915 resultados para Credit constraints


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This work addresses the present-day (<100 ka) mantle heterogeneity in the Azores region through the study of two active volcanic systems from Terceira Island. Our study shows that mantle heterogeneities are detectable even when "coeval" volcanic systems (Santa Barbara and Fissural) erupted less than 10 km away. These volcanic systems, respectively, reflect the influence of the Terceira and D. Joao de Castro Bank end-members defined by Beier et at (2008) for the Terceira Rift Santa Barbara magmas are interpreted to be the result of mixing between a HIMU-type component, carried to the upper mantle by the Azores plume, and the regional depleted MORB magmas/source. Fissural lavas are characterized by higher Ba/Nb and Nb/U ratios and less radiogenic Pb-206/Pb-204, Nd-143/Nd-144 and Hf-176/Hf-177, requiring the small contribution of delaminated sub-continental lithospheric mantle residing in the upper mantle. Published noble gas data on lavas from both volcanic systems also indicate the presence of a relatively undegassed component, which is interpreted as inherited from a lower mantle reservoir sampled by the ascending Azores plume. As inferred from trace and major elements, melting began in the garnet stability field, while magma extraction occurred within the spinel zone. The intra-volcanic system's chemical heterogeneity is mainly explained by variable proportions of the above-mentioned local end-members and by crystal fractionation processes. (C) 2011 Elsevier By. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Energy resource scheduling becomes increasingly important, as the use of distributed resources is intensified and massive gridable vehicle use is envisaged. The present paper proposes a methodology for dayahead energy resource scheduling for smart grids considering the intensive use of distributed generation and of gridable vehicles, usually referred as Vehicle- o-Grid (V2G). This method considers that the energy resources are managed by a Virtual Power Player (VPP) which established contracts with V2G owners. It takes into account these contracts, the user´s requirements subjected to the VPP, and several discharge price steps. Full AC power flow calculation included in the model allows taking into account network constraints. The influence of the successive day requirements on the day-ahead optimal solution is discussed and considered in the proposed model. A case study with a 33 bus distribution network and V2G is used to illustrate the good performance of the proposed method.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mathematical Program with Complementarity Constraints (MPCC) finds applica- tion in many fields. As the complementarity constraints fail the standard Linear In- dependence Constraint Qualification (LICQ) or the Mangasarian-Fromovitz constraint qualification (MFCQ), at any feasible point, the nonlinear programming theory may not be directly applied to MPCC. However, the MPCC can be reformulated as NLP problem and solved by nonlinear programming techniques. One of them, the Inexact Restoration (IR) approach, performs two independent phases in each iteration - the feasibility and the optimality phases. This work presents two versions of an IR algorithm to solve MPCC. In the feasibility phase two strategies were implemented, depending on the constraints features. One gives more importance to the complementarity constraints, while the other considers the priority of equality and inequality constraints neglecting the complementarity ones. The optimality phase uses the same approach for both algorithm versions. The algorithms were implemented in MATLAB and the test problems are from MACMPEC collection.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

On this paper we present a modified regularization scheme for Mathematical Programs with Complementarity Constraints. In the regularized formulations the complementarity condition is replaced by a constraint involving a positive parameter that can be decreased to zero. In our approach both the complementarity condition and the nonnegativity constraints are relaxed. An iterative algorithm is implemented in MATLAB language and a set of AMPL problems from MacMPEC database were tested.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Consider the problem of scheduling sporadic tasks on a multiprocessor platform under mutual exclusion constraints. We present an approach which appears promising for allowing large amounts of parallel task executions and still ensures low amounts of blocking.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is an increasing demand for highly dynamic realtime systems where several independently developed applications with different timing requirements can coexist. This paper proposes a protocol to integrate shared resources and precedence constraints among tasks in such systems assuming no precise information on critical sections and computation times is available. The concept of bandwidth inheritance is combined with a capacity sharing and stealing mechanism to efficiently exchange bandwidth among needed tasks, minimising the cost of blocking.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper proposes a new strategy to integrate shared resources and precedence constraints among real-time tasks, assuming no precise information on critical sections and computation times is available. The concept of bandwidth inheritance is combined with a greedy capacity sharing and stealing policy to efficiently exchange bandwidth among tasks, minimising the degree of deviation from the ideal system's behaviour caused by inter-application blocking. The proposed capacity exchange protocol (CXP) focus on exchanging extra capacities as early, and not necessarily as fairly, as possible. This loss of optimality is worth the reduced complexity as the protocol's behaviour nevertheless tends to be fair in the long run and outperforms other solutions in highly dynamic scenarios, as demonstrated by extensive simulations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this paper is to discuss the linear solution of equality constrained problems by using the Frontal solution method without explicit assembling. Design/methodology/approach - Re-written frontal solution method with a priori pivot and front sequence. OpenMP parallelization, nearly linear (in elimination and substitution) up to 40 threads. Constraints enforced at the local assembling stage. Findings - When compared with both standard sparse solvers and classical frontal implementations, memory requirements and code size are significantly reduced. Research limitations/implications - Large, non-linear problems with constraints typically make use of the Newton method with Lagrange multipliers. In the context of the solution of problems with large number of constraints, the matrix transformation methods (MTM) are often more cost-effective. The paper presents a complete solution, with topological ordering, for this problem. Practical implications - A complete software package in Fortran 2003 is described. Examples of clique-based problems are shown with large systems solved in core. Social implications - More realistic non-linear problems can be solved with this Frontal code at the core of the Newton method. Originality/value - Use of topological ordering of constraints. A-priori pivot and front sequences. No need for symbolic assembling. Constraints treated at the core of the Frontal solver. Use of OpenMP in the main Frontal loop, now quantified. Availability of Software.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Basel III will have a significant impact on the European banking sector. In September 2010, supervisors of various countries adopted the new rules proposed by the prudential Committee on Banking Supervision to be applied to the business of credit institutions (hereinafter called ICs) in a phased manner from 2013, assuming to its full implementation by 2019. The purpose of this new regulation is to limit the excessive risk that these institutions took on the period preceding the global financial crisis of 2008. This new regulation is known in slang by Basel III. Depending on the requirement of Basel II for banks and their supervisors to assess the soundness and adequacy of internal risk measurement and credit management systems, the development of methodologies for the validation of internal and external evaluation systems is clearly an important issue . More specifically, there is a need to develop tools to validate the systems used to generate the parameters (such as PD, LGD, EAD and ratings of perceived risk) that serve as starting points for the IRB approach for credit risk. In this context, the work is composed of a number of approaches and tools used to evaluate the robustness of these elements IRB systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada como requisito parcial de obtenção do grau de Mestre em Estatística e Gestão de Informação

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper appears in International Journal of Projectics. Vol 4(1), pp. 39-49

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cretaceous Research 30 (2009) 575–586

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Despite the relevance of trade credit as a source of business financing, the topic is far from being considered exhausted, especially because there is no general and integrated theory explaining the causes and consequences of trade credit.Our research aims to contribute towards the literature that studies the determinants for granting and receiving trade credit. In this sequence, the present study seeks to empirically test some theories about the reasons why companies grant and receive commercial credit. For this purpose we apply a fixed effect model to a panel of 11 040 Portuguese industrial companies, of which 360 are large companies and the majority 10 680 are Small and Medium Enterprises (SME) for the period between 2003 and 2009. We conclude that large companies (with greater access to credit market) serve as financial intermediaries to their clients with less access to finance. In addition, it was observed that the supplier companies use trade credit as a legal means of price discrimination. Finally, financially constrained enterprises, especially in times of financial crisis, use commercial credit as an alternative source of funding, endorsing the hypothesis of substitution between trade credit and bank credit.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper is on the self-scheduling problem for a thermal power producer taking part in a pool-based electricity market as a price-taker, having bilateral contracts and emission-constrained. An approach based on stochastic mixed-integer linear programming approach is proposed for solving the self-scheduling problem. Uncertainty regarding electricity price is considered through a set of scenarios computed by simulation and scenario-reduction. Thermal units are modelled by variable costs, start-up costs and technical operating constraints, such as: forbidden operating zones, ramp up/down limits and minimum up/down time limits. A requirement on emission allowances to mitigate carbon footprint is modelled by a stochastic constraint. Supply functions for different emission allowance levels are accessed in order to establish the optimal bidding strategy. A case study is presented to illustrate the usefulness and the proficiency of the proposed approach in supporting biding strategies. (C) 2014 Elsevier Ltd. All rights reserved.