996 resultados para mega-projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose---The aim of this study is to identify complexity measures for building projects in the People’s Republic of China (PRC). Design/Methodology/Approach---A three-round of Delphi questionnaire survey was conducted to identify the key parameters that measure the degree of project complexity. A complexity index (CI) was developed based on the identified measures and their relative importance. Findings---Six key measures of project complexity have been identified, which include, namely (1) building structure & function; (2) construction method; (3) the urgency of the project schedule; (4) project size/scale; (5) geological condition; and (6) neighboring environment. Practical implications---These complexity measures help stakeholders assess degrees of project complexity and better manage the potential risks that might be induced to different levels of project complexity. Originality/Value---The findings provide insightful perspectives to define and understand project complexity. For stakeholders, understanding and addressing the complexity help to improve project planning and implementation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Modern project management had its genesis in the field of operations research in the late 1940s, but today it is a much more diverse subject. It has evolved and developed a much wider range of methods, techniques, and skills that the project manager can draw upon. Not all these skills are relevant to every project, but an assortment of them will be relevant to most. This book aims to describe for students, researchers and managers the full range of skills that project managers can use to develop their methodologies.The authors group the skills into nine perspectives, representing nine schools of project management research and theory. By attaching a metaphor to each of these perspectives, students, researchers and managers are better able to understand each approach and decide whether it is best suited to the development of a strategy for managing their project. Perspectives on Projects builds upon the various theoretical orientations that the field of project management has developed. Featuring several case studies, drawn from a variety of settings, to illustrate how the different schools can provide different perspectives on projects, this book is an ideal text for anyone involved in project management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project management is increasingly regarded as a strategic competency because projects play an active part in defining an organization’s relationship to its environment. It is now widely accepted that projects and programmes are at the centre of strategy implementation. However, the conditions and underlying assumptions of this dynamic relationship are still unclear. This paper aims to clarify the dynamics of the strategy process, by defining traditional approaches (corporate/business) and introducing three strategy core logics (archetypes). Building on this 'archetypology' the authors demonstrate how project management, through enactment and sense-making of strategy, enables organizations to face the challenge of complexity and uncertainty. While recognizing that the "traditional" methods of analysis and management remain valid under certain conditions, this paper offers new avenues of reflection concerning the necessary contextualization of the project management approaches in order to ensure coherence between archetypes, enactment, learning and decision-making.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public participate in the planning and design of major public infrastructure and construction (PIC) projects is crucial to their success, as the interests of different stakeholders can be systematically captured and built into the finalised scheme. However, public participation may not always yield a mutually acceptable solution, especially when the interests of stakeholders are diverse and conflicting. Confrontations and disputes can arise unless the concerns or needs of the community are carefully analysed and addressed. The aim of the paper is to propose a systematic method of analysing stakeholder concerns relating to PIC projects by examining the degree of consensus and/or conflict involved. The results of a questionnaire survey and a series of interviews with different entities are provided, which indicate the existence of a significant divergence of views among stakeholder groups and that conflicts arise when there is a mismatch between peoples’ perception concerning money and happiness on the one hand and development and damages on the other. Policy and decision-makers should strive to resolve at least the majority of conflicts that arise throughout the lifecycle of major PIC projects so as to maximise their chance of success.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Safety culture is a concept that has long been accepted in high risk industries such as aviation, nuclear industries and mining, however, considerable research is now also being undertaken within the construction sector. This paper discusses three recent interlocked projects undertaken in the Australian construction industry. The first project examined the development and implementation of a safety competency framework targeted at safety critical positions (SCP's) across first tier construction organisations. Combining qualitative and quantitative methods, the project: developed a matrix of SCP's (n=11) and safety management tasks (SMTs; n=39); mapped the process steps for their acquisition and development; detailed the knowledge, skills and behaviours required for all SMTs; and outlined potential organisational cultural outcomes from a successful implementation of the framework. The second project extended this research to develop behavioural guidelines for leaders to drive safety culture change down to second tier companies and to assist them to customise their own competency framework and implementation guidelines to match their aspirations and resources. The third interlocked project explored the use of safety effectiveness indicators (SEIs) as an industry-relevant assessment tool for reducing risk on construction sites. With direct linkages to safety competencies and SMT's, the SEIs are the next step towards an integrated safety cultural approach to safety and extend the concept of positive performance indicators (PPIs) by providing a valid, reliable, and user friendly measurement platform. Taken together, the results of the interlocked projects suggest that industry engaged collaborative safety culture research has many potential benefits for the construction industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to the many advantages offered on projects by such systems. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. In order to provide evidence of the benefits of DB, it is essential to identify the factors that can contribute to successful DB implementation and this paper aims to provide evidence of such factors that can promote the successful implementation of DB project delivery systems on Indonesian road infrastructure projects. Four main factors and 28 indicators were identified from an extensive literature review, and a Delphi questionnaire survey was conducted amongst 20 experts drawn from the Indonesian road infrastructure construction sector. The first round Delphi study found that regulation, competency of clients, ability to manage DB projects and external conditions were the major factors that can promote successful DB implementation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Product innovation is an important contributor to the performance of infrastructure projects in the construction industry. Maximizing the potential for innovative product adoption is a challenging task due to the complexities of the construction innovation system. A qualitative methodology involving interviews with major construction project stakeholders is employed to address the research question: ‘What are the main obstacles to the adoption of innovative products in the road industry?’ The characteristics of six key product innovation obstacles in Australian road projects are described. The six key obstacles are: project goal misalignment, client pressures, weak contractual relations, lack of product trialling, inflexible product specifications and product liability concerns. A snapshot of the dynamics underlying these obstacles is provided. There are few such assessments in the literature, despite the imperative to improve construction innovation rates globally in order to deliver road infrastructure projects of increasing size and complexity. Key obstacles are interpreted through an open innovation construct, providing direction for policy to enhance the uptake of innovation across the construction product supply network. Early evidence suggests the usefulness of an open innovation construct that integrates three conceptual lenses: network governance, absorptive capacity and knowledge intermediation, in order to interpret product adoption obstacles in the context of Australian road infrastructure projects. The paper also provides practical advice and direction for government and industry organizations that wish to promote the flow of innovative product knowledge across the construction supply network.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many governments world-wide are increasingly encouraging the involvement of interested individuals, groups and organisations in their publicinfrastructure and construction (PIC) projects as a means of improving the openness, transparency and accountability of the decision-making process and help improve the projects’ long-term viability and benefits to the community. In China, however, the current participatory mechanism at the project level exists only as part of the environmental impact assessment (EIA) process. With an increasing demand for PIC projects and social equality in China, this suggests a need to bring the participatory process into line with international practice. The aim of this paper, therefore, is to identify the weaknesses of EIA-basedpublicparticipation in China and the means by which it may be improved for the whole lifecycle of PIC schemes. To do this, the results of a series of interviews with a diverse group of experts is reported which analyse the nature and extent of existing problems of publicparticipation in EIA and suggestions for improvement. These indicate that the current level of participation in PIC projects is quite limited, particularly in the crucial earlier stages, primarily due to traditional culture and values, uneven progress in the adoption of participatory mechanisms, the risk of not meeting targets and lack of confidence in public competence. Finally, aprocess flowchart is proposed to guide construction practitioners and the community in general.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Despite a general belief that incentive mechanisms can improve value for money during procurement and performance during project execution, empirical research on the actual effects is nascent. This research focuses on the design and implementation of incentive mechanisms in four different infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on an analytical framework of key motivation drivers, a cross cases analysis is conducted in view of performance on the contract assumptions, selection phase, execution phase and project contract performance. It was identified that despite significant differences in the project characteristics, results indicate that they experience similar contextual drivers on the incentive effectiveness. High value was placed on risk allocation and relationship building in the selection and construction phase. The differences can be explained from both contextual and project related characteristics. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the nature of incentive systems across different geographical and contextual boundaries in future research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-build (DB) system is well-known to be a popular and effective delivery method of construction work worldwide. It has been demonstrated as superior to the traditional delivery system in regards to time and cost performance. However, it suffers a major flaw, in that the performance of project quality cannot be guaranteed. This paper aims to investigate the underlying factors attributing to the poor quality performance of design-build projects in Queensland. Five major factors were first identified through a comprehensive literature review, which relate to (1) project briefing and scope definition, (2) client’s role and responsibility, (3) procurement selection, (4) contractor’s incentive, and (5) design document quality. A questionnaire survey with 127 DB professionals was conducted to determine how these factors affect various quality criteria, i.e. functional quality, architectural quality, technical quality, workmanship quality, client satisfaction and overall quality. With the architectural quality reduced greatly, the research findings reveal that the DB projects in Queensland have the reduced overall quality compared with traditional projects. The impacts of different factors on the quality performance of DB projects have been closely examined and summarized. The research findings will facilitate project stakeholder’s better understanding of the delivery process of the DB system and provide guidelines to improve the quality performance.