880 resultados para Public building


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Most commonly, residents are always arguing about the satisfaction of sustainability and quality of their high rise residential property. This paper aim is to maintain the best quality satisfaction of the floor materials by introducing the whole life cycle costing approach to the property manager of the public housing in Johor. This paper looks into the current situation of floor material of two public housings in Johor, Malaysia and testing the whole life cycle costing approach towards them. The cost figures may be implemented to justify higher investments, for examples, in the quality or flexibility of building solutions through a long-term cost reduction. The calculation and the literature review are conducted. The questionnaire surveys of two public housings were conducted to make clear the occupants’ evaluation about the actual quality conditions of the floor material in their house. As a result, the quality of floor material based on the whole life cycle costing approach is one of the best among their previous decision making tool that was applied. Practitioners can benefit from this paper as it provides information on calculating the whole life costing and making the decisions for floor material selection for their properties.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An evolution in the use of digital modelling has occurred in the Queensland Department of Public Works Division of Project Services over the last 20 years from: the initial implementation of computer aided design and documentation (CADD); to experimentation with building information modelling (BIM); to embedding integrated practice (IP); to current steps towards integrated project delivery (IPD) including the active involvement of consultants and contractors in the design/delivery process. This case study is one of three undertaken through the Australian Sustainable Built Environment National Research Centre investigating past R&D investment. The intent of these cases is to inform the development of policy guidelines for future investment in the construction industry in Australia. This research is informing the activities of CIB Task Group 85 R&D Investment and Impact. The uptake of digital modelling by Project Services has been approached through an incremental learning approach. This has been driven by a strong and clear vision with a focus on developing more efficient delivery mechanisms through the use of new technology coupled with process change. Findings reveal an organisational focus on several areas including: (i) strategic decision making including the empowerment of innovation leaders and champions; (ii) the acquisition and exploitation of knowledge; (iii) product and process development (with a focus on efficiency and productivity); (iv) organisational learning; (v) maximising the use of technology; and (vi) supply chain integration. Key elements of this approach include pilot projects, researcher engagement, industry partnerships and leadership.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and delivering Value for Money (VfM). As part of the background to this challenge, a critique is given of current practice in the selection of the approach to procure major public sector infrastructure in Australia and which is akin to the Multi-Attribute Utility Approach (MAUA). To contribute towards addressing the key weaknesses of MAUA, a new first-order procurement decision-making model is presented. The model addresses the make-or-buy decision (risk allocation); the bundling decision (property rights incentives), as well as the exchange relationship decision (relational to arms-length exchange) in its novel approach to articulating a procurement strategy designed to yield superior VfM across the whole life of the asset. The aim of this paper is report on the development of this decisionmaking model in terms of the procedural tasks to be followed and the method being used to test the model. The planned approach to testing the model uses a sample of 87 Australian major infrastructure projects in the sum of AUD32 billion and deploys a key proxy for VfM comprising expressions of interest, as an indicator of competition.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The natural disasters incident that frequently hit Indonesia are floods, severe droughts, tsunamis, earth-quakes, volcano, eruptions, landslides, windstorm and forest fires. The impact of those natural disasters are significantly severe and affecting the quality of life of the community due to the breakdown of the public as-sets as one source to deliver public services. This paper is aimed to emphasis the importance of natural disaster risk-informed in relation to public asset management in Indonesian Central Government, particularly in asset planning stage where asset decision is made as the gate into the whole public asset management processes. A Case study in the Ministry of Finance Indonesia as the central government public asset manager and in 5 (five) line ministries/governmental agencies as public asset users was used as the approach to achieved the research objective. The case study devoured three data collection techniques i.e. interviews, observations and document archival which will be analysed by a content analysis approach. The result of the study indicates that Indonesian geographical position exposing many of public infra-structure assets as a high vulnerability to natural disasters. Information on natural-disaster trends and predictions to identify and measure the risks are available, however, such information are not utilise and integrated to the process of public infrastructure asset planning as the gate to the whole public asset management processes. Therefore, in order to accommodate and incorporate this natural disaster risk-information into public asset management processes, particularly in public asset planning, a public asset performance measurements framework should be adopted and applied in the process as one sources in making decision for infrastructure asset planning. Findings from this study provide useful input for the Ministry of Finance as public asset manager, scholars and private asset management practitioners in Indonesia to establish natural disaster risks awareness in public infrastructure asset management processes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper discusses computer mediated distance learning on a Master's level course in the UK and student perceptions of this as a quality learning environment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Policy makers increasingly recognise that an educated workforce with a high proportion of Science, Technology, Engineering and Mathematics (STEM) graduates is a pre-requisite to a knowledge-based, innovative economy. Over the past ten years, the proportion of first university degrees awarded in Australia in STEM fields is below the global average and continues to decrease from 22.2% in 2002 to 18.8% in 2010 [1]. These trends are mirrored by declines between 20% and 30% in the proportions of high school students enrolled in science or maths. These trends are not unique to Australia but their impact is of concern throughout the policy-making community. To redress these demographic trends, QUT embarked upon a long-term investment strategy to integrate education and research into the physical and virtual infrastructure of the campus, recognising that expectations of students change as rapidly as technology and learning practices change. To implement this strategy, physical infrastructure refurbishment/re-building is accompanied by upgraded technologies not only for learning but also for research. QUT’s vision for its city-based campuses is to create vibrant and attractive places to learn and research and to link strongly to the wider surrounding community. Over a five year period, physical infrastructure at the Gardens Point campus was substantially reconfigured in two key stages: (a) a >$50m refurbishment of heritage-listed buildings to encompass public, retail and social spaces, learning and teaching “test beds” and research laboratories and (b) destruction of five buildings to be replaced by a $230m, >40,000m2 Science and Engineering Centre designed to accommodate retail, recreation, services, education and research in an integrated, coordinated precinct. This landmark project is characterised by (i) self-evident, collaborative spaces for learning, research and social engagement, (ii) sustainable building practices and sustainable ongoing operation and; (iii) dynamic and mobile re-configuration of spaces or staffing to meet demand. Innovative spaces allow for transformative, cohort-driven learning and the collaborative use of space to prosecute joint class projects. Research laboratories are aggregated, centralised and “on display” to the public, students and staff. A major visualisation space – the largest multi-touch, multi-user facility constructed to date – is a centrepiece feature that focuses on demonstrating scientific and engineering principles or science oriented scenes at large scale (e.g. the Great Barrier Reef). Content on this visualisation facility is integrated with the regional school curricula and supports an in-house schools program for student and teacher engagement. Researchers are accommodated in a combined open-plan and office floor-space (80% open plan) to encourage interdisciplinary engagement and cross-fertilisation of skills, ideas and projects. This combination of spaces re-invigorates the on-campus experience, extends educational engagement across all ages and rapidly enhances research collaboration.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many industry peak and professional bodies advocate students undertake professional work placements as a key work integrated learning (WIL) experience in accredited university degree courses. However, mismatched expectations and gaps in the way industry partners (IPs) are supported during these work placements can place these high-stake alliances at risk. A review of models and strategies supporting industry partners indicates many are contingent on the continued efforts of well-networked individuals in both universities and IP organisations to make these connections work. It is argued that whilst these individuals are highly valued they often end up representing a whole course or industry perspective, not just their area of expertise. Sustainable partnership principles and practices with shared responsibility across stakeholder groups are needed instead. This paper provides an overview of work placement approaches in the disciplines of business, engineering and urban development at an Australian, metropolitan university. Employing action research and participatory focus group methodologies, it gathers and articulates recommendations from associated IPs on practical suggestions and strategies to improve relationships and the resultant quality of placements.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Decision makers frequently use separate participatory activities to involve marginalised groups. This approach can generate valuable insights, but it has limitations. We discuss the benefits and limits through two examples involving young people, and outline how the approach can be modified, thereby building citizens who are responsive to other perspectives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The literature concerning firm boundaries has focussed extensively on the rationale for different boundary choices and the economic efficiencies that such choices can make. There is also an acknowledged position that a firm’s boundary choices may impact the ability of a firm to maintain and even build new capabilities, though such choices may not be optimal from an economic efficiency perspective. It is in this context that we seek to investigate how firms make this potential trade-off in respect of their boundary choices and how these choices are implemented across a wide range of activities. Using qualitative data from three public sector construction oriented organizations, we observe that neither pure make nor buy decisions assisted significantly in capability building. Dual modes – where firms make and buy the same product or service simultaneously – provided firms with some opportunities to manage this paradox, but the most successful decisions seemed to occur in respect of using intermediate governance modes such as alliances. We also observed that the boundary choice was just one dimension of the capability building process and firms pursuing the same boundary choice decisions often had quite divergent outcomes on the basis of their boundary management and the ability of knowledge to move across firm boundaries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Like other Western nations, since the nineteenth century Australia has been a representative democracy, in which citizens elect parliamentary representatives to make decisions and develop policies on their behalf (see chapter 5). These representatives are supported in their decision making by an ‘arm’s-length’, ‘techno-bureaucratic administration’, which includes experts such as environmental planners (Fung and Wright 2003, p. 3). However, as the issues for decision-making become increasingly complex, and societies increasingly diverse, the idea of citizen participation in decision-making is ever more accepted. There is now a significant body of political theory arguing for a more participatory model of democracy (participatory democracy), a model that strives to create opportunities for all members of a society to contribute meaningfully to decisions about the matters affecting their lives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Road traffic injuries are one of the major public health burdens worldwide. The United Nations Decade of Action for Road Safety (2011-2020) implores all nations to work to reduce this burden. This decade represents a unique and historic period of time in the field of road safety. Information exchange and co-operation between nations is an important step in achieving the goal. The burden of road crashes, fatalities and injuries is not equally distributed. We know that low and middle-income countries experience the majority of the road trauma burden. Therefore it is imperative that these countries learn from the successes of others that have developed and implemented road safety laws, public education campaigns and countermeasures over many years and have achieved significant road trauma reductions as a result. China is one of the countries experiencing a large road trauma burden. Vulnerable road users such as pedestrians and cyclists make up a large proportion of fatalities and injuries in China. Speeding, impaired/drug driving, distracted driving, vehicle overloading, inadequate road infrastructure, limited use of safety restraints and helmets, and limited road safety training have all been identified as contributing to the problem. Some important steps have been taken to strengthen China’s approach, including increased penalties for drunk driving in May 2011 and increased attention to school bus safety in 2011/12. However, there is still a large amount of work needed to improve the current road safety position in China. This paper provides details of a program to assist with road safety knowledge exchange between China and Australia that was funded by the Australian Government which was undertaken in the latter part of 2012. The four month program provided the opportunity for the first author to work closely with key agencies in Australia that are responsible for policy development and implementation of a broad range of road safety initiatives. In doing so, an in-depth understanding was gained about key road safety strategies in Australia and processes for developing and implementing them. Insights were also gained into the mechanisms used for road safety policy development, implementation and evaluation in several Australian jurisdictions. Road traffic law and enforcement issues were explored with the relevant jurisdictional transport and police agencies to provide a greater understanding of how Chinese laws and practices could be enhanced. Working with agencies responsible for public education and awareness campaigns about road safety in Australia also provided relevant information about how to promote road safety at the broader community level in China. Finally, the program provided opportunities to work closely with several world-renowned Australian research centres and key expert researchers to enhance opportunities for ongoing road safety research in China. The overall program provided the opportunity for the first author to develop knowledge in key areas of road safety strategy development, implementation and management which are directly relevant to the current situation in China. This paper describes some main observations and findings from participation in the program.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction delay has been a protracted problem for the Malaysian construction industry. Recent report showed that 80% of public sector projects are behind schedule. This underachieving time performance has led to many problems including public complaints, loss of reputation and revenue for the government and a slump in the industry’s GDP contribution. Research in the area of project delay has mushroomed worldwide with attempts to place mitigation plans, but delay remains a global phenomenon. There is now an urgent need for revolutionizing construction practices and past research, backed up with few successful cases suggests that Supply Chain Management (SCM) could prove beneficial to reduce or eliminate delays in construction. SCM which originated from the automotive manufacturing industry promotes a more collaborative approach to construction management and has recently gained attention of the construction industry. However every country, including Malaysia, would certainly have disparities of their own compared to others being it from the cultural point of view, nature of problems, locality or improvements needed. Therefore, this paper will present part of a Ph.D. research which aims at illustrating the Malaysian construction industry experts’ perception of the Malaysian public sector project delay, provide insight into these dilemmas, highlights the problems with current practices, its effects and the improvements needed. Subsequently, this paper would propose ratification to the problems using SCM. A semi-structured interview has been conducted to practitioners with at least 20 years’ experience in the industry. The findings showed that Malaysia may be unique compared to other countries and that by considering a number of additional factors, SCM could prove beneficial to increase efficiency of the Malaysian public sector projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, we present a field trial of a pervasive system called Panorama that is aimed at supporting social awareness in work environments. Panorama is an intelligent situated display in the staff room of an academic department. It artistically represents non-critical user generated content such as images from holidays, conferences and other social gatherings, as well as textual messages on its display. It also captures images and videos from different public spaces of the department and streams them onto the Panorama screen, using appropriate abstraction techniques. We studied the use of Panorama for two weeks and observed how Panorama affected staff members' social awareness and community building. We report that Panorama simulated curiosity and learning, initiated new interactions and provided a mechanism for cherishing old memories.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Despite ongoing ‘boom’ conditions in the Australian mining industry, women remain substantially and unevenly under-represented in the sector, as is the case in other resource-dependent countries. Building on the literature critiquing business-case rationales and strategies as a means to achieve women’s equality in the workplace, we examine the business case for employing more women as advanced by the Australian mining industry. Specifically, we apply a discourse analysis to seven substantial, publically-available documents produced by the industry’s national and state peak organizations between 2005 and 2013. Our study makes two contributions. First, we map the features of the business case at the sectoral rather than firm or workplace level and examine its public mobilization. Second, we identify the construction and deployment of a normative identity – ‘the ideal mining woman’ – as a key outcome of this business-case discourse. Crucially, women are therein positioned as individually responsible for gender equality in the workplace.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Design-build (DB) is regarded as an effective means of delivering high performance green buildings, and the selection of DB contractors is of critical importance. The objective of this study is to evaluate the selection of design-builders for public buildings seeking Leadership in Energy and Environmental Design (LEED) certification and compare the selection practices involved with those of non-LEED-seeking DB projects through a robust content analysis of 74 DB request for proposals (RFPs) for public DB projects. The results of the content analysis reveal that the level of LEED certification is the dominant means of conveying the sustainability requirements in RFPs for contractor selection, with the majority of RFPs (60%) including sustainability requirements as part of the contractor evaluation package. With the exception of contractors' past performance, there is no statistically significant difference in the importance weightings of selection criteria between LEED-seeking and non-LEED-seeking buildings, and DB owners tend to place more emphasis on innovative technical solutions rather than the past performance of DB contractors. Additionally, the research findings also indicate that owners of LEED-seeking building projects tend to provide less design decisions in RFPs in order to solicit innovative design alternatives from potential DB contractors. This study provides DB owners with a number of practical implications for selecting appropriate design-builders for green DB projects.