911 resultados para Transmission power systems


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, an efficient genetic algorithm (GA) is presented to solve the problem of multistage and coordinated transmission expansion planning. This is a mixed integer nonlinear programming problem, difficult for systems of medium and large size and high complexity. The GA presented has a set of specialized genetic operators and an efficient form of generation of the initial population that finds high quality suboptimal topologies for large size and high complexity systems. In these systems, multistage and coordinated planning present a lower investment than static planning. Tests results are shown in one medium complexity system and one large size high complexity system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A metaheuristic technique for solving the short-term transmission network expansion and reactive power planning problems, at the same time, in regulated power systems using the AC model is presented. The problem is solved using a real genetic algorithm (RGA). For each topology proposed by RGA an indicator is employed to identify the weak buses for new reactive power sources allocation. The fitness function is calculated using the cost of each configuration as well as constraints deviation of an AC optimal power flow (OPF) in which the minimum reactive generation of new reactive sources and the active power losses are objectives. With allocation of reactive power sources at load buses, the circuit capacity increases and the cost of installation could be decreased. The method is tested in a well known test system, presenting good results when compared with other approaches. © 2011 IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The hydroelectric power plant Hidroltuango represents a major expansion for the Colombian electrical system (with a total capacity of 2400 MW). This paper analyzes the possible interconnections and investments involved in connecting Hidroltuango, in order to strengthen the Colombian national transmission system. A Mixed Binary Linear Programming (MBLP) model was used to solve the Multistage Transmission Network Expansion Planning (MTEP) problem of the Colombian electrical system, taking the N-1 safety criterion into account. The N-1 safety criterion indicates that the transmission system must be expanded so that the system will continue to operate properly if an outage in a system element (within a pre-defined set of contingencies) occurs. The use of a MBLP model guaranteed the convergence with existing classical optimization methods and the optimal solution for the MTEP using commercial solvers. Multiple scenarios for generation and demand were used to consider uncertainties within these parameters. The model was implemented using the algebraic modeling language AMPL and solved using the commercial solver CPLEX. The proposed model was then applied to the Colombian electrical system using the planning horizon of 2018-2025. (C) 2014 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The European Union continues to exert a large influence on the direction of member states energy policy. The 2020 targets for renewable energy integration have had significant impact on the operation of current power systems, forcing a rapid change from fossil fuel dominated systems to those with high levels of renewable power. Additionally, the overarching aim of an internal energy market throughout Europe has and will continue to place importance on multi-jurisdictional co-operation regarding energy supply. Combining these renewable energy and multi-jurisdictional supply goals results in a complicated multi-vector energy system, where the understanding of interactions between fossil fuels, renewable energy, interconnection and economic power system operation is increasingly important. This paper provides a novel and systematic methodology to fully understand the changing dynamics of interconnected energy systems from a gas and power perspective. A fully realistic unit commitment and economic dispatch model of the 2030 power systems in Great Britain and Ireland, combined with a representative gas transmission energy flow model is developed. The importance of multi-jurisdictional integrated energy system operation in one of the most strategically important renewable energy regions is demonstrated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Power flow calculations are one of the most important tools for power system planning and operation. The need to account for uncertainties when performing power flow studies led, among others methods, to the development of the fuzzy power flow (FPF). This kind of models is especially interesting when a scarcity of information exists, which is a common situation in liberalized power systems (where generation and commercialization of electricity are market activities). In this framework, the symmetric/constrained fuzzy power flow (SFPF/CFPF) was proposed in order to avoid some of the problems of the original FPF model. The SFPF/CFPF models are suitable to quantify the adequacy of transmission network to satisfy “reasonable demands for the transmission of electricity” as defined, for instance, in the European Directive 2009/72/EC. In this work it is illustrated how the SFPF/CFPF may be used to evaluate the impact on the adequacy of a transmission system originated by specific investments on new network elements

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A heuristic algorithm that employs fuzzy logic is proposed to the power system transmission expansion planning problem. The algorithm is based on the divide to conquer strategy, which is controlled by the fuzzy system. The algorithm provides high quality solutions with the use of fuzzy decision making, which is based on nondeterministic criteria to guide the search. The fuzzy system provides a self-adjusting mechanism that eliminates the manual adjustment of parameters to each system being solved. (C) 2010 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The design of supplementary damping controllers to mitigate the effects of electromechanical oscillations in power systems is a highly complex and time-consuming process, which requires a significant amount of knowledge from the part of the designer. In this study, the authors propose an automatic technique that takes the burden of tuning the controller parameters away from the power engineer and places it on the computer. Unlike other approaches that do the same based on robust control theories or evolutionary computing techniques, our proposed procedure uses an optimisation algorithm that works over a formulation of the classical tuning problem in terms of bilinear matrix inequalities. Using this formulation, it is possible to apply linear matrix inequality solvers to find a solution to the tuning problem via an iterative process, with the advantage that these solvers are widely available and have well-known convergence properties. The proposed algorithm is applied to tune the parameters of supplementary controllers for thyristor controlled series capacitors placed in the New England/New York benchmark test system, aiming at the improvement of the damping factor of inter-area modes, under several different operating conditions. The results of the linear analysis are validated by non-linear simulation and demonstrate the effectiveness of the proposed procedure.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Market-based transmission expansion planning gives information to investors on where is the most cost efficient place to invest and brings benefits to those who invest in this grid. However, both market issue and power system adequacy problems are system planers’ concern. In this paper, a hybrid probabilistic criterion of Expected Economical Loss (EEL) is proposed as an index to evaluate the systems’ overall expected economical losses during system operation in a competitive market. It stands on both investors’ and planner’s point of view and will further improves the traditional reliability cost. By applying EEL, it is possible for system planners to obtain a clear idea regarding the transmission network’s bottleneck and the amount of losses arises from this weak point. Sequentially, it enables planners to assess the worth of providing reliable services. Also, the EEL will contain valuable information for moneymen to undertake their investment. This index could truly reflect the random behaviors of power systems and uncertainties from electricity market. The performance of the EEL index is enhanced by applying Normalized Coefficient of Probability (NCP), so it can be utilized in large real power systems. A numerical example is carried out on IEEE Reliability Test System (RTS), which will show how the EEL can predict the current system bottleneck under future operational conditions and how to use EEL as one of planning objectives to determine future optimal plans. A well-known simulation method, Monte Carlo simulation, is employed to achieve the probabilistic characteristic of electricity market and Genetic Algorithms (GAs) is used as a multi-objective optimization tool.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Frequency deviation is a common problem for power system signal processing. Many power system measurements are carried out in a fixed sampling rate assuming the system operates in its nominal frequency (50 or 60 Hz). However, the actual frequency may deviate from the normal value from time to time due to various reasons such as disturbances and subsequent system transients. Measurement of signals based on a fixed sampling rate may introduce errors under such situations. In order to achieve high precision signal measurement appropriate algorithms need to be employed to reduce the impact from frequency deviation in the power system data acquisition process. This paper proposes an advanced algorithm to enhance Fourier transform for power system signal processing. The algorithm is able to effectively correct frequency deviation under fixed sampling rate. Accurate measurement of power system signals is essential for the secure and reliable operation of power systems. The algorithm is readily applicable to such occasions where signal processing is affected by frequency deviation. Both mathematical proof and numerical simulation are given in this paper to illustrate robustness and effectiveness of the proposed algorithm. Crown Copyright (C) 2003 Published by Elsevier Science B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The activity of Control Center operators is important to guarantee the effective performance of Power Systems. Operators’ actions are crucial to deal with incidents, especially severe faults like blackouts. In this paper, we present an Intelligent Tutoring approach for training Portuguese Control Center operators in tasks like incident analysis and diagnosis, and service restoration of Power Systems. Intelligent Tutoring System (ITS) approach is used in the training of the operators, having into account context awareness and the unobtrusive integration in the working environment. Several Artificial Intelligence techniques were criteriously used and combined together to obtain an effective Intelligent Tutoring environment, namely Multiagent Systems, Neural Networks, Constraint-based Modeling, Intelligent Planning, Knowledge Representation, Expert Systems, User Modeling, and Intelligent User Interfaces.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a coordination approach to maximize the total profit of wind power systems coordinated with concentrated solar power systems, having molten-salt thermal energy storage. Both systems are effectively handled by mixed-integer linear programming in the approach, allowing enhancement on the operational during non-insolation periods. Transmission grid constraints and technical operating constraints on both systems are modeled to enable a true management support for the integration of renewable energy sources in day-ahead electricity markets. A representative case study based on real systems is considered to demonstrate the effectiveness of the proposed approach. © IFIP International Federation for Information Processing 2015.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Most of distributed generation and smart grid research works are dedicated to network operation parameters studies, reliability, etc. However, many of these works normally uses traditional test systems, for instance, IEEE test systems. This paper proposes voltage magnitude and reliability studies in presence of fault conditions, considering realistic conditions found in countries like Brazil. The methodology considers a hybrid method of fuzzy set and Monte Carlo simulation based on the fuzzy-probabilistic models and a remedial action algorithm which is based on optimal power flow. To illustrate the application of the proposed method, the paper includes a case study that considers a real 12-bus sub-transmission network.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Langattoman laajakaistaisen tietoliikennetekniikan kehittyminen on herättänyt kiinnostuksen sen ammattimaiseen hyödyntämiseen yleisen turvallisuuden ja kriisinhallinnan tarpeisiin. Hätätilanteissa usein olemassa olevat kiinteät tietoliikennejärjestelmät eivät ole ollenkaan käytettävissä tai niiden tarjoama kapasiteetti ei ole riittävä. Tästä syystä on noussut esiin tarve nopeasti toimintakuntoon saatettaville ja itsenäisille langattomille laajakaistaisille järjestelmille. Tässä diplomityössä on tarkoitus tutkia langattomia ad hoc monihyppy -verkkoja yleisen turvallisuuden tarpeiden pohjalta ja toteuttaa testialusta, jolla voidaan demonstroida sekä tutkia tällaisen järjestelmän toimintaa käytännössä. Työssä tutkitaan pisteestä pisteeseen sekä erityisesti pisteestä moneen pisteeseen suoritettavaa tietoliikennettä. Mittausten kohteena on testialustan tiedonsiirtonopeus, lähetysteho ja vastaanottimen herkkyys. Näitä tuloksia käytetään simulaattorin parametreina, jotta simulaattorin tulokset olisivat mahdollisimman aidot ja yhdenmukaiset testialustan kanssa. Sen jälkeen valitaan valikoima yleisen turvallisuuden vaatimusten mukaisia ohjelmia ja sovellusmalleja, joiden suorituskyky mitataan erilaisten reititysmenetelmien alaisena sekä testialustalla että simulaattorilla. Tuloksia arvioidaan ja vertaillaan. Multicast monihyppy -video päätettiin sovelluksista valita tutkimusten pääkohteeksi ja sitä sekä sen ominaisuuksia on tarkoitus myös oikeissa kenttäkokeissa.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

All over the world power systems become bigger and bigger every day. New equipment is installed, new feeders are constructed, new power units are installed. Some old elements of the network, however, are not changed in time. As a result, “bottlenecks” for capacity transmission can occur. By locked power problem the situation when a power plant has installed capacity exceeding the power it can actually deliver is usually meant. Regime, scheme or even technical restrictions-related issues usually cause this kind of problem. It is really important, since from the regime point of view it is typical decision to have a mobile capacity reserve, in case of malfunctions. And, what can be even more significant, power plant owner (JSC Fortum in our case) losses his money because of selling less electrical energy. The goal of master`s thesis is to analyze the current state of Chelyabinsk power system and the CHP-3 (Combined Heat and Power plant) in particular in relation with it`s ability to deliver the whole capacity of the CHP in it`s existing state and also taking into consideration the prospect of power unit 3 installation by the fourth quarter of 2010. The thesis contains some general information about the UPS of Russia, CPS of Ural, power system of Chelyabinsk and the Chelyabinsk region itself. Then the CHP-3 is described from technical point of view with it`s equipment observation. Regimes for the nowadays power system and for the system after the power unit 3 installation are reviewed. The problems occurring are described and, finally, a solution is offered.