945 resultados para BIM 5D
Resumo:
The UK construction industry comprises a very high proportion of SMEs that is companies employing up to 250. A Department for Business, Innovation and Skills research paper, found that SMEs had a 71.2% share of work in the construction industry. Micro and small firms (i.e. those employing up to 50) had a share of 46.7% of work (Ive and Murray 2013). The Government has high ambitions for UK construction. Having been found by successive government commissioned studies to be inefficient and highly fragmented, ambitious targets have been set for the industry to achieve 33% reduction in costs and 50% faster delivery by 2025. As a significant construction client, the Government has mandated the use of Level 2 BIM from 2016 on publicly funded projects over £5 million. The adoption of BIM plays a key role in the 2025 vision but a lack of clarity persists in the industry over BIM and significant barriers are perceived to its implementation, particularly amongst SMEs. However, industry wide transformation will be challenging without serious consideration of the capabilities of this large majority. Many larger firms, having implemented Level 2 BIM are now working towards Level 3 BIM while many of the smaller firms in the industry have not even heard of BIM. It would seem that fears of a ‘two tier’ industry are perhaps being realised. This paper builds on an earlier one (Mellon & Kouider 2014) and investigates, through field work, the level of Level 2 BIM implementation amongst SMEs compared to a large organisation. Challenges and innovative solutions identified through collected data are fully discussed and compared. It is suggested that where the SME perceives barriers towards adoption of the technologies which underpin BIM, they may consider collaborative methods of working as an interim step in order to work towards realising the efficiencies and benefits that these methods can yield. While the barriers to adoption of BIM are significant, it is suggested that they are not insurmountable for the SME and some recommendations for possible solutions are made.
Resumo:
It has been widely documented that when Building Information Modelling (BIM) is used, there is a shift in effort to the design phase. Little investigation into the impact of this shift in effort has been done and how it impacts on costs. It can be difficult to justify the increased expenditure on BIM in a market that is heavily driven by costs. There are currently studies attempting to quantify the return on investment (ROI) for BIM for which these returns can be seen to balance out the shift in efforts and costs to the design phase. The studies however quantify the ROI based on the individual stakeholder’s investment without consideration for the impact that the use of BIM from their project partners may have on their own profitability. In this study, a questionnaire investigated opinions and experience of construction professionals, representing clients, consultants, designers and contractors, to determine fluctuations in costs by their magnitude and when they occur. These factors were examined more closely by interviewing senior members representing each of the stakeholder categories and comparing their experience in using BIM within environments where their project partners were also using BIM and when they were not. This determined the differences in how the use and the investment in BIM impacts on others and how costs are redistributed. This redistribution is not just through time but also between stakeholders and categories of costs. Some of these cost fluctuations and how the cost of BIM is currently financed are also highlighted in several case studies. The results show that the current distribution of costs set for traditional 2D delivery is hindering the potential success of BIM. There is also evidence that stakeholders who don’t use BIM may benefit financially from the BIM use of others and that collaborative BIM is significantly different to the use of ‘lonely’ BIM in terms of benefits and profitability.
Resumo:
Introducing teaching about healthy solutions in buildings and BIM has been a challenge for the University of Alicante. Teaching attached to very tighten study plans conditioned the types of methods that could be used in the past. The worldwide situation of crisis that especially reached Spain and the bursting of the housing bubble generated a lack of employment that reached universities where careers related to construction, Architecture and Architectural Technologist, suffered a huge reduction in the number of students enrolled. In the case of the University of Alicante, students’ enrolment for Architectural Technology reached an 80% reduction. The necessity of a reaction against this situation made the teachers be innovative and use the new Bologna adapted study plans to develop new teaching experiences introducing new concepts: people wellbeing in buildings and BIM. Working with healthy solutions in buildings provided new approaches for building design and construction as an alternative to sustainability. For many years sustainability was the concept that applied to housing gave buildings an added value and the possibility of having viability in a very complex scenario. But after lots of experiences, the approved methodologies for obtaining sustainable housing were ambiguous and at the end, investors, designers, constructors and purchasers cannot find real and validated criteria for obtaining an effective sustainable house. It was the moment to work with new ideas and concepts and start facing buildings from the users’ point of view. At the same time the development of new tools, BIM, has opened a wide range of opportunities, innovative and suggestive, that allows simulation and evaluation of many building factors. This paper describes the research in teaching developed by the University of Alicante to adapt the current study plans, introducing work with healthy solutions in buildings and the use of BIM, with the aim of attracting students by improving their future employability. Pilot experiences have been carried out in different subjects based on the work with projects and case studies under an international frame with the cooperation of different European partner universities. The use of BIM tools, introduced in 2014, solved the problems that appeared in some subjects, mainly building construction, and helped with the evaluation of some healthy concepts that presented difficulties until this moment as knowledge acquired by the students was hard to be evaluated. The introduction of BIM tools: Vasari, FormIt, Revit and Light Control among others, allowed the study of precise healthy concepts and provided the students a real understand of how these different parameters can condition a healthy architectural space. The analysis of the results showed a clear acceptance by the students and gave teachers the possibility of opening new research lines. At the same time, working with BIM tools to obtain healthy solutions in building has been a good option to improve students’ employability as building market in Spain is increasing the number of specialists in BIM with a wider knowledge.
Resumo:
L’obiettivo della tesi è quello di fare una panoramica sulla strategia BIM e quindi sulla digitalizzazione del processo costruttivo. Grazie alla analisi di un caso di studio, altro obiettivo è quello di analizzare e valutare la metodologia BIM 4D/5D, ossia la gestione dei tempi e dei costi di realizzazione dell’opera. Nella prima fase si affronta il tema del BIM, con una analisi sull’evoluzione degli strumenti di elaborazione e rappresentazione digitale del progetto architettonico, su come questi strumenti si differenzino sia dal punto di vista operativo che concettuale rivoluzionando il flusso di lavoro odierno. Quindi, partendo da un’analisi che e ritrae l’estrema frammentazione del settore delle costruzioni, si va ad analizzare come il BIM aumenti e favorisca la collaborazione delle parti interessate, armonizzando l’intero processo costruttivo dell’opera. Si prosegue con l'esame della diffusione e del livello di maturità degli strumenti BIM, di come i privati e le amministrazioni pubbliche, a livello mondiale, stiano spingendo per favorire l’adozione della metodologia BIM. Inoltre si analizzano le dinamiche dell’interoperabilità, delle metodologie e protocolli di interscambio dati, che sono un elemento chiave per il successo del BIM per via dei numerosi strumenti, specializzati nelle varie discipline del settore edile. Nella terza parte, dedicata al Project Management di un caso di studio, si verifica la bontà delle metodologie teorizzate attraverso la realizzazione di un modello virtuale in Revit. Dal modello realizzato dal laureando sono estrapolate le informazioni necessarie alla gestione, e tramite il software STRVison CPM, si elaborano i principali documenti per la progettazione e gestione del cantiere: il CM, il CME, i tempi operativi, il cronoprogramma Gantt. Obbiettivo è constatare l’effettivo livello di maturità della strategia BIM 4D e 5D e la reale possibilità di un impiego capillare nel panorama italiano del settore delle costruzioni.
Resumo:
Phytochemicals have provided an abundant and effective source of therapeutics for the treatment of cancer. Here we describe the characterization of a novel plant toxin, persin, with in vivo activity in the mammary gland and a p53-, estrogen receptor-, and Bcl-2-independent mode of action. Persin was previously identified from avocado leaves as the toxic principle responsible for mammary gland-specific necrosis and apoptosis in lactating livestock. Here we used a lactating mouse model to confirm that persin has a similar cytotoxicity for the lactating mammary epithelium. Further in vitro studies in a panel of human breast cancer cell lines show that persin selectively induces a G(2)-M cell cycle arrest and caspase-dependent apoptosis in sensitive cells. The latter is dependent on expression of the BH3-only protein Bim. Bim is a sensor of cytoskeletal integrity, and there is evidence that unique structure of the compound, persin could represent a novel class of microtubule-targeting agent with potential specificity for breast cancers.
Resumo:
World-wide efforts have been made to adopt BIM (Building Information Modelling) to improve the efficiency of construction project management processes lively. BIM means a shared digitized expression which provides a reliable source to make an informed decision over a physical or a functional character across all construction sectors including design, civil engineering and plant construction. The Korean Public Procurement Service mandates to use BIM for over 50 billion won public construction projects from 2012, and this will be extended to every project initiated by the Korean Public Procurement Service from 2016. This paper aims not only to investigate potential barriers which can be faced at the initial stage of BIM adoption, but also to explore possible solutions against them. For doing this, the BIM utilization strategies and action plans by US and UK public sectors which adopt BIM earlier than Korea were analysed. Based on the results of comparative analysis between US and UK, the proper guideline for BIM adoption in Korea will be suggested.
Resumo:
Construction customers are persistently seeking to achieve sustainability and maximize value as sustainability has become a major consideration in the construction industry. In particular, it is essential to refurbish a whole house to achieve the sustainability agenda of 80% CO2 reduction by 2050 as the housing sector accounts for 28% of the total UK CO2 emission. However, whole house refurbishment seems to be challenging due to the highly fragmented nature of construction practice, which makes the integration of diverse information throughout the project lifecycle difficult. Consequently, Building Information Modeling (BIM) is becoming increasingly difficult to ignore in order to manage construction projects in a collaborative manner, although the current uptake of the housing sector is low at 25%. This research aims to investigate homeowners’ decision making factors for housing refurbishment projects and to provide a valuable dataset as an essential input to BIM for such projects. One-hundred and twelve homeowners and 39 construction professionals involved in UK housing refurbishment were surveyed. It was revealed that homeowners value initial cost more while construction professionals value thermal performance. The results supported that homeowners and professionals both considered the first priority to be roof refurbishment. This research revealed that BIM requires a proper BIM dataset and objects for housing refurbishment.
Resumo:
The integration between architectural design and structur al systems consi sts, in academic education, one of the main challenges to the architectural design education . Recent studies point to the relevance of the use of computational tools in academic settings as an important strategy for such integration. Although in recent yea rs teaching experience using BIM (BuildingInformationModeling) may be incorporated by the a rchitecture schools , notes the need for further didactic and pedagogical practices that promote the architectural design and structur al integration teaching. This pa per analyzes experiences developed within the UFRN and UFPB, seeking to identify tools, processes and products used, pointing limitations and potentials in subjects taught in these institutions. The research begins with a literature review on teaching BIM and related aspects to the integration of architectural design and stru c tur e . It has been used as data collection techniques in studio the direct observation, the use of questionnaires and interviews with students and teachers, and mixed method, qualitativ e and quantitative analysis . In UFRN, the scope of the Integrated Workshop as a compulsory subject in the curriculum, favors the integration of disciplines studied here as it allows teachers from different disciplines at the same project studio . Regarding the use of BIM form initial users, BIM modelers, able to extract quantitative and automatically speed up production, gaining in quality in the products, however learn the tool and design in parallel cause some difficulties. UFPB, lack of required courses o n BIM, generates lack of knowledge and confidence in using the tool and processes, by most students. Thus we see the need for greater efforts by school to adopt BIM skills and training. There is a greater need for both BIM concept, in order to promote BIM process and consequent better use of tools, and obsolete avoiding impairment of technology, merely a tool. It is considered the inclusion of specific subjects with more advanced BIM skills, through partnerships with engineering degrees and the promotion of trans disciplinary integration favoring the exchange of different cultures from the academic environment.
Resumo:
The unprecedented and relentless growth in the electronics industry is feeding the demand for integrated circuits (ICs) with increasing functionality and performance at minimum cost and power consumption. As predicted by Moore's law, ICs are being aggressively scaled to meet this demand. While the continuous scaling of process technology is reducing gate delays, the performance of ICs is being increasingly dominated by interconnect delays. In an effort to improve submicrometer interconnect performance, to increase packing density, and to reduce chip area and power consumption, the semiconductor industry is focusing on three-dimensional (3D) integration. However, volume production and commercial exploitation of 3D integration are not feasible yet due to significant technical hurdles.
At the present time, interposer-based 2.5D integration is emerging as a precursor to stacked 3D integration. All the dies and the interposer in a 2.5D IC must be adequately tested for product qualification. However, since the structure of 2.5D ICs is different from the traditional 2D ICs, new challenges have emerged: (1) pre-bond interposer testing, (2) lack of test access, (3) limited ability for at-speed testing, (4) high density I/O ports and interconnects, (5) reduced number of test pins, and (6) high power consumption. This research targets the above challenges and effective solutions have been developed to test both dies and the interposer.
The dissertation first introduces the basic concepts of 3D ICs and 2.5D ICs. Prior work on testing of 2.5D ICs is studied. An efficient method is presented to locate defects in a passive interposer before stacking. The proposed test architecture uses e-fuses that can be programmed to connect or disconnect functional paths inside the interposer. The concept of a die footprint is utilized for interconnect testing, and the overall assembly and test flow is described. Moreover, the concept of weighted critical area is defined and utilized to reduce test time. In order to fully determine the location of each e-fuse and the order of functional interconnects in a test path, we also present a test-path design algorithm. The proposed algorithm can generate all test paths for interconnect testing.
In order to test for opens, shorts, and interconnect delay defects in the interposer, a test architecture is proposed that is fully compatible with the IEEE 1149.1 standard and relies on an enhancement of the standard test access port (TAP) controller. To reduce test cost, a test-path design and scheduling technique is also presented that minimizes a composite cost function based on test time and the design-for-test (DfT) overhead in terms of additional through silicon vias (TSVs) and micro-bumps needed for test access. The locations of the dies on the interposer are taken into consideration in order to determine the order of dies in a test path.
To address the scenario of high density of I/O ports and interconnects, an efficient built-in self-test (BIST) technique is presented that targets the dies and the interposer interconnects. The proposed BIST architecture can be enabled by the standard TAP controller in the IEEE 1149.1 standard. The area overhead introduced by this BIST architecture is negligible; it includes two simple BIST controllers, a linear-feedback-shift-register (LFSR), a multiple-input-signature-register (MISR), and some extensions to the boundary-scan cells in the dies on the interposer. With these extensions, all boundary-scan cells can be used for self-configuration and self-diagnosis during interconnect testing. To reduce the overall test cost, a test scheduling and optimization technique under power constraints is described.
In order to accomplish testing with a small number test pins, the dissertation presents two efficient ExTest scheduling strategies that implements interconnect testing between tiles inside an system on chip (SoC) die on the interposer while satisfying the practical constraint that the number of required test pins cannot exceed the number of available pins at the chip level. The tiles in the SoC are divided into groups based on the manner in which they are interconnected. In order to minimize the test time, two optimization solutions are introduced. The first solution minimizes the number of input test pins, and the second solution minimizes the number output test pins. In addition, two subgroup configuration methods are further proposed to generate subgroups inside each test group.
Finally, the dissertation presents a programmable method for shift-clock stagger assignment to reduce power supply noise during SoC die testing in 2.5D ICs. An SoC die in the 2.5D IC is typically composed of several blocks and two neighboring blocks that share the same power rails should not be toggled at the same time during shift. Therefore, the proposed programmable method does not assign the same stagger value to neighboring blocks. The positions of all blocks are first analyzed and the shared boundary length between blocks is then calculated. Based on the position relationships between the blocks, a mathematical model is presented to derive optimal result for small-to-medium sized problems. For larger designs, a heuristic algorithm is proposed and evaluated.
In summary, the dissertation targets important design and optimization problems related to testing of interposer-based 2.5D ICs. The proposed research has led to theoretical insights, experiment results, and a set of test and design-for-test methods to make testing effective and feasible from a cost perspective.
Resumo:
Los procesos de diseño y construcción tradicionales de la industria de la construcción que se han conservado inalterados durante años, han impedido vislumbrar los impactos positivos que se pueden dar al trabajar en conjunto con las tecnologías de información -- El miedo al cambio hace que las empresas del sector denominen “normal” a la fragmentación del proceso constructivo, y presupuesten desde el inicio de la obra atrasos por incompatibilidades en los diseños causados principalmente por la falta de comunicación y coordinación entre los diferentes participantes del proyecto -- La implementación de tecnologías de información busca no sólo ayudar como una herramienta a los diseños del proyecto, sino que también ofrece elementos para integrar a los participantes y contratistas del proyecto en un equipo de trabajo donde exista mayor interoperabilidad entre las áreas implicadas en el planteamiento, diseño y ejecución del proyecto, y se pueda disminuir de sobremanera la fragmentación que vuelve tan poco competitiva esta industria a nivel mundial -- En el presente trabajo de grado se realizó un estado del arte de la tecnología de información BIM con el fin de sintetizar las enormes cantidades de información disponibles y de posibilitar una mejor comprensión de este -- Con la teoría y los manuales estudiados a profundidad de los software que componen esta tecnología, se procedió a desarrollar un ejercicio exploratorio confrontando los conocimientos adquiridos teóricos con la parte práctica, parte en donde se pudieron vislumbrar las ventajas y desventajas al implementar este software en la industria de la construcción de nuestro país -- Finalmente se exponen los requerimientos y limitaciones que trae consigo la aplicación de esta tecnología a los proyectos de construcción
Resumo:
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Arquitetura e Urbanismo, Programa de Pós-Graduação em Arquitetura e Urbanismo, 2015.
Resumo:
Background Some studies have reported a ceiling effect in EQ-5D-3L, especially in healthy and/or young individuals. Recently, two further levels have been included in its measurement model (EQ-5D-5L). The purposes of this study were (1) to assess the properties of the EQ-5D-5L in comparison with the standard EQ-5D-3L in a sample of young adults, (2) to foreground the importance of collecting qualitative data to confirm, validate or refine the EQ-5D questionnaire items and (3) to raise questions pertaining to the wording in these questionnaire items. Methods The data used came from a sample of respondents aged 30 or under (n = 624). They completed both versions of the EQ-5D, which were compared in terms of feasibility, level of inconsistency and ceiling effect. Agreement between the instruments was assessed using correlation coefficients and Bland-Altman plots. Known-groups validity of the EQ-5D-5L was also assessed using non-parametric tests. The discriminative properties were compared using receiver operating characteristic curves. Finally, four interviews were conducted for retrospective reports to elicit respondents’ understanding and perceptions of the format, instructions, items, and responses. Results Quantitative results show a ceiling effect reduction of 25.3 % and a high level agreement between both indices. Known-groups validity was confirmed for the EQ-5D-5L. Explorative interviews indicated ambiguity and low degree of certainty in regards to conceptualizing differences between levels moderate-slight across three dimensions. Conclusions The EQ-5D-5L performed better than the EQ-5D-3L. However, the explorative interviews demonstrated several limitations in the EQ-5D questionnaire wording and high context-dependent answers point to lack of illnesses’ experience amongst young adults.