991 resultados para electricity generating cost


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Being able to transport electricity seamlessly across borders is essential for achieving three major European Union energy policy goals: (1) enabling competition between national energy companies, (2) cost-effective roll-out of renewables,and (3) security of supply. However, neither the market design nor the framework for infrastructure investment proposed by the European Commission is adequate for enabling free flows of electricity within the EU.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The most straightforward European single energy market design would entail a European system operator regulated by a single European regulator. This would ensure the predictable development of rules for the entire EU, significantly reducing regulatory uncertainty for electricity sector investments. But such a first-best market design is unlikely to be politically realistic in the European context for three reasons. First, the necessary changes compared to the current situation are substantial and would produce significant redistributive effects. Second, a European solution would deprive member states of the ability to manage their energy systems nationally. And third, a single European solution might fall short of being well-tailored to consumers’ preferences, which differ substantially across the EU. To nevertheless reap significant benefits from an integrated European electricity market, we propose the following blueprint: First, we suggest adding a European system-management layer to complement national operation centres and help them to better exchange information about the status of the system, expected changes and planned modifications. The ultimate aim should be to transfer the day-to-day responsibility for the safe and economic operation of the system to the European control centre. To further increase efficiency, electricity prices should be allowed to differ between all network points between and within countries. This would enable throughput of electricity through national and international lines to be safely increased without any major investments in infrastructure. Second, to ensure the consistency of national network plans and to ensure that they contribute to providing the infrastructure for a functioning single market, the role of the European ten year network development plan (TYNDP) needs to be upgraded by obliging national regulators to only approve projects planned at European level unless they can prove that deviations are beneficial. This boosted role of the TYNDP would need to be underpinned by resolving the issues of conflicting interests and information asymmetry. Therefore, the network planning process should be opened to all affected stakeholders (generators, network owners and operators, consumers, residents and others) and enable the European Agency for the Cooperation of Energy Regulators (ACER) to act as a welfare-maximising referee. An ultimate political decision by the European Parliament on the entire plan will open a negotiation process around selecting alternatives and agreeing compensation. This ensures that all stakeholders have an interest in guaranteeing a certain degree of balance of interest in the earlier stages. In fact, transparent planning, early stakeholder involvement and democratic legitimisation are well suited for minimising as much as possible local opposition to new lines. Third, sharing the cost of network investments in Europe is a critical issue. One reason is that so far even the most sophisticated models have been unable to identify the individual long-term net benefit in an uncertain environment. A workable compromise to finance new network investments would consist of three components: (i) all easily attributable cost should be levied on the responsible party; (ii) all network users that sit at nodes that are expected to receive more imports through a line extension should be obliged to pay a share of the line extension cost through their network charges; (iii) the rest of the cost is socialised to all consumers. Such a cost-distribution scheme will involve some intra-European redistribution from the well-developed countries (infrastructure-wise) to those that are catching up. However, such a scheme would perform this redistribution in a much more efficient way than the Connecting Europe Facility’s ad-hoc disbursements to politically chosen projects, because it would provide the infrastructure that is really needed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"June 15, 1975."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper proposes a transmission and wheeling pricing method based on the monetary flow tracing along power flow paths: the monetary flow-monetary path method. Active and reactive power flows are converted into monetary flows by using nodal prices. The method introduces a uniform measurement for transmission service usages by active and reactive powers. Because monetary flows are related to the nodal prices, the impacts of generators and loads on operation constraints and the interactive impacts between active and reactive powers can be considered. Total transmission service cost is separated into more practical line-related costs and system-wide cost, and can be flexibly distributed between generators and loads. The method is able to reconcile transmission service cost fairly and to optimize transmission system operation and development. The case study on the IEEE 30 bus test system shows that the proposed pricing method is effective in creating economic signals towards the efficient use and operation of the transmission system. (c) 2005 Elsevier B.V. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Like any other natural resources, hydro resources that are capable of generating electricity at cheaper cost give rise to economic rent. Nepal possesses huge amount of such cheaper hydro resources which is far in excess of the domestic demand. The existing rents levied by the governments are not found to address the potential value of resources. In this study hydro rent is calculated for two types of hydropower projects: (i) domestic demand oriented project and (ii) large and export oriented project. In doing so, the study uses the concept of hydro rent as a measure of cost savings achievable by the use of hydro resources over the least cost alternatives. The WASP-III+ optimisation software developed by IAEA has been used to derive two least cost generation expansion plans i.e. one with and the other without the nominated hydro resource. The difference in the costs of two plans gives the rent of the hydro resource.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Ancillary service plays a key role in maintaining operation security of the power system in a competitive electricity market. The spinning reserve is one of the most important ancillary services that should be provided effectively. This paper presents the design of an integrated market for energy and spinning reserve service with particular emphasis on coordinated dispatch of bulk power and spinning reserve services. A new market dispatching mechanism has been developed to minimize the cost of service while maintaining system security. Genetic algorithms (GA) are used for finding the global optimal solutions for this dispatch problem. Case studies and corresponding analyses have been carried out to demonstrate and discuss the efficiency and usefulness of the proposed method.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of the thesis was to analyse several process configurations for the production of electricity from biomass. Process simulation models using AspenPlus aimed at calculating the industrial performance of power plant concepts were built, tested, and used for analysis. The criteria used in analysis were performance and cost. All of the advanced systems appear to have higher efficiencies than the commercial reference, the Rankine cycle. However, advanced systems typically have a higher cost of electricity (COE) than the Rankine power plant. High efficiencies do not reduce fuel costs enough to compensate for the high capital costs of advanced concepts. The successful reduction of capital costs would appear to be the key to the introduction of the new systems. Capital costs account for a considerable, often dominant, part of the cost of electricity in these concepts. All of the systems have higher specific investment costs than the conventional industrial alternative, i.e. the Rankine power plant; Combined beat and power production (CUP) is currently the only industrial area of application in which bio-power costs can be considerably reduced to make them competitive. Based on the results of this work, AsperiPlus is an appropriate simulation platform. How-ever, the usefulness of the models could be improved if a number of unit operations were modelled in greater detail. The dryer, gasifier, fast pyrolysis, gas engine and gas turbine models could be improved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is considerable concern over the increased effect of fossil fuel usage on the environment and this concern has resulted in an effort to find alternative, environmentally friendly energy sources. Biomass is an available alternative resource which may be converted by flash pyrolysis to produce a crude liquid product that can be used directly to substitute for conventional fossil fuels or upgraded to a higher quality fuel. Both the crude and upgraded products may be utilised for power generation. A computer program, BLUNT, has been developed to model the flash pyrolysis of biomass with subsequent upgrading, refining or power production. The program assesses and compares the economic and technical opportunities for biomass thermochemical conversion on the same basis. BLUNT works by building up a selected processing route from a number of process steps through which the material passes sequentially. Each process step has a step model that calculates the mass and energy balances, the utilities usage and the capital cost for that step of the process. The results of the step models are combined to determine the performance of the whole conversion route. Sample results from the modelling are presented in this thesis. Due to the large number of possible combinations of feeds, conversion processes, products and sensitivity analyses a complete set of results is impractical to present in a single publication. Variation of the production costs for the available products have been illustrated based on the cost of a wood feedstock. The effect of selected macroeconomic factors on the production costs of bio-diesel and gasoline are also given.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A number of papers and reports covering the techno-economic analysis of bio-oil production has been published. These have had different scopes, use different feedstocks and reflected national cost structures. This paper reviews and compares their cost estimates and the experimental results that underpin them. A comprehensive cost and performance model was produced based on consensus data from the previous studies or stated scenarios where data is not available that reflected UK costs. The model takes account sales of bio-char that is a co-product of pyrolysis and the electricity consumption of the pyrolysis plant and biomass pre-processing plants. It was concluded that it should be able to produce bio-oil in the UK from energy crops for a similar cost as distillate fuel oil. It was also found that there was little difference in the processing cost for woodchips and baled miscanthus. © 2011 Elsevier Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There are several methods of providing series compensation for transmission lines using power electronic switches. Four methods of series compensation have been examined in this thesis, the thyristor controlled series capacitor, a voltage sourced inverter series compensator using a capacitor as the series element, a current sourced inverter series compensator and a voltage sourced inverter using an inductor as the series element. All the compensators examined will provide a continuously variable series voltage which is controlled by the switching of the electronic switches. Two of the circuits will offer both capacitive and inductive compensation, the thyristor controlled series capacitor and the current sourced inverter series compensator. The other two will produce either capacitive or inductive series compensation. The thyristor controlled series capacitor offers the widest range of series compensation. However, there is a band of unavailable compensation between 0 and 1 pu capacitive compensation. Compared to the other compensators examined the harmonic content of the compensating voltage is quite high. An algebraic analysis showed that there is more than one state the thyristor controlled series capacitor can operate in. This state has the undesirable effect of introducing large losses. The voltage sourced inverter series compensator using a capacitor as the series element will provide only capacitive compensation. It uses two capacitors which increase the cost of the compensator significantly above the other three. This circuit has the advantage of very low harmonic distortion. The current sourced inverter series compensator will provide both capacitive and inductive series compensation. The harmonic content of the compensating voltage is second only to the voltage sourced inverter series compensator using a capacitor as the series element. The voltage sourced inverter series compensator using an inductor as the series element will only provide inductive compensation, and it is the least expensive compensator examined. Unfortunately, the harmonics introduced by this circuit are considerable.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis analyses the impact of deregulation on the theory and practice of investment decision making in the electricity sector and appraises the likely effects on its long term future inefficiency. Part I describes the market and its shortcomings in promoting an optimal generation margin and plant mix and in reducing prices through competition. A full size operational model is developed to simulate hour by hour operation of the market and analyse its features. A relationship is established between the SMP and plant mix and between the LOLP and plant margin and it is shown bow a theoretical optimum can be derived when the combined LOLP payments and the capital costs of additional generation reach a minimum. A comparison of prices against an idealised bulk supply tariff is used to show how energy prices have risen some 12% in excess of what might have occurred under the CEGB regime. This part concludes with proposals to improve the marlcosting principles are described and a new model is developed to demonstrate bow a generator may strike supply agreements either side of an interconnector to influence prices so as to maximise his income. The optimal pricing strategy for the transmitter is also derived and consumer response is simulated .The concept of transmission uplift is developed and the operational model is extended to include transmission constraints and then used to establish monthly incremental transmission constraint cost functions. It is shown how these can be used to appraise investment options and optimally plan outages. Part 4 concludes by discussing the regulatory framework and its limitations in improving efficiency or encouraging the optimum levels of investment. The principal findings of the thesis are reviewed and potential market improvement are described. This part concludes with a discussion of alternative market structures and likely future developments.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis investigates the cost of electricity generation using bio-oil produced by the fast pyrolysis of UK energy crops. The study covers cost from the farm to the generator’s terminals. The use of short rotation coppice willow and miscanthus as feedstocks was investigated. All costs and performance data have been taken from published papers, reports or web sites. Generation technologies are compared at scales where they have proved economic burning other fuels, rather than at a given size. A pyrolysis yield model was developed for a bubbling fluidised bed fast pyrolysis reactor from published data to predict bio-oil yields and pyrolysis plant energy demands. Generation using diesel engines, gas turbines in open and combined cycle (CCGT) operation and steam cycle plants was considered. The use of bio-oil storage to allow the pyrolysis and generation plants to operate independently of each other was investigated. The option of using diesel generators and open cycle gas turbines for combined heat and power was examined. The possible cost reductions that could be expected through learning if the technology is widely implemented were considered. It was found that none of the systems analysed would be viable without subsidy, but with the current Renewable Obligation Scheme CCGT plants in the 200 to 350 MWe range, super-critical coal fired boilers co-fired with bio-oil, and groups of diesel engine based CHP schemes supplied by a central pyrolysis plant would be viable. It was found that the cost would reduce with implementation and the planting of more energy crops but some subsidy would still be needed to make the plants viable.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Greenhouse cultivation is an energy intensive process therefore it is worthwhile to introduce energy saving measures and alternative energy sources. Here we show that there is scope for energy saving in fan ventilated greenhouses. Measurements of electricity usage as a function of fan speed have been performed for two models of 1.25 m diameter greenhouse fans and compared to theoretical values. Reducing the speed can cut the energy usage per volume of air moved by more than 70%. To minimize the capital cost of low-speed operation, a cooled greenhouse has been built in which the fan speed responds to sunlight such that full speed is reached only around noon. The energy saving is about 40% compared to constant speed operation. Direct operation of fans from solar-photovoltaic modules is also viable as shown from experiments with a fan driven by a brushless DC motor. On comparing the Net Present Value costs of the different systems over a 10 year amortization period (with and without a carbon tax to represent environmental costs) we find that sunlight-controlled system saves money under all assumptions about taxation and discount rates. The solar-powered system, however, is only profitable for very low discount rates, due to the high initial capital costs. Nonetheless this system could be of interest for its reliability in developing countries where mains electricity is intermittent. We recommend that greenhouse fan manufacturers improve the availability of energy-saving designs such as those described here.