215 resultados para CEDAR
Resumo:
On June 9, 2009, the Northeast Iowa Highway 150/52 Coalition met with the Iowa Department of Transportation (Iowa DOT) in Cedar Falls, Iowa to discuss concerns regarding roadway conditions and safety which has become a concern because of the potential economic development in the area. In response to the issues raised by the coalition, the Iowa DOT requested that a road safety audit be conducted on the corridor to identify where low-cost improvements could be beneficially applied to address safety concerns.
Resumo:
To address safety concerns on James Avenue NW and 250th Street NW, from the North Corporate Limits (NCL) of Tiffin, north and east to I-380 (at North Liberty), the Johnson County engineer requested a road safety audit (RSA). The audit was conducted on September 1, 2010, through a program supported by the Office of Traffic and Safety at the Iowa Department of Transportation (DOT). This road is a seal-coated roadway, about 25-ft wide, but with only about 0-1 ft of earth shoulders. According to 2006 Iowa DOT estimates, traffic volume is about 820 vehicles per day, north from Tiffin to a commercial entrance on 250th Street, then increasing to 2,990 vehicles per day to the on-ramp of Interstate 380 (I-380). Local traffic uses this road as a short-cut to Cedar Rapids, North Liberty, and the I-380/I-80 interchange (to avoid congestion on IA 965). This report outlines the findings and recommendations of the road safety audit team for addressing the safety concerns on this roadway.
Resumo:
The focus of this project is "Indian Creek", a tributary to Cedar Creek which eventually empties into the Lower Skunk River. Indian Creek suffers from deteriorated water quality resulting from high volumes of urban stormwater runoff resulting in streambank erosion, combined sewer overflows and chemical and floatable litter pollution from roadways. The "Creative Solution for Indian Creek Water Quality" project will work with a local commercial business to create a model urban project The project will reduce the volume of urban stormwater by 930,000 gallons annually entering Indian Creek as well as reduce the volume of discharge water by 500,000 gallons annually. The local business will develop a system to divert stormwater from l acre of their roof as well as coolant discharge water from their factory into an existing retention pond. In addition, the project will reduce demand on the municipal water supply by 500,000 gallons annually by harvesting water from the retention pond for cooling operations.
Resumo:
The Competine Creek watershed is a 24,956 acre sub-watershed of Cedar Creek. The creek traverses portions of three counties, slicing through rich and highly productive Southern lowa Drift Plain soils. The watershed is suffering from excessive sediment delivery and frequent flash floods that have been exacerbated by recent high rainfall events. Assessment data reveals soil erosion estimated to be 38,435 tons/year and sediment delivery to the creek at 15,847 tons/year. The Competine Creek Partnership Project is seeking WIRB funds to merge with IDALS-DSC funds and local funds, all targeted for structural Best Management Practices (BMPs) within the 2,760 acres of High Priority Areas (HPAs) identified by the assessment process. The BMPs will include grade stabilization structures, water and sediment basins, tile-outlet terraces, CRP, and urban storm water conservation practices. In addition, Iowa State University Extension-Iowa Learning Farm is investing in the project by facilitating a crop sampling program utilizing fall stalk nitrate, phosphorous index, and soil conditioning index testing. These tests will be used by producers as measures of performance to refine nutrient and soil loss management and to determine effective alternatives to reduce sediment and nutrient delivery to Competine Creek.
Resumo:
The Mitchell County Soil and Water Conservation District is applying on behalf of the incorporated community of Carpenter to construct a wastewater collection and treatment system to assist in the environmental cleanup and protection of Deer Creek. IDNR water monitoring of the community tile line has shown consistently elevated levels of fecal coliform bacteria indicating the presence of untreated sewage water. These are obvious health threats to the downstream users and wildlife in Deer Creek and the Cedar River. A new sewer system for the community of Carpenter will eliminate illegal discharges into the creed and be the first step in the overall protection of the stream.
Resumo:
Lime Creek is a sub-watershed of the Cedar River above; approximately 25 miles from Cedar Rapids. The lower half of the stream is on the Iowa 2004 Section 303(d) impaired waters list. Monitoring by the Cedar River Watershed Monitoring Coalition documents that Lime Creek delivers above average amounts of nitrate+ nitrite-N, ammonia-Nand total phosphorus (above the 901 percentile) compared to other Cedar River sub-watersheds. The Cedar Rapids water utility is concerned about increasing delivery of nitrate+nitrate to the Cedar River, which provides drinking water for about 125,000 people in the area. A group of local citizens has formed the Lime Creek watershed council with the goal of reducing pollutant delivery to the creek and promoting sustainable, watershed-wide action by producers, urban and rural residents for improved environmental management. The council has established a performance-based program that rewards cooperators for improvement in research-based test and index scores which directly measure environmental impact of BMPs. The Iowa Com Growers Association is funding the performance rewards. The Watershed Coalition is contributing in-kind monitoring. Council and performance cooperators participate primarily with commitment of their own resources. WIRB funds will be used to increase program cooperators and for staff support. In addition to improvement of water quality in Lime Creek, the project will establish baseline values for arket-based a pro ch to valuing pollutant reduction by intensive livestock operations in eastern Iowa.
Resumo:
Lower Coldwater and Palmer Creeks in Butler and Floyd counties are subwatersheds of the Cedar River, which provides drinking water to Cedar Rapids, IA. The increasing concentration of nitrate+nitrate in the river is of concern to the Cedar Rapids water utility, and IDNR snapshot monitoring shows Coldwater and Palmer to be significant potential sources (above the 90th percentile for subwatersheds monitored). Both creeks are also on the Iowa Section 303(d) list of impaired waters (aquatic life). Citizens of these predominantly agricultural watersheds organized the Coldwater-Palmer Watershed Improvement Association to deal proactively with nonpoint source pollutants from crop and livestock operations through a performance-based environmental management program. The locally-adapted program implemented by the Coldwater-Palmer watershed council rewards participants for environmental accomplishments - soil quality improvement and nutrient source reduction as measured by accepted, scientifically-based tests and models. Most of the locallyappropriate BMPs used to improve performance are undertaken voluntarily at participants' initiative. WIRB funds will be combined with funding from the Iowa Com Growers Association and significant in-kind support from the Cedar River Watershed Monitoring Coalition, Iowa State University Extension and other partners. The project will result in sustainable reduction in nutrient loading achieved with voluntary participation of a majority of watershed farm operators.
Resumo:
A water quality resource concern has come to the forefront in the Upper Miller Creek watershed in Black Hawk County after five to seven inches of rain fell on the area on May 22nd and 23rd of 2004 and unprecedented amounts of soil and organic debris were washed from cultivated areas, clogging most culverts and roadside ditches. The quantity of soil deposited in ditches gave a good indication of the amounts that were transported into the stream. The estimated total cost to Black Hawk County for cleanup and repair within the road right-of-way was $345,000. There were undetermined environmental costs incurred when the incredibly high volumes of soil washed from the fields into Miller Creek which flows directly into the Cedar River that is identified by the Department of Natural Resources as an impaired water body. The Upper Miller Creek Watershed Project is an innovative, collaborative project intended to meet a specific need identified by a local steering committee made up of concerned community agencies and local landowners. Led by the Soil and Water Conservation District and the Black Hawk County Board of Supervisors, the Miller Creek Watershed Project seeks to reduce soil erosion, improve water quality, and reduce county road infrastructure cost by implementing conservation practices, reducing nutrient and pesticide use and improving wildlife habitat.
Resumo:
Farmers Creek is a moderately flowing stream that winds through seventeen miles of central Jackson County, encompassing a watershed area of 30,590 acres. Due to nutrient loading and sedimentation, the stream was placed on Iowa’s 303(d) List of Impaired Waters in 2002. A three year grant project was initiated in January 2005 to reduce both sediment delivery and phosphorus levels by 40% in critical areas along the stream corridor. Over thirty-five BMP’s were started in the first nine months of this project. Funding through WIRB is being requested specifically for streambank stabilization and protection projects not covered by other cost-share programs. Innovative project designs and techniques will be installed and act as demonstration sites. Projects may include jetties, weirs, cedar revetments, cattle crossings, and fencing. To assist in excluding cattle from the stream, watering systems such as slingpumps, pasture pumps, or water rams will be installed, in conjunction with filter strips and riparian buffers.
Resumo:
Farmers Creek is a moderately flowing stream that winds through seventeen miles of central Jackson County, encompassing a watershed area of 30,590 acres. Due to nutrient loading and sedimentation, the stream was placed on Iowa’s 303(d) List of Impaired Waters in 2002. A three year grant project was initiated in January 2005 to reduce both sediment delivery and phosphorus levels by 40% in critical areas along the stream corridor. Over thirty-five BMP’s were started in the first nine months of this project. Funding through WIRB is being requested specifically for streambank stabilization and protection projects not covered by other cost-share programs. Innovative project designs and techniques will be installed and act as demonstration sites. Projects may include jetties, weirs, cedar revetments, cattle crossings, and fencing. To assist in excluding cattle from the stream, watering systems such as slingpumps, pasture pumps, or water rams will be installed, in conjunction with filter strips and riparian buffers.
Resumo:
This project concept and assessment of impacts includes information on future four-lane construction of U.S. 151 from the existing four-lane section near Cedar Rapids to Dubuque.
Resumo:
The disposal of discarded tires has become a major problem. Different methods of recycling have been researched. Currently, Iowa is researching the use of ground recycled crumb rubber from discarded tires in asphalt rubber cement. Six projects have been completed in Iowa using asphalt rubber cement. This project is located on IA 947 (University Avenue) in Cedar Falls/Waterloo. The project contains one section with asphalt rubber cement used in both the binder and surface courses and one section using asphalt rubber cement in the surface course with a conventional binder. There are two control sections where conventional asphalt pavement was placed.
Resumo:
The Cedar Dale Scythe Works was the second manufacturing company that A.S. Whiting had established in Oshawa, the first being the Oshawa Manufacturing Co. in 1852. The Oshawa Manufacturing Co. was eventually taken over by the Joseph Hall Works in 1857. In 1862, the Cedar Dale Works was built after being in a rented space in the Hall Works for two years, building scythes and hoes. With the building of the firm, the village of Cedar Dale was established. In 1867, the firm became Whiting and Cowan when John Cowan bought into the company. After the death of Whiting in 1867, his son-in-law, R.S. Hamlin headed the company. By 1872, it became the A.S. Whiting Manufacturing Co. when Cowan withdrew from the business. Before Whiting’s death, the company had been profitable but due to new machinery being developed, hand tools were becoming obsolete and the business only lasted for a few more years (source: Oshawa Community Museum and Archives Web site).
Resumo:
Oliver Rising (1775-1855) lived in Herkimer County, New York. He is buried in Cedar Lake Cemetery, Cedar Lake (part of the town of Litchfield) in Herkimer County, with his wife Hannah (1780-1855) and his son Oliver Rising Jr. (1817-1861).
Resumo:
The Niagara Parks Commission administrative headquarters are located in Oak Hall which is on the cliff above Dufferin Islands. In 1798 this land was granted by the crown to United Empire Loyalist James Skinner until 1898. A century later it was the home of the Clarks, Streets and Macklems. These families controlled the mills of Bridgewater which was a pioneer industrial village located at Dufferin Islands. Then, it was known as Clark Hill. Colonel Thomas Clark, commander of the Second Lincoln Militia in the War of 1812 is the earliest known occupant of the house. When Clark died in 1837, the house went to Thomas Clark Street who was the son of the Colonel’s partner. Mr. Street was a bachelor and his sister, widow of Dr. T.C. Macklem, managed his household. Mrs. Macklem had 2 sons. The eldest son drowned in the Niagara River at the age of 8 and the younger son, Sutherland became heir to the estate. Mr. Macklem opened Cynthia Islands and Cedar Island to the public and had roads built to reach them. Two suspension bridges connected them to the mainland and tolls were charged on the bridges. The improvements to the land cost Macklem $18,962. He called the bridges “Bridge Castor” and “Bridge Pollux”. There was also an office built at the end of Bridge Castor. Macklem also spent $454 fixing up the Burning Spring Building (the burning spring is enclosed in a barrel which collects gas and lets it out through a tube at the top). Macklem received a yearly income of $56,378.79 from tourists and visitors. In 1887 Cynthia Islands and Cedar Island were deeded to the crown and became part of Queen Victoria Park. The name Cynthia was changed to Dufferin in honour of Lord Dufferin. Sources: www.niagarafrontier.com/parks.html www.niagarafrontier.com/burningsprings.html