993 resultados para Gemstone Team BALANCE


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fatigue and overwork are problems experienced by numerous employees in many industry sectors. Focusing on improving work-life balance can frame the ‘problem’ of long work hours to resolve working time duration issues. Flexible work options through re-organising working time arrangements is key to developing an organisational response for delivering work-life balance and usually involves changing the internal structure of work time. This study examines the effect of compressed long weekly working hours and the consequent ‘long break’ on work-life balance. Using Spillover theory and Border theory, this research considers organisational and personal determinants of overwork and fatigue. It concludes compressed long work hours with a long break provide better work-life balance. Further, a long break allows gaining ‘personal time’ and overcoming fatigue.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Communication is one team process factor that has received considerable research attention in the team literature. This literature provides equivocal evidence regarding the role of communication in team performance and yet, does not provide any evidence for when communication becomes important for team performance. This research program sought to address this evidence gap by a) testing task complexity and team member diversity (race diversity, gender diversity and work value diversity) as moderators of the team communication — performance relationship; and b) testing a team communication — performance model using established teams across two different task types. The functional perspective was used as the theoretical framework for operationalizing team communication activity. The research program utilised a quasi-experimental research design with participants from a large multi-national information technology company whose Head Office was based in Sydney, Australia. Participants voluntarily completed two team building exercises (a decision making and production task), and completed two online questionnaires. In total, data were collected from 1039 individuals who constituted 203 work teams. Analysis of the data revealed a small number of significant moderation effects, not all in the expected direction. However, an interesting and unexpected finding also emerged from Study One. Large and significant correlations between communication activity ratings were found across tasks, but not within tasks. This finding suggested that teams were displaying very similar profiles of communication on each task, despite the tasks having different communication requirements. Given this finding, Study Two sought to a) determine the relative importance of task versus team effects in explaining variance in team communication measures for established teams; b) determine if established teams had reliable and discernable team communication profiles and if so, c) investigate whether team communication profiles related to task performance. Multi-level modeling and repeated measures analysis of variance (ANOVA) revealed that task type did not have an effect on team communication ratings. However, teams accounted for 24% of the total variance in communication measures. Through cluster analysis, five reliable and distinct team communication profiles were identified. Consistent with the findings of the multi-level analysis and repeated measures ANOVA, teams’ profiles were virtually identical across the decision making and production tasks. A relationship between communication profile and performance was identified for the production task, although not for the decision making task. This research responds to calls in the literature for a better understanding of when communication becomes important for team performance. The moderators tested in this research were not found to have a substantive or reliable effect on the relationship between communication and performance. However, the consistency in team communication activity suggests that established teams can be characterized by their communication profiles and further, that these communication profiles may have implications for team performance. The findings of this research provide theoretical support for the functional perspective in terms of the communication – performance relationship and further support the team development literature as an explanation for the stability in team communication profiles. This research can also assist organizations to better understand the specific types of communication activity and profiles of communication that could offer teams a performance advantage.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study was aimed at examining the safety climate and relational conflict within teams at the individual level. A sample of 372 respondents, divided into 50 teams, was used to test our hypothesis. It was proposed - and discovered - that team members’ individual differences in need for closure mitigated the negative relationship between perceptions of team safety climate and team relational conflict. The implications of our findings and the study’s limitations are discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sponsorship is increasingly important in a firm's communication mix. Research to date has focused on the impact of sponsorship on brand awareness and its subsequent consequences for image congruency and consumer attitudes towards sponsors' brands. A lesser studied area is the effect of sponsorship on consumers' purchase intentions and behaviours. We argue that existing models of sponsorship driven purchase behaviour fail to account for affective commitment, which mediates relationship between affiliation with the team and social identification with the team. We propose a modified framework describing the effect of sponsorship on purchase intentions in the context of low and high performing sports teams. The framework is tested using structural equations modelling; employing PLS estimation and data collected via online survey of AFL chat room participants. Results confirm the role of affective commitment in sport sponsorship purchase intentions and indicate that team success has a significant influence on fans' purchase behaviours.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Small non-profit organisations play a vital role in the creation of social capital and resilience of civil society in Australia. A number of government inquiries have recently been commissioned to propose reform to non-profit enterprise and it is timely to examine the suitability of legal structures available for small non-profit organisations. This article reviews the characteristics of small Australian non-profit organisations and the legal treatment of similar associations in New Zealand, the United Kingdom, Europe, Canada and United States to inform possible reform strategies. Reforms are then proposed for small Australian unincorporated organisations which allow them access to the benefits of separate legal entity status, but with regulation proportionate to the risks posed to the broader community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Principal Topic: Project structures are often created by entrepreneurs and large corporate organizations to develop new products. Since new product development projects (NPDP) are more often situated within a larger organization, intrapreneurship or corporate entrepreneurship plays an important role in bringing these projects to fruition. Since NPDP often involves the development of a new product using immature technology, we describe development of an immature technology. The Joint Strike Fighter (JSF) F-35 aircraft is being developed by the U.S. Department of Defense and eight allied nations. In 2001 Lockheed Martin won a $19 billion contract to develop an affordable, stealthy and supersonic all-weather strike fighter designed to replace a wide range of aging fighter aircraft. In this research we define a complex project as one that demonstrates a number of sources of uncertainty to a degree, or level of severity, that makes it extremely difficult to predict project outcomes, to control or manage project (Remington & Zolin, Forthcoming). Project complexity has been conceptualized by Remington and Pollock (2007) in terms of four major sources of complexity; temporal, directional, structural and technological complexity (See Figure 1). Temporal complexity exists when projects experience significant environmental change outside the direct influence or control of the project. The Global Economic Crisis of 2008 - 2009 is a good example of the type of environmental change that can make a project complex as, for example in the JSF project, where project managers attempt to respond to changes in interest rates, international currency exchange rates and commodity prices etc. Directional complexity exists in a project where stakeholders' goals are unclear or undefined, where progress is hindered by unknown political agendas, or where stakeholders disagree or misunderstand project goals. In the JSF project all the services and all non countries have to agree to the specifications of the three variants of the aircraft; Conventional Take Off and Landing (CTOL), Short Take Off/Vertical Landing (STOVL) and the Carrier Variant (CV). Because the Navy requires a plane that can take off and land on an aircraft carrier, that required a special variant of the aircraft design, adding complexity to the project. Technical complexity occurs in a project using technology that is immature or where design characteristics are unknown or untried. Developing a plane that can take off on a very short runway and land vertically created may highly interdependent technological challenges to correctly locate, direct and balance the lift fans, modulate the airflow and provide equivalent amount of thrust from the downward vectored rear exhaust to lift the aircraft and at the same time control engine temperatures. These technological challenges make costing and scheduling equally challenging. Structural complexity in a project comes from the sheer numbers of elements such as the number of people, teams or organizations involved, ambiguity regarding the elements, and the massive degree of interconnectedness between them. While Lockheed Martin is the prime contractor, they are assisted in major aspects of the JSF development by Northrop Grumman, BAE Systems, Pratt & Whitney and GE/Rolls-Royce Fighter Engineer Team and innumerable subcontractors. In addition to identifying opportunities to achieve project goals, complex projects also need to identify and exploit opportunities to increase agility in response to changing stakeholder demands or to reduce project risks. Complexity Leadership Theory contends that in complex environments adaptive and enabling leadership are needed (Uhl-Bien, Marion and McKelvey, 2007). Adaptive leadership facilitates creativity, learning and adaptability, while enabling leadership handles the conflicts that inevitably arise between adaptive leadership and traditional administrative leadership (Uhl-Bien and Marion, 2007). Hence, adaptive leadership involves the recognition and opportunities to adapt, while and enabling leadership involves the exploitation of these opportunities. Our research questions revolve around the type or source of complexity and its relationship to opportunity recognition and exploitation. For example, is it only external environmental complexity that creates the need for the entrepreneurial behaviours, such as opportunity recognition and opportunity exploitation? Do the internal dimensions of project complexity, such as technological and structural complexity, also create the need for opportunity recognition and opportunity exploitation? The Kropp, Zolin and Lindsay model (2009) describes a relationship between entrepreneurial orientation (EO), opportunity recognition (OR), and opportunity exploitation (OX) in complex projects, with environmental and organizational contextual variables as moderators. We extend their model by defining the affects of external complexity and internal complexity on OR and OX. ---------- Methodology/Key Propositions: When the environment complex EO is more likely to result in OR because project members will be actively looking for solutions to problems created by environmental change. But in projects that are technologically or structurally complex project leaders and members may try to make the minimum changes possible to reduce the risk of creating new problems due to delays or schedule changes. In projects with environmental or technological complexity project leaders who encourage the innovativeness dimension of EO will increase OR in complex projects. But projects with technical or structural complexity innovativeness will not necessarily result in the recognition and exploitation of opportunities due to the over-riding importance of maintaining stability in the highly intricate and interconnected project structure. We propose that in projects with environmental complexity creating the need for change and innovation project leaders, who are willing to accept and manage risk, are more likely to identify opportunities to increase project effectiveness and efficiency. In contrast in projects with internal complexity a much higher willingness to accept risk will be necessary to trigger opportunity recognition. In structurally complex projects we predict it will be less likely to find a relationship between risk taking and OP. When the environment is complex, and a project has autonomy, they will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. When a project experiences high competitive aggressiveness and their environment is complex, project leaders will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. This paper reports the first stage of a three year study into the behaviours of managers, leaders and team members of complex projects. We conduct a qualitative study involving a Group Discussion with experienced project leaders. The objective is to determine how leaders of large and potentially complex projects perceive that external and internal complexity will influence the affects of EO on OR. ---------- Results and Implications: These results will help identify and distinguish the impact of external and internal complexity on entrepreneurial behaviours in NPDP. Project managers will be better able to quickly decide how and when to respond to changes in the environment and internal project events.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

DMAPS (Distributed Multi-Agent Planning System) is a planning system developed for distributed multi-robot teams based on MAPS (Multi-Agent Planning System). MAPS assumes that each agent has the same global view of the environment in order to determine the most suitable actions. This assumption fails when perception is local to the agents: each agent has only a partial and unique view of the environment. DMAPS addresses this problem by creating a probabilistic global view on each agent by fusing the perceptual information from each robot. The experimental results on consuming tasks show that while the probabilistic global view is not identical on each robot, the shared view is still effective in increasing performance of the team.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes the real time global vision system for the robot soccer team the RoboRoos. It has a highly optimised pipeline that includes thresholding, segmenting, colour normalising, object recognition and perspective and lens correction. It has a fast ‘paint’ colour calibration system that can calibrate in any face of the YUV or HSI cube. It also autonomously selects both an appropriate camera gain and colour gains robot regions across the field to achieve colour uniformity. Camera geometry calibration is performed automatically from selection of keypoints on the field. The system achieves a position accuracy of better than 15mm over a 4m × 5.5m field, and orientation accuracy to within 1°. It processes 614 × 480 pixels at 60Hz on a 2.0GHz Pentium 4 microprocessor.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes an application of decoupled probabilistic world modeling to achieve team planning. The research is based on the principle that the action selection mechanism of a member in a robot team can select an effective action if a global world model is available to all team members. In the real world, the sensors are imprecise, and are individual to each robot, hence providing each robot a partial and unique view about the environment. We address this problem by creating a probabilistic global view on each agent by combining the perceptual information from each robot. This probabilistic view forms the basis for selecting actions to achieve the team goal in a dynamic environment. Experiments have been carried out to investigate the effectiveness of this principle using custom-built robots for real world performance, in addition, to extensive simulation results. The results show an improvement in team effectiveness when using probabilistic world modeling based on perception sharing for team planning.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objective: To assess the effect of graded increases in exercised-induced energy expenditure (EE) on appetite, energy intake (EI), total daily EE and body weight in men living in their normal environment and consuming their usual diets. Design: Within-subject, repeated measures design. Six men (mean (s.d.) age 31.0 (5.0) y; weight 75.1 (15.96) kg; height 1.79 (0.10) m; body mass index (BMI) 23.3(2.4) kg/m2), were each studied three times during a 9 day protocol, corresponding to prescriptions of no exercise, (control) (Nex; 0 MJ/day), medium exercise level (Mex; ~1.6 MJ/day) and high exercise level (Hex; ~3.2 MJ/day). On days 1-2 subjects were given a medium fat (MF) maintenance diet (1.6 ´ resting metabolic rate (RMR)). Measurements: On days 3-9 subjects self-recorded dietary intake using a food diary and self-weighed intake. EE was assessed by continual heart rate monitoring, using the modified FLEX method. Subjects' HR (heart rate) was individually calibrated against submaximal VO2 during incremental exercise tests at the beginning and end of each 9 day study period. Respiratory exchange was measured by indirect calorimetry. Subjects completed hourly hunger ratings during waking hours to record subjective sensations of hunger and appetite. Body weight was measured daily. Results: EE amounted to 11.7, 12.9 and 16.8 MJ/day (F(2,10)=48.26; P<0.001 (s.e.d=0.55)) on the Nex, Mex and Hex treatments, respectively. The corresponding values for EI were 11.6, 11.8 and 11.8 MJ/day (F(2,10)=0.10; P=0.910 (s.e.d.=0.10)), respectively. There were no treatment effects on hunger, appetite or body weight, but there was evidence of weight loss on the Hex treatment. Conclusion: Increasing EE did not lead to compensation of EI over 7 days. However, total daily EE tended to decrease over time on the two exercise treatments. Lean men appear able to tolerate a considerable negative energy balance, induced by exercise, over 7 days without invoking compensatory increases in EI.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This book disseminates current information pertaining to the modulatory effects of foods and other food substances on behavior and neurological pathways and, importantly, vice versa. This ranges from the neuroendocrine control of eating to the effects of life-threatening disease on eating behavior. The importance of this contribution to the scientific literature lies in the fact that food and eating are an essential component of cultural heritage but the effects of perturbations in the food/cognitive axis can be profound. The complex interrelationship between neuropsychological processing, diet, and behavioral outcome is explored within the context of the most contemporary psychobiological research in the area. This comprehensive psychobiology- and pathology-themed text examines the broad spectrum of diet, behavioral, and neuropsychological interactions from normative function to occurrences of severe and enduring psychopathological processes

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Given the present worldwide epidemic of obesity, it is pertinent to ask how effective exercise could be in helping people to lose weight or to prevent weight gain. There is a widely held belief that exercise is futile for weight reduction because any energy expended in exercise is automatically compensated for by a corresponding increase in energy intake (EI). In other words, exercise elevates the intensity of hunger and drives food consumption. This “commonsense” view appears to originate in an energy-balance model of appetite control, which stipulates that energy expended will drive EI as a consequence of the regulation of energy balance. However, it is very clear that EI (food consumption or eating) is not just a biological matter. Eating does not occur solely to rectify some internal need state. Indeed, an examination of the relation between exercise and appetite control has shown a very weak coupling; most studies have demonstrated that food intake does not immediately rise after exercise, even after very high energy expenditure (EE).[1] The processes of exercise-induced EE and food consumption do not appear to be tightly linked. After exercise, there is only slow and partial compensation for the energy expended. Therefore, exercise can be very useful in helping to bring about weight loss and is even more important in preventing weight gain or weight regain. This editorial explores this issue.