material for PRM trainees and PRM specialists (e-learning, books and e-books, etc.) was created. For the future the Board will have to ensure that a minimal specific undergraduate curriculum on PRM based on a detailed European catalogue of learning objectives will be taught in all medical schools in Europe as a basis for the general medical practice. To stimulate the harmonization of national curricula, the existing postgraduate curriculum will be expanded by a syllabus of competencies related to PRM and a catalogue of learning objectives to be reached by all European PRM trainees. The integration of the certifying examination of the PRM Board into the national assessment procedures for PRM specialists will also have to be promoted.