976 resultados para Refuse and refuse disposal -- Peru -- Lucre
Resumo:
Description based on: 1996 [10th annual report].
Resumo:
Description based on: April 1996 ; title from caption.
Resumo:
Description based on: 1991.
Resumo:
Mode of access: Internet.
Resumo:
"Application deadline: December 19, 2007"
Resumo:
"ILENR/AE-92/02."
Resumo:
"October 1991."
Resumo:
Item 1045-A, 1045-B (MF)
Resumo:
Shipping list no.: 91-756-P (pt. 1).
Resumo:
Mode of access: Internet.
Resumo:
"Serial no. 97-H66."
Resumo:
Construction and demolition waste management is becoming increasingly important on construction sites as landfill space in Ireland is rapidly depleting and waste management costs are rising. Due to these factors waste management plans are seen as a good response to minimising waste on site and this thesis aims to investigate how to implement such a plan on a practical case study as well as investigating the legislation regarding construction and demolition waste along with market availability for the reuse of the waste. Main contractor surveys were also carried out in order to gain a better understanding of current attitudes within the industry and these surveys are analysed in chapter five. A survey was also carried out among sub-contractors but this survey has not been used for this thesis as the study is on-going. The primary aim of this thesis is to examine the waste hierarchy opportunities that are available for construction and demolition waste in Ireland and to examine the effects of management strategies on construction and demolition waste reduction at the project level. A partnership was developed with Carey Developments Ltd in Co. Galway and an analysis of their waste management practices was undertaken. The primary case study will be the ‘Taylors Hill’ project in Co. Galway where work commenced in March, 2012. The secondary aim of the thesis is to develop specific waste minimisation strategies for the company and to develop a training tool kit for use on site.
Resumo:
This project focuses on the EU Landfill Directive targets for Biodegradable Municipal Waste (BMW) specifically focusing on how the targets will affect Ireland and its waste management infrastructure. Research will consist of reviewing relevant literature, legislation and policies that will provide a comparable between Ireland and other nations. Planning processes which govern both the building structure and running capacities of treatment facilities is also necessary in order to predict amounts of waste diverted from landfill. The efficiency of these treatment plants also requires investigation. Another objective is to research further information on Irelands organic ‘brown’ bin service, this will involve discovering the roll out of bins in the future over a defined time scale as well as the potential amounts of waste that will be collected. Figures received from waste management and waste treatment companies will be combined with figures from the Environmental Protection Agency’s (EPA) annual reports. This will give an indication to past trends and shed light on possible future trends. With this information annul waste volumes consigned to landfill can be calculated and used to determine whether or not Ireland can achieve the EU Landfill Directive targets. Without significant investment in Irelands waste management infrastructure it is unlikely that the targets will be met. Existing waste treatment facilities need to be managed as efficiently as possible. Waste streams must also be managed so waste is shared appropriately between companies and not create a monopolising waste treatment facility. The driving forces behind an efficient waste management infrastructure are government policy and legislation. An overall and efficient waste management strategy must be in place, along with disincentives for landfilling of waste such as the landfill levy. Encouragement and education of the population is the fundamental and first step to achieving the landfill directive targets.
Resumo:
L’ objectiu principal d’ aquest treball és l’ anàlisi de l’ evolució de l’ impacte ambiental produït per l’ emissió de gasos contaminants procedents de la incineradora de Campdorà (Girona). Els gasos contaminants objecte d’ estudi són: partícules de suspensió totals, clorur d’ hidrogen, diòxid de nitrogen, monòxid de carboni i diòxid de sofre. S’ ha realitzat la simulació de la dispersió atmosfèrica dels contaminants emesos per la incineradora de Campdorà mitjançant el programa informàtic ISC-AERMOD View. Com a resultat, s’ obtenen una sèrie de mapes de concentració on es mostren els diferents nivells d’ immissió detectats en la zona objecte d’ estudi. Els resultats mostren com la incorporació de noves tecnologies i tractaments de gasos en la incineradora de Campdorà han representat una reducció dels nivells d’ immissió de la zona, millorant la qualitat de l’ aire i disminuint l’ impacte ambiental que produeixen les emissions contaminants
Resumo:
Estudi de la situació dels residus d’aparells elèctrics i electrònics al Gironès reformulant la seva gestió actual, valorant si caldria fer una nova planta, així com una campanya de sensibilització social i construcció d’una possible planta intermediària de triatge de RAEE per a la comarca del Gironès