962 resultados para Projects decisions
Resumo:
In the face of improved First Nation outcomes in many western nations, Australia is still dealing with a seemingly intractable gap between the quality of life of its Aboriginal and Torres Strait Islander peoples and the non-Aboriginal and Torres Strait Islander population. Philanthropy in Australia provides a smaller proportion of funding for community projects than is the case in other countries and Aboriginal and Torres Strait Islander causes have been significantly under - represented as recipients. This paper reports on a qualitative study aimed at understanding the issues affecting the decisions and actions of grantmaking organisations and individuals who wish to support Aboriginal and Torres Strait Islander causes in the current Australian context. The aims were to build on the limited research in this arena, add to the future research agenda and contribute to practice and policy insights for Australia and beyond. The study found that while government funding programs are perceived as output driven, inflexible and dogmatic - ‘a cup of tea mob’- participants see the Australian philanthropic sector as capable of addressing the complex Aboriginal and Torres Strait Islander ‘problem’ with more innovative and independent thinking. From the point of view of contextual impacts, success criteria, barriers, structural imposts and emotional involvement, the practical experience in grantmaking for Indigenous causes of participants in this study reflects that found elsewhere. However the focus of many grantmakers on organisational rather than community capacity and the potentially elitist emphasis on established relationships continues to hamper Aboriginal and Torres Strait Islander access to philanthropic funding in Australia. Further, if the strategic changes currently visible in the sector are unsupported by a depth of policy and a proactive transfer and distribution of skill and knowledge they may be unsustainable.
Resumo:
Principal Topic: Project structures are often created by entrepreneurs and large corporate organizations to develop new products. Since new product development projects (NPDP) are more often situated within a larger organization, intrapreneurship or corporate entrepreneurship plays an important role in bringing these projects to fruition. Since NPDP often involves the development of a new product using immature technology, we describe development of an immature technology. The Joint Strike Fighter (JSF) F-35 aircraft is being developed by the U.S. Department of Defense and eight allied nations. In 2001 Lockheed Martin won a $19 billion contract to develop an affordable, stealthy and supersonic all-weather strike fighter designed to replace a wide range of aging fighter aircraft. In this research we define a complex project as one that demonstrates a number of sources of uncertainty to a degree, or level of severity, that makes it extremely difficult to predict project outcomes, to control or manage project (Remington & Zolin, Forthcoming). Project complexity has been conceptualized by Remington and Pollock (2007) in terms of four major sources of complexity; temporal, directional, structural and technological complexity (See Figure 1). Temporal complexity exists when projects experience significant environmental change outside the direct influence or control of the project. The Global Economic Crisis of 2008 - 2009 is a good example of the type of environmental change that can make a project complex as, for example in the JSF project, where project managers attempt to respond to changes in interest rates, international currency exchange rates and commodity prices etc. Directional complexity exists in a project where stakeholders' goals are unclear or undefined, where progress is hindered by unknown political agendas, or where stakeholders disagree or misunderstand project goals. In the JSF project all the services and all non countries have to agree to the specifications of the three variants of the aircraft; Conventional Take Off and Landing (CTOL), Short Take Off/Vertical Landing (STOVL) and the Carrier Variant (CV). Because the Navy requires a plane that can take off and land on an aircraft carrier, that required a special variant of the aircraft design, adding complexity to the project. Technical complexity occurs in a project using technology that is immature or where design characteristics are unknown or untried. Developing a plane that can take off on a very short runway and land vertically created may highly interdependent technological challenges to correctly locate, direct and balance the lift fans, modulate the airflow and provide equivalent amount of thrust from the downward vectored rear exhaust to lift the aircraft and at the same time control engine temperatures. These technological challenges make costing and scheduling equally challenging. Structural complexity in a project comes from the sheer numbers of elements such as the number of people, teams or organizations involved, ambiguity regarding the elements, and the massive degree of interconnectedness between them. While Lockheed Martin is the prime contractor, they are assisted in major aspects of the JSF development by Northrop Grumman, BAE Systems, Pratt & Whitney and GE/Rolls-Royce Fighter Engineer Team and innumerable subcontractors. In addition to identifying opportunities to achieve project goals, complex projects also need to identify and exploit opportunities to increase agility in response to changing stakeholder demands or to reduce project risks. Complexity Leadership Theory contends that in complex environments adaptive and enabling leadership are needed (Uhl-Bien, Marion and McKelvey, 2007). Adaptive leadership facilitates creativity, learning and adaptability, while enabling leadership handles the conflicts that inevitably arise between adaptive leadership and traditional administrative leadership (Uhl-Bien and Marion, 2007). Hence, adaptive leadership involves the recognition and opportunities to adapt, while and enabling leadership involves the exploitation of these opportunities. Our research questions revolve around the type or source of complexity and its relationship to opportunity recognition and exploitation. For example, is it only external environmental complexity that creates the need for the entrepreneurial behaviours, such as opportunity recognition and opportunity exploitation? Do the internal dimensions of project complexity, such as technological and structural complexity, also create the need for opportunity recognition and opportunity exploitation? The Kropp, Zolin and Lindsay model (2009) describes a relationship between entrepreneurial orientation (EO), opportunity recognition (OR), and opportunity exploitation (OX) in complex projects, with environmental and organizational contextual variables as moderators. We extend their model by defining the affects of external complexity and internal complexity on OR and OX. ---------- Methodology/Key Propositions: When the environment complex EO is more likely to result in OR because project members will be actively looking for solutions to problems created by environmental change. But in projects that are technologically or structurally complex project leaders and members may try to make the minimum changes possible to reduce the risk of creating new problems due to delays or schedule changes. In projects with environmental or technological complexity project leaders who encourage the innovativeness dimension of EO will increase OR in complex projects. But projects with technical or structural complexity innovativeness will not necessarily result in the recognition and exploitation of opportunities due to the over-riding importance of maintaining stability in the highly intricate and interconnected project structure. We propose that in projects with environmental complexity creating the need for change and innovation project leaders, who are willing to accept and manage risk, are more likely to identify opportunities to increase project effectiveness and efficiency. In contrast in projects with internal complexity a much higher willingness to accept risk will be necessary to trigger opportunity recognition. In structurally complex projects we predict it will be less likely to find a relationship between risk taking and OP. When the environment is complex, and a project has autonomy, they will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. When a project experiences high competitive aggressiveness and their environment is complex, project leaders will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. This paper reports the first stage of a three year study into the behaviours of managers, leaders and team members of complex projects. We conduct a qualitative study involving a Group Discussion with experienced project leaders. The objective is to determine how leaders of large and potentially complex projects perceive that external and internal complexity will influence the affects of EO on OR. ---------- Results and Implications: These results will help identify and distinguish the impact of external and internal complexity on entrepreneurial behaviours in NPDP. Project managers will be better able to quickly decide how and when to respond to changes in the environment and internal project events.
Resumo:
The previously distinct boundary between airports and their cities has become increasingly blurred as new interests and actors are identified as important stakeholders in the decision making process. As a consequence airport entities are more than ever seeking an integrated existence with their surrounding regions. While current planning strategies provide insights on how to improve and leverage land use planning in and around airports, emerging challenges for implementing and protecting these planning ideals stem from the governance shadows of development decisions. The thesis of this paper is that improving the identification, articulation and consideration of city and airport interests in the development approval process (between planning and implementation) can help avoid outcomes that hinder the ability of cities and their airports to meet their separate/mutual long-term objectives. By applying a network governance perspective to the pilot case study of Brisbane, analysis of overlapping and competing actor interests show how different governance arrangements facilitate (or impede) decision making that protects sustainable ‘airport region’ development. ---------- Contributions are made to airport and city development decision makers through the identification and analysis of effective and ineffective decision making pathways, and to governance literature by way of forwarding empirically derived frameworks for showing how actors protect their interests in the ‘crowded decision making domain’ of airport region development. This work was carried out through the Airport Metropolis Research Project under the Australian Research Council’s Linkage Projects funding scheme (LP0775225).
Resumo:
Highway construction often requires a significant capital input; therefore it often causes serious financial implications for developers, owners and operators. The recent industry-wide focus on sustainability has added a new dimension to the evaluation of highway projects, particularly on the economical scale of ‘going green’. Comprehensive analysis of the whole-of-life highway development that responds to sustainability challenges is one of the primary concerns for stakeholders. Principles of engineering economics and life cycle costing have been used to determine the incremental capacity investments for highway projects. However, the consideration of costs and issues associated with sustainability is still very limited in current studies on highway projects. Previous studies have identified that highway project investments are primarily concerned with direct market costs that can be quantified through life cycle costing analysis (LCCA). But they tend to ignore costs that are difficult to calculate, as those related to environmental and social elements. On a more positive note, these studies proved that the inclusion of such costs is an essential part of the overall development investment and a primary concern for decision making by the stakeholders. This paper discusses a research attempt to identify and categorise sustainability cost elements for highway projects. Through questionnaire survey, a set of sustainability cost elements on highway projects has been proposed. These cost elements are incorporated into the extension of some of the existing Life Cycle Costing Analysis (LCCA) models in order to produce a holistic financial picture of the highway project. It is expected that a new LCCA model will be established to serve as a suitable tool for decision making for highway project stakeholders.
Resumo:
Public awareness and the nature of highway construction works demand that sustainability measures are first on the development agenda. However, in the current economic climate, individual volition and enthusiasm for such high capital investments do not present as strong cases for decision making as the financial pictures of pursuing sustainability. Some stakeholders consider sustainability to be extra work that costs additional money. Though, stakeholders realised its importance in infrastructure development. They are keen to identify the available alternatives and financial implications on a lifecycle basis. Highway infrastructure development is a complex rocess which requires expertise and tools to evaluate investment options, such as environmentally sustainable features for road and highway development. Life-cycle cost analysis (LCCA) is a valuable approach for investment decision making for construction works. However, LCCA applications in highway development are still limited. Current models, for example focus on economic issues alone and do not deal with sustainability factors, which are more difficult to quantify and encapsulate in estimation modules. This paper reports the research which identifies sustainability related factors in highway construction projects, in quantitative and qualitative forms of a multi-criteria analysis. These factors are then incorporated into past and proven LCCA models to produce a new long term decision support model. The research via questionnaire, model building, analytical hierarchy processes (AHP) and case studies have identified, evaluated and then processed highway sustainability related cost elements. These cost elements need to be verified by industry before being integrated for further development of the model. Then the Australian construction industry will have a practical tool to evaluate investment decisions which provide an optimum balance between financial viability and sustainability deliverables.
Resumo:
Objectives: To explore whether people's organ donation consent decisions occur via a reasoned and/or social reaction pathway. --------- Design: We examined prospectively students' and community members' decisions to register consent on a donor register and discuss organ donation wishes with family. --------- Method: Participants completed items assessing theory of planned behaviour (TPB; attitude, subjective norm, perceived behavioural control (PBC)), prototype/willingness model (PWM; donor prototype favourability/similarity, past behaviour), and proposed additional influences (moral norm, self-identity, recipient prototypes) for registering (N=339) and discussing (N=315) intentions/willingness. Participants self-reported their registering (N=177) and discussing (N=166) behaviour 1 month later. The utility of the (1) TPB, (2) PWM, (3) augmented TPB with PWM, and (4) augmented TPB with PWM and extensions was tested using structural equation modelling for registering and discussing intentions/willingness, and logistic regression for behaviour. --------- Results: While the TPB proved a more parsimonious model, fit indices suggested that the other proposed models offered viable options, explaining greater variance in communication intentions/willingness. The TPB, augmented TPB with PWM, and extended augmented TPB with PWM best explained registering and discussing decisions. The proposed and revised PWM also proved an adequate fit for discussing decisions. Respondents with stronger intentions (and PBC for registering) had a higher likelihood of registering and discussing. --------- Conclusions: People's decisions to communicate donation wishes may be better explained via a reasoned pathway (especially for registering); however, discussing involves more reactive elements. The role of moral norm, self-identity, and prototypes as influences predicting communication decisions were highlighted also.
Resumo:
Purpose: With the increasing interest in Public Private Partnership (PPP) there is a need to investigate the factors contributing to successful delivery of PPP projects. Design/methodology/approach: An empirical questionnaire survey was conducted in Hong Kong and Australia. The survey respondents were asked to rate eighteen factors which contribute to delivering successful PPP projects. Findings: The findings from this survey were further compared with the results achieved by a previous researcher (Li, 2003) in a similar survey conducted in the United Kingdom. The comparison showed that amongst the top five success factors ranked by Hong Kong respondents, three were also ranked highly by the Australians and British. These success factors included: ‘Commitment and responsibility of public and private sectors’; ‘Strong and good private consortium’; and ‘Appropriate risk allocation and risk sharing’. Originality/value: These success factors were therefore found to be important for contributing to successful PPP projects irrespective of geographical locations.
Resumo:
Hong Kong has been one of the early jurisdictions to adopt Public Private Partnership (PPP) model for delivering large public infrastructure projects. The development of this procurement approach in Hong Kong has followed an intricate path. As such, it is believed that there are a number of areas which are interesting to unveil. As part of a comprehensive research study looking at implementing PPPs, interviews with experienced local industrial practitioners from the public sector were conducted to realize their perspective on the topic of procuring public works projects. Amongst these interviews, fourteen were launched government officials and advisers. The interview findings show that the majority of the Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. Both groups of interviewees agreed that “PPPs gain private sector’s added efficiency/expertise/management skills” when compared to projects procured traditionally. Also, both groups of interviewees felt that projects best suited to use PPP are those that have an “Economic business case”. The interviewees believed that “Contractor’s performance” could be used as key performance indicators for PPP projects. A large number of critical success factors were identified by the interviewees for PPP projects; two of these were similar for both groups of interviewees. These included “Project objectives well defined” and “Partnership spirit/commitment/trust”. Finally it was found that in-house guidance materials were more common in the organizations of the Australian interviewees compared to the Hong Kong ones. This paper studies the views of the public sector towards the topic of PPPs in Hong Kong and Australia, which helps to answer some of the queries that both academics and the private sector in these jurisdictions are keen to know. As a result the private sector can be more prepared when negotiating with the public sector and realise their needs better, academics on the other hand are provided a wider perspective of this topic benefiting the research industry at large.
Resumo:
Purpose: As part of a comprehensive research study looking at implementing PPPs, interviews with experienced researchers were conducted to realize their views on private sector involvement in public works projects. Design / methodology / approach: Amongst these interviews, five were launched with academics from Hong Kong and Australia, and two were conducted with Legislative Councillors of the Hong Kong Special Administration Region (HKSAR) government. Findings: The interview findings show that both Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. The interviewees highlighted that “Different risk profiles” and “Private sector more innovative / efficient” were the main differences between projects that were procured by PPP and traditionally. Other differences include risk transfer. In a PPP arrangement the public sector passes on a substantial amount of the project risks to the private sector, whereas in a traditional case the public sector would take the largest responsibility in bearing these risks. Another common feature of the private sector is that they tend to be more efficient and innovative when compared to the public sector hence their expertise is often reflected in PPP projects. The interviewees agreed that the key performance indicators for PPP projects were unique depending on the individual project. The critical success factors mentioned by both groups of interviewees included “Transparent process”, “Project dependent” and “Market need”. Due to the fact that PPP projects tend to be large scaled costly projects, adequate transparency in the process is necessary in order to demonstrate that a fair selection and tendering process is conducted. A market need for the project is also important to ensure that the project will be financially secure and that the private sector can make a reasonable profit to cover their project expenditure. Originality / value: The findings from this study have enabled a comparative analysis between the views of researchers in two completely different jurisdictions. With the growing popularity to implement PPP projects, it is believed that the results presented in this paper would be of interest to the industry at large.
Resumo:
Sexual harassment can be conceptualized as a series of interactions between harassers and targets that either inhibit or increase outrage by third parties. The outrage management model predicts the kinds of actions likely to be used by perpetrators to minimize outrage, predicts the consequences of failing to use these tactics—namely backfire, and recommends countertactics to increase outrage. Using this framework, our archival study examined outrage-management tactics reported as evidence in 23 judicial decisions of sexual harassment cases in Australia. The decisions contained precise, detailed information about the circumstances leading to the claim; the events which transpired in the courtroom, including direct quotations; and the judges' interpretations and findings. We found evidence that harassers minimize outrage by covering up the actions, devaluing the target, reinterpreting the events, using official channels to give an appearance of justice, and intimidating or bribing people involved. Targets can respond using countertactics of exposure, validation, reframing, mobilization of support, and resistance. Although there are limitations to using judicial decisions as a source of information, our study points to the value of studying tactics and the importance to harassers of minimizing outrage from their actions. The findings also highlight that, given the limitations of statutory and organizational protections in reducing the incidence and severity of sexual harassment in the community, individual responses may be effective as part of a multilevel response in reducing the incidence and impact of workplace sexual harassment as a gendered harm.
Resumo:
With the rapid urbanization progress, water resources protection and water pollution control have become key problems of human environment construction and social sustainable development. Many countries, especially Australia, have mature experiences. Water Sensitive Urban Design (WSUD) is one of the successful strategies that is put forward under this global situation and helps releasing heavy environmental pressure from urbanization. The paper discussed main principles of WSUD and then took Shijiazhuang, Heibei and Yueng, Hunan for examples trying to apply WSUD in river landscape projects in China's new urban area, thus doing contributions to more sustainable water management in new urban areas in China.
Resumo:
Construction procurement organisations in the Australian framework provide broad guidelines on project management in setting benchmark performance measurements and processes for evaluating their projects. Despite this, little has been known in the project management practise in transport construction projects in Australia, in particular Queensland. Questionnaire data from 53 project management practitioners employed in State and City public sector organisations in Queensland,suggested that many practitioners in the public sector have little or a lack of understanding of government regulatory policies, which are used as economic evaluation tools for project options. Public sector project managers perceive socio-economic evaluation tools as inappropriate for public sector projects. The survey results also found conducting risk management analysis, developing a risk register and mitigation of risks were most effective way of managing risk. This study provides an opportunity for the public sector to review and provide training on project management practices and government regulatory policies governing public projects. This will improve project management practitioners’ understanding and interpretation of government regulatory policies.
Resumo:
Physical infrastructure assets are important components of our society and our economy. They are usually designed to last for many years, are expected to be heavily used during their lifetime, carry considerable load, and are exposed to the natural environment. They are also normally major structures, and therefore present a heavy investment, requiring constant management over their life cycle to ensure that they perform as required by their owners and users. Given a complex and varied infrastructure life cycle, constraints on available resources, and continuing requirements for effectiveness and efficiency, good management of infrastructure is important. While there is often no one best management approach, the choice of options is improved by better identification and analysis of the issues, by the ability to prioritise objectives, and by a scientific approach to the analysis process. The abilities to better understand the effect of inputs in the infrastructure life cycle on results, to minimise uncertainty, and to better evaluate the effect of decisions in a complex environment, are important in allocating scarce resources and making sound decisions. Through the development of an infrastructure management modelling and analysis methodology, this thesis provides a process that assists the infrastructure manager in the analysis, prioritisation and decision making process. This is achieved through the use of practical, relatively simple tools, integrated in a modular flexible framework that aims to provide an understanding of the interactions and issues in the infrastructure management process. The methodology uses a combination of flowcharting and analysis techniques. It first charts the infrastructure management process and its underlying infrastructure life cycle through the time interaction diagram, a graphical flowcharting methodology that is an extension of methodologies for modelling data flows in information systems. This process divides the infrastructure management process over time into self contained modules that are based on a particular set of activities, the information flows between which are defined by the interfaces and relationships between them. The modular approach also permits more detailed analysis, or aggregation, as the case may be. It also forms the basis of ext~nding the infrastructure modelling and analysis process to infrastructure networks, through using individual infrastructure assets and their related projects as the basis of the network analysis process. It is recognised that the infrastructure manager is required to meet, and balance, a number of different objectives, and therefore a number of high level outcome goals for the infrastructure management process have been developed, based on common purpose or measurement scales. These goals form the basis of classifYing the larger set of multiple objectives for analysis purposes. A two stage approach that rationalises then weights objectives, using a paired comparison process, ensures that the objectives required to be met are both kept to the minimum number required and are fairly weighted. Qualitative variables are incorporated into the weighting and scoring process, utility functions being proposed where there is risk, or a trade-off situation applies. Variability is considered important in the infrastructure life cycle, the approach used being based on analytical principles but incorporating randomness in variables where required. The modular design of the process permits alternative processes to be used within particular modules, if this is considered a more appropriate way of analysis, provided boundary conditions and requirements for linkages to other modules, are met. Development and use of the methodology has highlighted a number of infrastructure life cycle issues, including data and information aspects, and consequences of change over the life cycle, as well as variability and the other matters discussed above. It has also highlighted the requirement to use judgment where required, and for organisations that own and manage infrastructure to retain intellectual knowledge regarding that infrastructure. It is considered that the methodology discussed in this thesis, which to the author's knowledge has not been developed elsewhere, may be used for the analysis of alternatives, planning, prioritisation of a number of projects, and identification of the principal issues in the infrastructure life cycle.