809 resultados para team level investigation
Resumo:
Power transformers are one of the most important and costly equipment in power generation, transmission and distribution systems. Current average age of transformers in Australia is around 25 years and there is a strong economical tendency to use them up to 50 years or more. As the transformers operate, they get degraded due to different loading and environmental operating stressed conditions. In today‘s competitive energy market with the penetration of distributed energy sources, the transformers are stressed more with minimum required maintenance. The modern asset management program tries to increase the usage life time of power transformers with prognostic techniques using condition indicators. In the case of oil filled transformers, condition monitoring methods based on dissolved gas analysis, polarization studies, partial discharge studies, frequency response analysis studies to check the mechanical integrity, IR heat monitoring and other vibration monitoring techniques are in use. In the current research program, studies have been initiated to identify the degradation of insulating materials by the electrical relaxation technique known as dielectrometry. Aging leads to main degradation products like moisture and other oxidized products due to fluctuating thermal and electrical loading. By applying repetitive low frequency high voltage sine wave perturbations in the range of 100 to 200 V peak across available terminals of power transformer, the conductive and polarization parameters of insulation aging are identified. An in-house novel digital instrument is developed to record the low leakage response of repetitive polarization currents in three terminals configuration. The technique is tested with known three transformers of rating 5 kVA or more. The effects of stressing polarization voltage level, polarizing wave shapes and various terminal configurations provide characteristic aging relaxation information. By using different analyses, sensitive parameters of aging are identified and it is presented in this thesis.
Resumo:
Scoping Project: Currently no national or structured learning framework available in Aus or NZ Current Project: Develop a national training program & capability framework for rail incident investigators - Establish the potential market demand - Define the curricula for a multi-level national training program - Explore training providers & delivery options
Resumo:
Prostate cancer is the second most common cause of cancer-related deaths in Western males. Current diagnostic, prognostic and treatment approaches are not ideal and advanced metastatic prostate cancer is incurable. There is an urgent need for improved adjunctive therapies and markers for this disease. GPCRs are likely to play a significant role in the initiation and progression of prostate cancer. Over the last decade, it has emerged that G protein coupled receptors (GPCRs) are likely to function as homodimers and heterodimers. Heterodimerisation between GPCRs can result in the formation of novel pharmacological receptors with altered functional outcomes, and a number of GPCR heterodimers have been implicated in the pathogenesis of human disease. Importantly, novel GPCR heterodimers represent potential new targets for the development of more specific therapeutic drugs. Ghrelin is a 28 amino acid peptide hormone which has a unique n-octanoic acid post-translational modification. Ghrelin has a number of important physiological roles, including roles in appetite regulation and the stimulation of growth hormone release. The ghrelin receptor is the growth hormone secretagogue receptor type 1a, GHS-R1a, a seven transmembrane domain GPCR, and GHS-R1b is a C-terminally truncated isoform of the ghrelin receptor, consisting of five transmembrane domains. Growing evidence suggests that ghrelin and the ghrelin receptor isoforms, GHS-R1a and GHS-R1b, may have a role in the progression of a number of cancers, including prostate cancer. Previous studies by our research group have shown that the truncated ghrelin receptor isoform, GHS-R1b, is not expressed in normal prostate, however, it is expressed in prostate cancer. The altered expression of this truncated isoform may reflect a difference between a normal and cancerous state. A number of mutant GPCRs have been shown to regulate the function of their corresponding wild-type receptors. Therefore, we investigated the potential role of interactions between GHS-R1a and GHS-R1b, which are co-expressed in prostate cancer and aimed to investigate the function of this potentially new pharmacological receptor. In 2005, obestatin, a 23 amino acid C-terminally amidated peptide derived from preproghrelin was identified and was described as opposing the stimulating effects of ghrelin on appetite and food intake. GPR39, an orphan GPCR which is closely related to the ghrelin receptor, was identified as the endogenous receptor for obestatin. Recently, however, the ability of obestatin to oppose the effects of ghrelin on appetite and food intake has been questioned, and furthermore, it appears that GPR39 may in fact not be the obestatin receptor. The role of GPR39 in the prostate is of interest, however, as it is a zinc receptor. Zinc has a unique role in the biology of the prostate, where it is normally accumulated at high levels, and zinc accumulation is altered in the development of prostate malignancy. Ghrelin and zinc have important roles in prostate cancer and dimerisation of their receptors may have novel roles in malignant prostate cells. The aim of the current study, therefore, was to demonstrate the formation of GHS-R1a/GHS-R1b and GHS-R1a/GPR39 heterodimers and to investigate potential functions of these heterodimers in prostate cancer cell lines. To demonstrate dimerisation we first employed a classical co-immunoprecipitation technique. Using cells co-overexpressing FLAG- and Myc- tagged GHS-R1a, GHS-R1b and GPR39, we were able to co-immunoprecipitate these receptors. Significantly, however, the receptors formed high molecular weight aggregates. A number of questions have been raised over the propensity of GPCRs to aggregate during co-immunoprecipitation as a result of their hydrophobic nature and this may be misinterpreted as receptor dimerisation. As we observed significant receptor aggregation in this study, we used additional methods to confirm the specificity of these putative GPCR interactions. We used two different resonance energy transfer (RET) methods; bioluminescence resonance energy transfer (BRET) and fluorescence resonance energy transfer (FRET), to investigate interactions between the ghrelin receptor isoforms and GPR39. RET is the transfer of energy from a donor fluorophore to an acceptor fluorophore when they are in close proximity, and RET methods are, therefore, applicable to the observation of specific protein-protein interactions. Extensive studies using the second generation bioluminescence resonance energy transfer (BRET2) technology were performed, however, a number of technical limitations were observed. The substrate used during BRET2 studies, coelenterazine 400a, has a low quantum yield and rapid signal decay. This study highlighted the requirement for the expression of donor and acceptor tagged receptors at high levels so that a BRET ratio can be determined. After performing a number of BRET2 experimental controls, our BRET2 data did not fit the predicted results for a specific interaction between these receptors. The interactions that we observed may in fact represent ‘bystander BRET’ resulting from high levels of expression, forcing the donor and acceptor into close proximity. Our FRET studies employed two different FRET techniques, acceptor photobleaching FRET and sensitised emission FRET measured by flow cytometry. We were unable to observe any significant FRET, or FRET values that were likely to result from specific receptor dimerisation between GHS-R1a, GHS-R1b and GPR39. While we were unable to conclusively demonstrate direct dimerisation between GHS-R1a, GHS-R1b and GPR39 using several methods, our findings do not exclude the possibility that these receptors interact. We aimed to investigate if co-expression of combinations of these receptors had functional effects in prostate cancers cells. It has previously been demonstrated that ghrelin stimulates cell proliferation in prostate cancer cell lines, through ERK1/2 activation, and GPR39 can stimulate ERK1/2 signalling in response to zinc treatments. Additionally, both GHS-R1a and GPR39 display a high level of constitutive signalling and these constitutively active receptors can attenuate apoptosis when overexpressed individually in some cell types. We, therefore, investigated ERK1/2 and AKT signalling and cell survival in prostate cancer the potential modulation of these functions by dimerisation between GHS-R1a, GHS-R1b and GPR39. Expression of these receptors in the PC-3 prostate cancer cell line, either alone or in combination, did not alter constitutive ERK1/2 or AKT signalling, basal apoptosis or tunicamycin-stimulated apoptosis, compared to controls. In summary, the potential interactions between the ghrelin receptor isoforms, GHS-R1a and GHS-R1b, and the related zinc receptor, GPR39, and the potential for functional outcomes in prostate cancer were investigated using a number of independent methods. We did not definitively demonstrate the formation of these dimers using a number of state of the art methods to directly demonstrate receptor-receptor interactions. We investigated a number of potential functions of GPR39 and GHS-R1a in the prostate and did not observe altered function in response to co-expression of these receptors. The technical questions raised by this study highlight the requirement for the application of extensive controls when using current methods for the demonstration of GPCR dimerisation. Similar findings in this field reflect the current controversy surrounding the investigation of GPCR dimerisation. Although GHS-R1a/GHS-R1b or GHS-R1a/GPR39 heterodimerisation was not clearly demonstrated, this study provides a basis for future investigations of these receptors in prostate cancer. Additionally, the results presented in this study and growing evidence in the literature highlight the requirement for an extensive understanding of the experimental method and the performance of a range of controls to avoid the spurious interpretation of data gained from artificial expression systems. The future development of more robust techniques for investigating GPCR dimerisation is clearly required and will enable us to elucidate whether GHS-R1a, GHS-R1b and GPR39 form physiologically relevant dimers.
Resumo:
It is recognized that, in general, the performance of construction projects does not meet optimal expectations. One aspect of this is the performance of each participant, which is interdependent and makes a significance impact on overall project outcomes. Of these, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely time, cost and quality. As the level of satisfaction is a subjective measurement, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in attempting to determine the performance of construction project outcomes – for instance client satisfaction, consultant satisfaction, contractor satisfaction, customer satisfaction and home buyer satisfaction. These not only identify the performance of the construction project, but are also used to improve and maintain relationships. In addition, these assessments are necessary for continuous improvement and enhanced cooperation between participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparison standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This paper examines the current methods commonly practiced in measuring satisfaction level and the advantages of promoting these methods. The results provided are a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods for use in identifying the performance of project outcomes.
Resumo:
The outcomes of the construction projects can be evaluated in numerous ways. One method is to measure the satisfaction of participants as represented by the differences between their expectations and perceptions. This measurement is used widely in construction as it promises benefits, such as the improvement of product delivery, and enhances services quality by identifying some necessary changes. Commonly satisfaction measurement is gauged by evaluating the level of client satisfaction of construction performance. The measurement of customer satisfaction on the other hand, is based on the quality of the end product. This evaluation is used to encourage contractors to improve their performance to a required level and to ensure that the projects are delivered as expected- in terms of time, budget and quality. Several studies of performance measurement have indicated that contractor performance is still not satisfactory, as the outcome delivered is not as required (because of cost overruns, time overruns or because it is generally unsatisfactory). This drawback may be due to the contractors’ lack of expertise, motivation and/or satisfaction. The measurement of performance based on contractor satisfaction levels is still new and very few studies have yet taken place in the construction industry. This paper examines how the characteristics of a contracting organisation – namely its experience in the industry, background, past performance, size of organisation and financial stability- may influence its satisfaction levels with regards to project performance. Previous literature reviews and interviews are used as research tools in the preliminary investigation. The outcome is expected to present a basic understanding of contractor satisfaction measurement and its potential for improving the performance of project outcomes.
Resumo:
In Australia and other developed countries there is poor adherence to guidelines recommending the introduction of complementary feeding to infants at 6 months of age. We aimed to investigate, via adopting a theory of planned behaviour framework and incorporating additional normative and demographic influences, mothers’ complementary feeding intentions and behaviour. Participants were 375 primiparas who completed an initial questionnaire (infant age 13±3weeks) that assessed the theory of planned behaviour constructs of attitude, subjective norm, and perceived behavioural control, as well as group norm and additional maternal and infant variables of mothers’ age, education level, weight status perception, current maternal feeding practices, and infant birth weight. Approximately, 3 months after completion of the main questionnaire, mothers completed a follow-up questionnaire that assessed the age in months at which the infant was first introduced to solids. The theory of planned behaviour variables of attitude and subjective norm, along with group norm, predicted intentions, with intention, mothers’ age (older more likely), and weight status perception (overweight less likely) predicting behaviour. Overall, the results highlight the importance of attitudes, normative influences, and individual characteristics in complementary feeding decision-making which should be considered when designing interventions aimed at improving adherence to current maternal feeding guidelines.
Resumo:
This paper reports a study investigating the effect of individual cognitive styles on learning through computer-based instruction. The study adopted a quasi-experimental design involving four groups which were presented with instructional material that either matched or mismatched with their preferred cognitive styles. Cognitive styles were measured by cognitive style assessment software (Riding, 1991). The instructional material was designed to cater for the four cognitive styles identified by Riding. Students' learning outcomes were measured by the time taken to perform test tasks and the number of marks scored. The results indicate no significant difference between the matched and mismatched groups on both time taken and scores on test tasks. However, there was significant difference between the four cognitive styles on test score. The Wholist/Verbaliser group performed better then all other groups. There was no significant difference between the other groups. An analysis of the performance on test task by each cognitive style showed significant difference between the groups on recall, labelling and explanation. Difference between the cognitive style groups did not reach significance level for problem-solving tasks. The findings of the study indicate a potential for cognitive style to influence learning outcomes measured by performance on test tasks.
Resumo:
This project was a step forward in the examination and identification of key variables on the perception, decision making and action of team sport athletes through theoretical insights provided by the ecological dynamics perspective. The methodology drew on experiential knowledge of elite coaches to drive further empirical investigation into the specific task, environmental and personal constraints that shape the behaviour of athletes in specific performance contexts. The thesis has provided an effective rationale for further investigation into the emergent perception, decision making and action demanded of athletes in these unpredictable, fluent, fast-paced environments.
Resumo:
The reduction of CO2 emissions and social exclusion are two key elements of UK transport strategy. Despite intensive research on each theme, little effort has so far been made linking the relationship between emissions and social exclusion. In addition, current knowledge on each theme is limited to urban areas; little research is available on these themes for rural areas. This research contributes to this gap in the literature by analysing 157 weekly activity-travel diary data collected from three case study areas with differential levels of area accessibility and area mobility options, located in rural Northern Ireland. Individual weekly CO2 emission levels from personal travel diaries (both hot exhaust emission and cold-start emission) were calculated using average speed models for different modes of transport. The socio-spatial patterns associated with CO2 emissions were identified using a general linear model whereas binary logistic regression analyses were conducted to identify mode choice behaviour and activity patterns. This research found groups that emitted a significantly lower level of CO2 included individuals living in an area with a higher level of accessibility and mobility, non-car, non-working, and low-income older people. However, evidence in this research also shows that although certain groups (e.g. those working, and residing in an area with a lower level of accessibility) emitted higher levels of CO2, their rate of participation in activities was however found to be significantly lower compared to their counterparts. Based on the study findings, this research highlights the need for both soft (e.g. teleworking) and physical (e.g. accessibility planning) policy measures in rural areas in order to meet government’s stated CO2 reduction targets while at the same time enhancing social inclusion.
Resumo:
Motivation is a major driver of project performance. Despite team member ability to deliver successful project outcomes if they are not positively motivated to pursue joint project goals, then performance will be constrained. One approach to improving the motivation of project organizations is by offering a financial reward for the achievement of set performance standards above a minimum required level. However, little investigation has been undertaken into the features of successful incentive systems as a part of an overall delivery strategy. With input from organizational management literature, and drawing on the literature covering psychological and economic theories of motivation, this paper presents an integrated framework that can be used by project organizations to assess the impact of financial reward systems on motivation in construction projects. The integrated framework offers four motivation indicators which reflect key theoretical concepts across both psychological and economic disciplines. The indicators are: (1) Goal Commitment, (2) Distributive Justice, (3) Procedural Justice, and (4) Reciprocity. The paper also interprets the integrated framework against the results of a successful Australian social infrastructure project case study and identifies key learning’s for project organizations to consider when designing financial reward systems. Case study results suggest that motivation directed towards the achievement of incentive goals is influenced not only by the value placed on the financial reward for commercial benefit, but also driven by the strength of the project initiatives that encourage just and fair dealings, supporting the establishment of trust and positive reciprocal behavior across a project team. The strength of the project relationships was found to be influenced by how attractive the achievement of the goal is to the incentive recipient and how likely they were to push for the achievement of the goal. Interestingly, findings also suggested that contractor motivation is also influenced by the fairness of the performance measurement process and their perception of the trustworthiness and transparency of their client. These findings provide the basis for future research on the impact of financial reward systems on motivation in construction projects. It is anticipated that such research will shed new light on this complex topic and further define how reward systems should be designed to promote project team motivation. Due to the unique nature of construction projects with high levels of task complexity and interdependence, results are expected to vary in comparison to previous studies based on individuals or single-entity organizations.
Resumo:
Australian, Iranian and Portuguese university students (N = 967) completed University Students Depression Inventory (USDI; Khawaja & Bryden, 2006) in English, Persian, and Portuguese languages respectively. A series of MANOVA were used to examine differences in depression symptoms as an effect of the country and demographic variables. Interactions were also examined. The results indicated that country, gender, and year level had some impact on the depressive symptoms of the university students. Australian students were more depressed than the Iranian and Portuguese students, while Iranian students were more depressed than the Portuguese students. Subscales of USDI: Lethargy, Motivation, and Cognitive/Emotional were also used to compare the depressive symptoms of students. The Australian female students reported a significantly higher level of lethargy than their male counterparts. Similarly, the first year male students from Iran were significantly more lethargic than the first year Iranian female students. Iranian and Portuguese male students, compared to the female students of these countries, experienced a lower level of motivation. The Australian and Iranian students, compared to the Portuguese students, reported a significantly higher level of cognitive and affective symptoms. The scores on the Cognitive/Emotional subscale increased with the year level. Differences among students’ depression are described and implications discussed.
Resumo:
Management (or perceived mismanagement) of large-scale, complex projects poses special problems and often results in spectacular failures, cost overruns, time blowouts and stakeholder dissatisfaction. While traditional project management responds with increasingly administrative constraints, we argue that leaders of such projects also need to display adaptive and enabling behaviours to foster adaptive processes, such as opportunity recognition, which requires an interaction of cognitive and affective processes of individual, project, and team leader attributes and behaviours. At the core of this model we propose is an interaction of cognitive flexibility, affect and emotional intelligence. The result of this interaction is enhanced leader opportunity recognition that, in turn, facilitates multilevel outcomes.
Resumo:
In an attempt to enhance the efficiency, productivity and competitiveness of today’s Architectural, Engineering, and Contractor (AEC) industry, this paper summarises the current status of an ongoing PhD research investigation in developing a sustainable AEC industry specific best-practice ‘Innovation-driven Change Framework’—more specifically a summation of the ‘fourth interrelated dynamic’ (culture). Leveraging off the outcomes of a two year industry and government supported Cooperative Research Centre for Construction Innovation (CRCCI) research project, as well as referring to recent internationally renowned case studies and related literature investigations, this research investigation includes further identifying, processing, analysing and categorizing various culture change methods, models, frameworks and processes utilized within the AEC and other industry sectors, and incorporating these findings in developing an AEC industry-specific ‘Innovation-driven Change Framework’
Resumo:
The paper provides an academic/practitioner collaborative reflection on the governance structure of a prominent New Zealand regional tourism organisation (RTO). The purpose is to address one of the neglected areas of tourism governance research; which is ‘Who’ governs the destination? The paper discusses the evolution of a public-private governance structure from the perspective of three former senior staff members. The authors were employed during a period of radical organisational change in the administration of the marketing of Rotorua, one of New Zealand’s leading resort destinations. The paper uses archival analysis and personal reflections, and concludes with a summary of key challenges and frustrations inherent in the complexity of public-private partnership (PPP) governance of an RTO. It is envisaged this summary of reflections will enhance tourism management students’ understanding of the complex and political nature of destination marketing organisation (DMO) governance at a local level.
Resumo:
Although the design-build (DB) system has been demonstrated to be an effective delivery method and has gained popularity worldwide, it has not gained the same popularity in the construction market of China. The objective of this study was, theretofore, to investigate the barriers to entry in the DB market. A total of 22 entry barriers were first identified through an open-ended questionnaire survey with 15 top construction professionals in the construction market of China. A broad questionnaire survey was further conducted to prioritize these entry barriers. Statistical analysis of responses shows that the most dominant barriers to entry into the DB market are, namely, lack of design expertise, lack of interest from owners, lack of suitable organization structure, lack of DB specialists, and lack of credit record system. Analysis of variance indicates that there is no difference of opinions among the respondent groups of academia, government departments, state-owned company, and private company, at the 5% significance level, on most of the barriers to entry. Finally, the underlying dimensions of barriers to entry in the DB market were investigated through factor analysis. The results indicate that there are six major underlying dimensions of entry barriers in DB market, which include, namely, the competence of design-builders, difficulty in project procurement, characteristics of DB projects, lack of support from public sectors, the competence of DB owners, and the immaturity of DB market. These findings are useful for both potential and incumbent design-builders to understand and analyze the DB market in China.