918 resultados para Benefit cost analysis


Relevância:

90.00% 90.00%

Publicador:

Resumo:

In the last decade, Intelligent Transportation Systems (ITS) have increasingly been deployed in work zones by state departments of transportation. Also known as smart work zone systems they improve traffic operations and safety by providing real-time information to travelers, monitoring traffic conditions, and managing incidents. Although there have been numerous ITS deployments in work zones, a framework for evaluating the effectiveness of these deployments does not exist. To justify the continued development and implementation of smart work zone systems, this study developed a framework to determine ITS effectiveness for specific work zone projects. The framework recommends using one or more of five performance measures: diversion rate, delay time, queue length, crash frequency, and speed. The monetary benefits and costs of ITS deployment in a work zone can then be computed using the performance measure values. Such ITS computations include additional considerations that are typically not present in standard benefit-cost computations. The proposed framework will allow for consistency in performance measures across different ITS studies thus allowing for comparisons across studies or for meta analysis. In addition, guidance on the circumstances under which ITS deployment is recommended for a work zone is provided. The framework was illustrated using two case studies: one urban work zone on I-70 and one rural work zone on I-44, in Missouri. The goals of the two ITS deployments were different – the I-70 ITS deployment was targeted at improving mobility whereas the I-44 deployment was targeted at improving safety. For the I-70 site, only permanent ITS equipment that was already in place was used for the project and no temporary ITS equipment was deployed. The permanent DMS equipment serves multiple purposes, and it is arguable whether that cost should be attributed to the work zone project. The data collection effort for the I-70 site was very significant as portable surveillance captured the actual diversion flows to alternative routes. The benefit-cost ratio for the I-70 site was 2.1 to 1 if adjusted equipment costs were included and 6.9 to 1 without equipment costs. The safety-focused I-44 ITS deployment had an estimated benefit-cost ratio of 3.2 to 1.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Bridge rail and approach guardrails provide safety to drivers by shielding more hazardous objects and redirecting vehicles to the roadway. However, guardrail can increase both the initial cost and maintenance cost of a bridge, while adding another object that may be struck by vehicles. Most existing low volume road (LVR) bridges in the state of Iowa are currently indicated to not possess bridge rail meeting “current acceptable standards”. The primary objective of the research summarized in this report was to provide the nations bridge and approach rail state of practice and perform a state wide crash analysis on bridge rails and approach guardrails on LVR bridges in Iowa. In support of this objective, the criteria and guidelines used by other bridge owners were investigated, non-standard and innovative bridge and approach guardrails for LVR’s were investigated, and descriptive, statistical and economical analyses were performed on a state wide crash analysis. The state wide crash analysis found the overall number of crashes at/on the more than 17,000+ inventoried and non-inventoried LVR bridges in Iowa was fewer than 350 crashes over an eight year period, representing less than 0.1% of the statewide reportable crashes. In other words, LVR bridge crashes are fairly rare events. The majority of these crashes occurred on bridges with a traffic volume less than 100 vpd and width less than 24 ft. Similarly, the majority of the LVR bridges possess similar characteristics. Crash rates were highest for bridges with lower traffic volumes, narrower widths, and negative relative bridge widths (relative bridge width is defined as: bridge width minus roadway width). Crash rate did not appear to be effected by bridge length. Statistical analysis confirmed that the frequency of vehicle crashes was higher on bridges with a lower width compared to the roadway width. The frequency of crashes appeared to not be impacted by weather conditions, but crashes may be over represented at night or in dark conditions. Statistical analysis revealed that crashes that occurred on dark roadways were more likely to result in major injury or fatality. These findings potentially highlight the importance of appropriate delineation and signing. System wide, benefit-cost (B/C) analyses yielded very low B/C ratios for statewide bridge rail improvements. This finding is consistent with the aforementioned recommendation to address specific sites where safety concerns exist.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The Iowa Department of Transportation (DOT) continuously assesses the likely causes of crashes at high-crash locations throughout the Iowa roadway network and designs solutions to reduce the incidences of crashes. This research analyzed approximately 100 safety projects constructed in the past 10 years to see what affect they had on highway safety. The projects are grouped into seven categories as defined by their scope of work: (1) install new traffic signal, (2) add turn lane(s), (3) install new signal and turn lane(s), (4) add left-turn phasing, (5) add left-turn phasing and turn lane(s), (6) replace pedestal mount signals with mast arm signals, and (7) other geometric improvements. The project makes use of an extensive statewide crash database. The results of the project will evaluate the assumed reduction factors and benefit/cost (B/C) analysis, determine the actual cost effectiveness of the Iowa DOT's safety programs, and allow the Iowa DOT to better prioritize future improvements.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Provision of left turn lanes is a major problem which lacks an objective approach. Various techniques and procedures in use have been reviewed. Traffic characteristics at typical Iowa intersections have been measured. A rational approach for inclusion of a left turn lane has been developed, based on relating the benefits to the road user to the cost of providing the added turing lane. An analysis of field data gathered under this project indicates that the use of theoretical distribution to describe vehicle headways is not applicable to rural Iowa two lane roads. As an alternate approach the mass of field data gathered were examined using multiple regression techniques to yield equations for predicting stops and delays. The benefit-cost ratio technique is recommended as the criterion for decision making.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The purpose of this thesis is to analyse activity-based costing (ABC) and possible modified versions ofit in engineering design context. The design engineers need cost information attheir decision-making level and the cost information should also have a strong future orientation. These demands are high because traditional management accounting has concentrated on the direct actual costs of the products. However, cost accounting has progressed as ABC was introduced late 1980s and adopted widely bycompanies in the 1990s. The ABC has been a success, but it has gained also criticism. In some cases the ambitious ABC systems have become too complex to build,use and update. This study can be called an action-oriented case study with some normative features. In this thesis theoretical concepts are assessed and allowed to unfold gradually through interaction with data from three cases. The theoretical starting points are ABC and theory of engineering design process (chapter2). Concepts and research results from these theoretical approaches are summarized in two hypotheses (chapter 2.3). The hypotheses are analysed with two cases (chapter 3). After the two case analyses, the ABC part is extended to cover alsoother modern cost accounting methods, e.g. process costing and feature costing (chapter 4.1). The ideas from this second theoretical part are operationalized with the third case (chapter 4.2). The knowledge from the theory and three cases is summarized in the created framework (chapter 4.3). With the created frameworkit is possible to analyse ABC and its modifications in the engineering design context. The framework collects the factors that guide the choice of the costing method to be used in engineering design. It also illuminates the contents of various ABC-related costing methods. However, the framework needs to be further tested. On the basis of the three cases it can be said that ABC should be used cautiously when formulating cost information for engineering design. It is suitable when the manufacturing can be considered simple, or when the design engineers are not cost conscious, and in the beginning of the design process when doing adaptive or variant design. If the design engineers need cost information for the embodiment or detailed design, or if manufacturing can be considered complex, or when design engineers are cost conscious, the ABC has to be always evaluated critically.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

[Summary] 2. Roles of quality control in the pharmaceutical and biopharmaceutical industries. - 2.1. Pharmaceutical industry. - 2.2. Biopharmaceutical industry. - 2.3. Policy and regulatory. - 2.3.1. The US Food and Drug Administration (FDA). - 2.3.2. The European Medicine Agency (EMEA). - 2.3.3. The Japanese Ministry of Work, Labor and Welfare (MHLW). - 2.3.4. The Swiss Agency for Therapeutic Products (Swissmedic). - 2.3.5. The International Conference on Harmonization (ICH). - - 3. Types of testing. - 3.1. Microbiological purity tests. - 3.2. Physiochemical tests. - 3.3. Critical to quality steps. - 3.3.1. API starting materials and excipients. - 3.3.2. Intermediates. - 3.3.3. APIs (drug substances) and final drug product. - 3.3.4. Primary and secondary packaging materials fro drug products. - - 4. Manufacturing cost and quality control. - 4.1.1. Pharmaceutical manufacturing cost breakdown. - 4.1.2. Biopharmaceutical manufacturing cost breakdown. - 4.2. Batch failure / rejection / rework / recalls. - - 5. Future trends in the quality control of pharmaceuticals and biopharmaceuticals. - 5.1. Rapid and real time testing. - 5.1.1. Physio-chemicals testing. - 5.1.2. Rapid microbiology methods

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Background: Assessing of the costs of treating disease is necessary to demonstrate cost-effectiveness and to estimate the budget impact of new interventions and therapeutic innovations. However, there are few comprehensive studies on resource use and costs associated with lung cancer patients in clinical practice in Spain or internationally. The aim of this paper was to assess the hospital cost associated with lung cancer diagnosis and treatment by histology, type of cost and stage at diagnosis in the Spanish National Health Service. Methods: A retrospective, descriptive analysis on resource use and a direct medical cost analysis were performed. Resource utilisation data were collected by means of patient files from nine teaching hospitals. From a hospital budget impact perspective, the aggregate and mean costs per patient were calculated over the first three years following diagnosis or up to death. Both aggregate and mean costs per patient were analysed by histology, stage at diagnosis and cost type. Results: A total of 232 cases of lung cancer were analysed, of which 74.1% corresponded to non-small cell lung cancer (NSCLC) and 11.2% to small cell lung cancer (SCLC); 14.7% had no cytohistologic confirmation. The mean cost per patient in NSCLC ranged from 13,218 Euros in Stage III to 16,120 Euros in Stage II. The main cost components were chemotherapy (29.5%) and surgery (22.8%). Advanced disease stages were associated with a decrease in the relative weight of surgical and inpatient care costs but an increase in chemotherapy costs. In SCLC patients, the mean cost per patient was 15,418 Euros for limited disease and 12,482 Euros for extensive disease. The main cost components were chemotherapy (36.1%) and other inpatient costs (28.7%). In both groups, the Kruskall-Wallis test did not show statistically significant differences in mean cost per patient between stages. Conclusions: This study provides the costs of lung cancer treatment based on patient file reviews, with chemotherapy and surgery accounting for the major components of costs. This cost analysis is a baseline study that will provide a useful source of information for future studies on cost-effectiveness and on the budget impact of different therapeutic innovations in Spain.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Paper presented at the 40th Annual Conference of LIBER (Ligue des Bibliothèques Européennes de Recherche - Association of European Research Libraries) on July 1st, 2011; with the slides used at the presentation.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper describes the cost-benefit analysis of digital long-term preservation (LTP) that was carried out in the context of the Finnish National Digital Library Project (NDL) in 2010. The analysis was based on the assumption that as many as 200 archives, libraries, and museums will share an LTP system. The term ‘system’ shall be understood as encompassing not only information technology, but also human resources, organizational structures, policies and funding mechanisms. The cost analysis shows that an LTP system will incur, over the first 12 years, cumulative costs of €42 million, i.e. an average of €3.5 million per annum. Human resources and investments in information technology are the major cost factors. After the initial stages, the analysis predicts annual costs of circa €4 million. The analysis compared scenarios with and without a shared LTP system. The results indicate that a shared system will have remarkable benefits. At the development and implementation stages, a shared system shows an advantage of €30 million against the alternative scenario consisting of five independent LTP solutions. During the later stages, the advantage is estimated at €10 million per annum. The cumulative cost benefit over the first 12 years would amount to circa €100 million.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The aim of this work was to propose, apply and evaluate a methodical approach to select welding processes in a productive environment based on market requirements of Quality and Costs. A case study was used. The welds were carried out in laboratory, simulating the joint conditions of a manufacturer and using several welding processes: SMAW, GTAW, pulsed GTAW, GMAW with CO2 and Ar based shielding gases and pulsed GMAW. For Quality analysis geometrical aspects of the beads were considered and for Cost analysis, welding parameters and consumable prices. Quantitative indices were proposed and evaluated. After that, evaluation of both Quality and Costs was done, showing to be possible to select the most suitable welding process to a specific application, taking into account the market conditions of a company.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This report introduces the ENPI project called “EMIR - Exploitation of Municipal and Industrial Residues” which was executed in a co-operation between Lappeenranta University of Technology (LUT), Saint Petersburg State University of Economics (SPbSUE), Saint Petersburg State Technical University of Plant Polymers (SPbSTUPP) and industrial partners from both Leningrad Region (LR), Russia and Finland. The main targets of the research were to identify the possibilities for deinking sludge management scenarios in co-operation with partner companies, to compare the sustainability of the alternatives, and to provide recommendations for the companies in the Leningrad Region on how to best manage deinking sludge. During the literature review, 24 deinking sludge utilization possibilities were identified, the majority falling under material recovery. Furthermore, 11 potential utilizers of deinking sludge were found within the search area determined by the transportation cost. Each potential utilizer was directly contacted in order to establish cooperation for deinking sludge utilization. Finally, four companies, namely, “Finnsementti” – a cement plant in Finland (S1), “St.Gobian Weber” – a light-weight aggregate plant in Finland (S2), “LSR-Cement” – a cement plant in LR (S3), and “Rockwool” – a stone wool plant in LR (S4) were seen as the most promising partners and were included in the economic and environmental assessments. Economic assessment using cost-benefit analysis (CBA) indicated that substitution of heavy fuel oil with dry deinking sludge in S2 was the most feasible option with a benefit/cost ratio (BCR) of 3.6 when all the sludge was utilized. At the same time, the use of 15% of the total sludge amount (the amount that could potentially be treated in the scenario) resulted in a BCR of only 0.16. The use of dry deinking sludge in the production of cement (S3) is a slightly more feasible option with a BCR of 1.1. The use of sludge in stone wool production is feasible only when all the deinking sludge is used and burned in an existing incineration plant. The least economically feasible utilization possibility is the use of sludge in cement production in Finland (S1) due to the high gate fee charged. Environmental assessment was performed applying internationally recognized life cycle assessment (LCA) methodologies: ISO 14040 and ISO 14044. The results of a consequential LCA stated that only S1 and S2 lead to a reduction of all environmental impacts within the impact categories chosen compared to the baseline scenario where deinking sludge is landfilled. Considering S1, the largest reduction of 13% was achieved for the global warming potential (GWP), whereas for S2, the largest decrease of abiotic depletion potential (ADP) was by 1.7%, the eutrophication potential (EP) by 1.8%, and a GWP of 2.1% was documented. In S3, the most notable increase of ADP and acidification potential (AP) by 2.6 and 1.5% was indicated, while the GWP was reduced by 12%, the largest out of all the impact categories. In S4, ADP and AP increased by 2.3 and 2.1% respectively, whereas ODP was reduced by 25%. During LCA, it was noticed that substitution of fuels causes a greater reduction of environmental impact (S1 and S2) than substitution of raw materials (S3 and S4). Despite a number of economically and environmentally acceptable deinking sludge utilization methods being assessed in the research, evaluation of bottlenecks and communications with companies’ representatives uncovered the fact that the availability of the raw materials consumed, and the risks associated with technological problems resulting from the sludge utilization, limited the willingness of industrial partners to start deinking sludge utilization. The research results are of high value for decision-makers at already existing paper mills since the result provide insights regarding alternatives to the deinking sludge utilization possibilities already applied. Thus, the research results support the maximum economic and environmental value recovery from waste paper utilization.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

But : La radiothérapie (RT) est disponible seulement dans les grandes villes au Québec. Les patients atteints de cancer vivant en zone rurale doivent voyager pour obtenir ces soins. Toute proportion gardée, moins de ces patients accèdent à la RT. L’accessibilité serait améliorée en instaurant de petits centres de RT qui dépendraient de la télémédecine (téléRT). Cette étude tente (1) de décrire un modèle (population visée et technologie) réaliste de téléRT; (2) d’en estimer les coûts, comparativement à la situation actuelle où les patients voyagent (itineRT). Méthode : (1) À l’aide de données probantes, le modèle de téléRT a été développé selon des critères de : faisabilité, sécurité, absence de transfert des patients et minimisation du personnel. (2) Les coûts ont été estimés du point de vue du payeur unique en utilisant une méthode publiée qui tient compte des coûts en capitaux, de la main d’oeuvre et des frais généraux. Résultats : (1) Le modèle de téléRT proposé se limiterait aux traitements palliatifs à 250 patients par année. (2) Les coûts sont de 5918$/patient (95% I.C. 4985 à 7095$) pour téléRT comparativement à 4541$/patient (95%I.C. 4351 à 4739$) pour itineRT. Les coûts annuels de téléRT sont de 1,48 M$ (d.s. 0,6 M$), avec une augmentation des coûts nets de seulement 0,54 M$ (d.s. 0,26 M$) comparativement à itineRT. Si on modifiait certaines conditions, le service de téléRT pourrait s’étendre au traitement curatif du cancer de prostate et du sein, à coûts similaires à itineRT. Conclusion : Ce modèle de téléRT pourrait améliorer l’accessibilité et l’équité aux soins, à des coûts modestes.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Objetivo:Describir los costos asociados al soporte nutricional enteral en pacientes adultos hospitalizados en Unidades de Cuidados Intensivos (UCI), Metodología: La elaboración de este documento se realizó en una búsqueda exhaustiva de acuerdo a las especificaciones y recomendaciones de la revisión de literatura, en MEDLINE, PUBMED, SCIENCE DIRECT, EBSCO por considerarse como bases de datos reconocidas por contener artículos de mayor fiabilidad y más usadas en el ámbito académico. Se evidencio en los 70 artículosel cumplimiento de los criterios de inclusión, enel cual se realizó un análisis de costos en el manejo del soporte nutricional enteral y se identificó la importancia del manejo de la nutrición en pacientes adultos del servicio de UCI. Resultados: De tal manera la importancia del soporte nutricional enteral, en su proceso precoz se identifica la reducción de costos y de recursos que se puede manejar ante el paciente crítico. Dentro de este marco se resalta que el soporte nutricional enteral debe ser la primera opción en paciente. Conclusión:La nutrición enteral considerada un modelo de innovación al soporte nutricional en las últimas décadas, ha evolucionado contribuyendo una adecuada alternativa de intervención y sin efectos adversos clínicos relevantes, que además mejoran la calidad de vida y contribuyen a la toma de decisiones clínicas basadas en la evidencia y en los análisis de costes con el uso racional de los recursos, así mismo, es una práctica costo- efectiva,con componente de costo- beneficio para el usuario al mejorar calidad de vida, obteniendo mayores beneficios a un menor costo.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The cost of a road construction over its service life is a function of the design, quality of construction, maintenance strategies and maintenance operations. Unfortunately, designers often neglect a very important aspect which is the possibility to perform future maintenance activities. The focus is mainly on other aspects such as investment costs, traffic safety, aesthetic appearance, regional development and environmental effects. This licentiate thesis is a part of a Ph.D. project entitled “Road Design for lower maintenance costs” that aims to examine how the life-cycle costs can be optimized by selection of appropriate geometrical designs for the roads and their components. The result is expected to give a basis for a new method used in the road planning and design process using life-cycle cost analysis with particular emphasis on road maintenance. The project started with a review of literature with the intention to study conditions causing increased needs for road maintenance, the efforts made by the road authorities to satisfy those needs and the improvement potential by consideration of maintenance aspects during planning and design. An investigation was carried out to identify the problems which obstruct due consideration of maintenance aspects during the road planning and design process. This investigation focused mainly on the road planning and design process at the Swedish Road Administration. However, the road planning and design process in Denmark, Finland and Norway were also roughly evaluated to gain a broader knowledge about the research subject. The investigation was carried out in two phases: data collection and data analysis. Data was collected by semi-structured interviews with expert actors involved in planning, design and maintenance and by a review of design-related documents. Data analyses were carried out using a method called “Change Analysis”. This investigation revealed a complex combination of problems which result in inadequate consideration of maintenance aspects. Several urgent needs for changes to eliminate these problems were identified. Another study was carried out to develop a model for calculation of the repair costs for damages of different road barrier types and to analyse how factors such as road type, speed limits, barrier types, barrier placement, type of road section, alignment and seasonal effects affect the barrier damages and the associated repair costs. This study was carried out using a method called the “Case Study Research Method”. Data was collected from 1087 barrier repairs in two regional offices of the Swedish Road Administration, the Central Region and the Western Region. A table was established for both regions containing the repair cost per vehicle kilometre for different combinations of barrier types, road types and speed limits. This table can be used by the designers in the calculation of the life-cycle costs for different road barrier types.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Maintenance planning of road pavement requires reliable estimates of roads’ lifetimes. In determining the lifetime of a road, this study combines maintenance activities and road condition measurements. The scope of the paper is to estimate lifetimes of road pavements in Sweden with time to event analysis. The model used includes effects of pavement type, road type, bearing capacity, road width, speed limit, stone size and climate zone, where the model is stratified according to traffic load. Among the nine analyzed pavement types, stone mastic had the longest expected lifetime, 32 percent longer than asphalt concrete. Among road types, ordinary roads with cable barriers had 30 percent shorter lifetime than ordinary roads. Increased speed lowered the lifetime, while increased stone size (up to 20 mm) and increased road width lengthened the lifetime. The results are of importance for life cycle cost analysis and road management.