992 resultados para Railroads, Cable.


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In questo lavoro di tesi è stato sintetizzato un nuovo copolimero contenente il gruppo fullerenico in catena laterale. Il copolimero è risultato solubile nei comuni solventi organici e ha dato una efficienza di conversione fotovoltaica in un sistema BHJ del 2.19%.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This dissertation studies the geometric static problem of under-constrained cable-driven parallel robots (CDPRs) supported by n cables, with n ≤ 6. The task consists of determining the overall robot configuration when a set of n variables is assigned. When variables relating to the platform posture are assigned, an inverse geometric static problem (IGP) must be solved; whereas, when cable lengths are given, a direct geometric static problem (DGP) must be considered. Both problems are challenging, as the robot continues to preserve some degrees of freedom even after n variables are assigned, with the final configuration determined by the applied forces. Hence, kinematics and statics are coupled and must be resolved simultaneously. In this dissertation, a general methodology is presented for modelling the aforementioned scenario with a set of algebraic equations. An elimination procedure is provided, aimed at solving the governing equations analytically and obtaining a least-degree univariate polynomial in the corresponding ideal for any value of n. Although an analytical procedure based on elimination is important from a mathematical point of view, providing an upper bound on the number of solutions in the complex field, it is not practical to compute these solutions as it would be very time-consuming. Thus, for the efficient computation of the solution set, a numerical procedure based on homotopy continuation is implemented. A continuation algorithm is also applied to find a set of robot parameters with the maximum number of real assembly modes for a given DGP. Finally, the end-effector pose depends on the applied load and may change due to external disturbances. An investigation into equilibrium stability is therefore performed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the past two decades the work of a growing portion of researchers in robotics focused on a particular group of machines, belonging to the family of parallel manipulators: the cable robots. Although these robots share several theoretical elements with the better known parallel robots, they still present completely (or partly) unsolved issues. In particular, the study of their kinematic, already a difficult subject for conventional parallel manipulators, is further complicated by the non-linear nature of cables, which can exert only efforts of pure traction. The work presented in this thesis therefore focuses on the study of the kinematics of these robots and on the development of numerical techniques able to address some of the problems related to it. Most of the work is focused on the development of an interval-analysis based procedure for the solution of the direct geometric problem of a generic cable manipulator. This technique, as well as allowing for a rapid solution of the problem, also guarantees the results obtained against rounding and elimination errors and can take into account any uncertainties in the model of the problem. The developed code has been tested with the help of a small manipulator whose realization is described in this dissertation together with the auxiliary work done during its design and simulation phases.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJECTIVE: The stability of 2 fixation techniques for the tuberosities in patients with 3- or 4-part proximal humerus fractures treated with hemiarthroplasties was compared. DESIGN: Retrospective review of a nonrandomized sequential series of patients. SETTING: Level I university orthopaedic surgery department. PATIENTS: A consecutive series of 58 patients (average age, 64 years) from 1990 to 1999 with 3- and 4-part fractures of the proximal humerus. INTERVENTION: In group 1, 31 patients were treated with either a Neer or Aequalis shoulder prosthesis using nonabsorbable sutures and no bone graft for the reattachment of the tuberosities. In group 2, 27 patients were treated with either an Aequalis or Epoca shoulder prosthesis and a combination of cable fixation and bone grafting. MAIN OUTCOME MEASUREMENTS: At follow-up (average, 32 months), radiographs were taken to confirm tuberosity fixation or degree of displacement or resorption. Functional outcome was assessed by the Constant-Murley Score. RESULTS: Significantly more dislocated tuberosities were found radiographically in group 1 (10 of 13 in total, P = 0.011), and significantly more tuberosities were resorbed in group 1 (9 of 12 in total, P = 0.012). Significant differences in functional results among healed versus failed tuberosity fixation were observed for activity of daily living (P = 0.05), range of motion (P = 0.002), strength (P = 0.01), the total score (P = 0.008), and the passive rotation amplitude (P = 0.04). CONCLUSION: In hemiarthroplasties for proximal humeral fractures, the reattachment of the tuberosities with cable wire and bone grafting gives consistently better radiographic and functional results than with suture fixation alone.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper discusses new business models of transmission of television programs in the context of definitions of broadcasting and retransmission. Typically the whole process of supplying content to the end user has two stages: a media service provider supplies a signal assigned to a given TV channel to the cable operators and satellite DTH platform operators (dedicated transmission), and cable operators and satellite DTH platform operators transmit this signal to end users. In each stage the signals are encoded and are not available for the general public without the intervention of cable/platform operators. The services relating to the supply and transmission of the content are operated by different business entities: each earns money separately and each uses the content protected by copyright. We should determine how to define the actions of the entity supplying the signal with the TV program directly to the cable/digital platform operator and the actions of the entity providing the end user with the signal. The author criticizes the approach presented in the Chellomedia and Norma rulings, arguing that they lead to a significant level of legal uncertainty, and poses the basic questions concerning the notion of “public” in copyright.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Misiones, es una provincia pequeña, fronteriza y multicultural1, que se caracteriza por contar -a lo largo de su historia- con una variada y rica presencia de medios de comunicación. Desde el origen de los primeros parapetos (1872), pasando por los primeros diarios (1883), la aparición de la radio (1927) hasta llegar a la TV abierta (1972), existen una serie de emprendimientos comunicacionales llevados adelante con éxito por verdaderos pioneros en la materia. Es el caso de la televisión por cable, cuya existencia data desde 1964 en la ciudad de Posadas. Un medio pequeño que llegó a tener en su época de esplendor cerca de 4.000 usuarios. Esto nos permite pensar que más allá de los diversos contextos y momentos histórico, el ciudadano necesitó comunicar y comunicarse entre si y con los demás. El presente proyecto, es la continuidad de un trabajo de investigación que comenzó con la construcción de la historia de LT 85 TV Canal 12 de Posadas, que tiene por objetivo rescatar la memoria de los medios de comunicación de la Provincia de Misiones, en este caso, de Canal 2 de Posadas. Se intentará explorar los modos en que se creó, construyó y usó esta tecnología y los modos en que operó en prácticas y actos comunicativos de unos y otros, en espacios y tiempos múltiples.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Misiones, es una provincia pequeña, fronteriza y multicultural que se caracteriza por contar -a lo largo de su historia- con una variada y rica presencia de medios de comunicación. Desde el origen de los primeros parapetos (1872), pasando por los primeros diarios (1883), la aparición de la radio (1927) hasta llegar a la TV abierta (1972), existen una serie de emprendimientos comunicacionales llevados adelante con éxito por verdaderos pioneros en la materia. Es el caso de la televisión por cable, cuya existencia data desde 1965 en la ciudad de Posadas. Un medio pequeño que llegó a tener en su época de esplendor cerca de 4.000 usuarios. Esto nos permite pensar que más allá de los diversos contextos y momentos históricos, el ciudadano necesitó comunicar y comunicarse entre sí y con los demás. El proyecto es la continuidad de un trabajo de investigación que comenzó con la construcción de la historia de LT 85 TV Canal 12 de Posadas y, tiene por objetivo rescatar la memoria de los medios de comunicación de la Provincia de Misiones, en este caso, Canal 2 de Posadas. Se intentará explorar los modos en que se creó, construyó y usó esta tecnología y los modos en que operó en prácticas y actos comunicativos de unos y otros, en espacios y tiempos múltiples.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the early part of 1899 the U.S.S. Nero was dispatched from San Francisco to survey a route for a telegraph cable between the United States, the Philippines Islands and Japan. Concurent with meteorological and oceanographic observations, closely spaced samples of bottom material were systematically sampled. They have been carefully accounted and described by James M. Flint in this volume. On the way, numerous submarine peaks were discovered. During this voyage U.S.S. Nero also took a sounding in the area of the Challenger Deep, recording a depth of 5269 fathoms (9636 m), the greatest depth recorded at that time. Carefull study of the deep-sea deposits have also revealed a number of manganese nodules and encrustations as well as micronodules.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Under-deck cable-stayed bridges are very effective structural systems for which the strong contribution of the stay cables under live loading allows for the design of very slender decks for persistent and transient loading scenarios. Their behaviour when subjected to seismic excitation is investigated herein and a set of design criteria are presented that relate to the type and arrangement of bearings, the number and configuration of struts, and the transverse distribution of stay cables. The nonlinear behaviour of these bridges when subject to both near-field and far-field accelerograms has been thoroughly investigated through the use of incremental dynamic analyses. An intensity measure that reflects the pertinent contributions to response when several vibration modes are activated was proposed and is shown to be effective for the analysis of this structural type. The under-deck cable-stay system contributes in a very positive manner to reducing the response when the bridges are subject to very strong seismic excitation. For such scenarios, the reduction in the stiffness of the deck because of crack formation, when prestressed concrete decks are used, mobilises the cable system and enhances the overall performance of the system. Sets of natural accelerograms that are compliant with the prescriptions of Eurocode 8 were also applied to propose a set of design criteria for this bridge type in areas prone to earthquakes. Particular attention is given to outlining the optimal strategies for the deployment of bearings

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cable-stayed bridges represent nowadays key points in transport networks and their seismic behavior needs to be fully understood, even beyond the elastic range of materials. Both nonlinear dynamic (NL-RHA) and static (pushover) procedures are currently available to face this challenge, each with intrinsic advantages and disadvantages, and their applicability in the study of the nonlinear seismic behavior of cable-stayed bridges is discussed here. The seismic response of a large number of finite element models with different span lengths, tower shapes and class of foundation soil is obtained with different procedures and compared. Several features of the original Modal Pushover Analysis (MPA) are modified in light of cable-stayed bridge characteristics, furthermore, an extension of MPA and a new coupled pushover analysis (CNSP) are suggested to estimate the complex inelastic response of such outstanding structures subjected to multi-axial strong ground motions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

En el presente proyecto se realiza un estudio para la construcción de una cabecera de televisión por cable. Se trata de un proyecto puramente teórico en el que se especifican cada una de las partes que forman una cabecera de televisión y cómo funciona cada una de ellas. En un principio, se sitúa la cabecera de televisión dentro de una plataforma general de transmisión, para indicar sus funciones. Posteriormente, se analizan las distintas tecnologías que implementan esta transmisión y los estándares DVB que las rigen, como son DVB-C y DVB-C2 para las transmisiones por cable propiamente dichas y DVB-IPTV para las transmisiones por IP, para elegir cuál de las opciones es la más acertada y adaptar la cabecera de televisión a la misma. En cuanto al desarrollo teórico de la cabecera, se estudia el proceso que sigue la señal dentro de la misma, desde la recepción de los canales hasta el envío de los mismos hacia los hogares de los distintos usuarios, pasando previamente por las etapas de codificación y multiplexación. Además, se especifican los equipos necesarios para el correcto funcionamiento de cada una de las etapas. En la recepción, se reciben los canales por cada uno de los medios posibles (satélite, cable, TDT y estudio), que son demodulados y decodificados por el receptor. A continuación, son codificados (en este proyecto en MPEG-2 o H.264) para posteriormente ser multiplexados. En la etapa de multiplexación, se forma una trama Transport Stream por cada canal, compuesta por su flujo de video, audio y datos. Estos datos se trata de una serie de tablas (SI y PSI) que guían al set-topbox del usuario en la decodificación de los programas (tablas PSI) y que proporcionan información de cada uno de los mismos y del sistema (tablas SI). Con estas últimas el decodificador forma la EPG. Posteriormente, se realiza una segunda multiplexación, de forma que se incluyen múltiples programas en una sola trama Transport Stream (MPTS). Estos MPTS son los flujos que les son enviados a cada uno de los usuarios. El mecanismo de transmisión es de dos tipos en función del contenido y los destinatarios: multicast o unicast. Por último, se especifica el funcionamiento básico de un sistema de acceso condicional, así como su estructura, el cual es imprescindible en todas las cabeceras para asegurar que cada usuario solo visualiza los contenidos contratados. In this project, a study is realized for the cable television head-end construction . It is a theoretical project in which there are specified each of the parts that form a television headend and how their works each of them. At first, the television head-end places inside a general platform of transmission, to indicate its functions. Later, the different technologies that implement this transmission and the standards DVB that govern them are analyzed, since the standards that govern the cable transmissions (DVB-C and DVB-C2) to the standard that govern the IP transmissions (DVB-IPTV), to choose which of the options is the most guessed right and to adapt the television head-end to the same one. The theoretical development of the head-end, there is studied the process that follows the sign inside the same one, from the receipt of the channels up to the sending of the same ones towards the homes of the different users, happening before for the stages of codification and multiplexación. In addition, there are specified the equipments necessary for the correct functioning of each one of the stages. In the reception, the channels are receiving for each of the possible systems(satellite, cable, TDT and study), and they are demodulated and decoded by the receiver. Later, they are codified (in this project in MPEG-2 or H.264). The next stage is the stage of multiplexing. In the multiplexing stage, the channels are packetized in Transport Stream, composed by his video flow, audio and information. The information are composed by many tables(SI and PSI). The PSI tables guide the set-top-box of the user in the programs decoding and the SI tables provide information about the programs and system. With the information mentioned the decoder forms the EPG. Later, a second multiplexación is realized, so that there includes multiple programs in an alone Transport Stream (MPTS). These MPTS are the flows that are sent to each of the users. Two types of transmission are possible: unicast (VoD channels) and multicast (live channels). Finally, the basic functioning of a conditional access system is specified and his structure too, which is indispensable in all the head-end to assure that every users visualizes the contracted contents only.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The writer would like to point out the existence of a very remarkable Spanish cable-stayed bridge built in 1925, wich is thus older than the first one recorded by the authors (and probably the pioneer in concrete-deck type). The Tempul Aqueduct was designed by the famous Professor Educardo Torroja. The deck is a concrete box girder sustained by two planes of 3 mm diam 37-wire double cables working at 27 kg/mm2.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

El presente proyecto tiene la finalidad de diseñar una herramienta mediante métodos numéricos implementados en Matlab que permita estudiar los fenómenos térmicos que tiene lugar en los cables subterráneos de potencia cuando se encuentran en carga. Y a partir de las soluciones obtenidas determinar la capacidad máxima del transporte del cable para un emplazamiento determinado.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This layer is a georeferenced raster image of the historic paper map entitled: Sketch of the states of Massachusetts, Connecticut, and Rhode Island, and parts of New Hampshire & New York exhibiting the several rail road routes completed, constructing, chartered & contemplated : published by order of the Legislature of Massachusetts, drawn by A. Kennedy ; engraved by Morse & Tuttle. It was published in 1838. Scale [ca. 1:700,000]. The image inside the map neatline is georeferenced to the surface of the earth and fit to the USA Contiguous Albers Equal Area Conic projection (Meters). All map collar and inset information is also available as part of the raster image, including any inset maps, profiles, statistical tables, directories, text, illustrations, or other information associated with the principal map. This map shows features such as roads, completed, chartered, and contemplated railroads, drainage, state and county boundaries, and more. This layer is part of a selection of digitally scanned and georeferenced historic maps of New England from the Harvard Map Collection. These maps typically portray both natural and manmade features. The selection represents a range of regions, originators, ground condition dates, scales, and purposes.