883 resultados para Project control
Resumo:
Service processes such as financial advice, booking a business trip or conducting a consulting project have emerged as units of analysis of high interest for the business process and service management communities in practice and academia. While the transactional nature of production processes is relatively well understood and deployed, the less predictable and highly interactive nature of service processes still lacks in many areas appropriate methodological grounding. This paper proposes a framework of a process laboratory as a new IT artefact in order to facilitate the holistic analysis and simulation of such service processes. Using financial services as an example, it will be shown how such a process laboratory can be used to reduce the complexity of service process analysis and facilitate operational service process control.
Resumo:
The purpose of this paper is to take a critical look at the question “what is a competent project manager?” and bring some fresh added-value insights. This leads us to analyze the definitions, and assessment approaches of project manager competence. Three major standards as prescribed by PMI, IPMA, and GAPPS are considered for review from an attribute-based and performance-based approach and from a deontological and consequentialist ethics perspectives. Two fundamental tensions are identified: an ethical tension between the standards and the related competence assessment frameworks and a tension between attribute and performance-based approaches. Aristotelian ethical and practical philosophy is brought in to reconcile these differences. Considering ethics of character that rises beyond the normative deontological and consequentialist perspectives is suggested. Taking the mediating role of praxis and phrónêsis between theory and practice into consideration is advocated to resolve the tension between performance and attribute-based approaches to competence assessment.
Resumo:
This project was an innovative approach in developing smart coordination of available energy resources to improve the integration level of PV in distribution network. Voltage and loading issues are considered as the main concerns for future electricity grid which need to be avoided using such resources. A distributed control structure was proposed for the resources in distribution network to avoid noted power quality issues.
Resumo:
Management of project knowledge is a critical factor for project success. Project Management Office (PMO) is a unit within organisations to centrally facilitate, manage and control organisational project for improving the rate of project success. Due to increasing interest of developing PMO, the Project Management Maturity Model (PMMM) has been proposed to develop PMOs gradually. The PMMM contributes to evolvement of PMO from immature to mature level through addressing appropriate PM practices. Despite the importance of project knowledge, it has not been extensively investigated in project environments. In addition, the existing PMMMs not only do not address management of project knowledge, but also they recommend little criteria to assess the maturity of PMO from KM point of view. The absence of KM discussion in current PMMMs was defined as the subject of a research project in order for addressing KM practices at various maturity levels of PMO. In order to address the mentioned gap, a framework has been developed based on the current discussions of both PM and KM. The proposed framework comprises three premises: KM processes and practices, PMMM, and KM Maturity Model (KMMM). The incorporation of KMMM practices at various maturity levels of PMO is one of the significance of this framework. It proposes numbers of KM strategies, processes, and practices to address project knowledge management at various levels PMO. This framework shall be useful guidance for developing PMOs from KM perspective. In other words, it contributes to management of project knowledge, as a key for project success. The proposed framework follows the process-based approach and it could be employed alongside the current PMMMs for PMO development. This paper presents the developed framework, theoretical background, premises, proposed KM practices, and processes to be employed in Project-based Organisations and PMOs. This framework has been examined at numbers of case studies with different maturity levels. The case studies outcomes, which will be subjects for future papers, have not shown any significant contradiction yet, however, more investigations are being conducted to validate the proposed framework.
Resumo:
This thesis investigates the use of building information models for access control and security applications in critical infrastructures and complex building environments. It examines current problems in security management for physical and logical access control and proposes novel solutions that exploit the detailed information available in building information models. The project was carried out as part of the Airports of the Future Project and the research was modelled based on real-world problems identified in collaboration with our industry partners in the project.
Resumo:
FOR SUGAR factories with cogeneration plants major changes to the process stations have been undertaken to reduce the consumption of exhaust steam from the turbines and maximise the generated power. In many cases the process steam consumption has been reduced from greater than 52% on cane to ~40% on cane. The main changes have been to install additional evaporation area at the front of the set, operate the pan stages on vapour from No 1 or No 2 effects and undertake juice heating using vapour bleed from evaporators as far down the set as the penultimate stage. Operationally, one of the main challenges has been to develop a control system for the evaporators that addresses the objectives of juice processing rate (throughput) and steam economy, while producing syrup consistently at the required brix and providing an adequate and consistent vapour pressure for the pan stage operations. The cyclic demand for vapour by batch pans causes process disturbances through the evaporator set and these must be regulated in an effective manner to satisfy the above list of objectives for the evaporator station. The impact of the cyclic pan stage vapour demand has been modelled to define the impact on juice rate, steam economy, syrup brix and head space pressures in the evaporators. Experiences with the control schemes used at Pioneer and Rocky Point Mills are discussed. For each factory the paper provides information on (a) the control system used, the philosophy behind the control system and experiences in reaching the current system for control (b) the performance of the control system to handle the disturbances imposed by the pan stage and operate within other constraints of the factory (c) deficiencies in the current system and plans for further improvements. Other processing changes to boost the performance of the evaporators are also discussed.
Resumo:
This article explores a number of social control strategies on individuals and families actioned by the newly created state-national project during the first decades of Colombian XIX century. With special attention on the discourse of urbanity, also named 'civility or good manners', this paper analyses literary sources produced in the time for molding citizens behaviors in order to incorporate the society into the new paradigm of Modernity.
Resumo:
The nature of construction projects and their delivery exposes participants to accidents and dangers. Safety climate serves as a frame of reference for employees to make sense of safety measures in the workplace and adapt their behaviors. Though safety climate research abounds, fewer efforts are made to investigate the formation of a safety climate. An effort to explore forming psychological safety climate, an operationalization of safety climate at the individual level, is an appropriate starting point. Taking the view that projects are social processes, this paper develops a conceptual framework of forming the psychological safety climate, and provides a preliminary validation. The model suggests that management can create the desired psychological safety climate by efforts from structural, perceptual, interactive, and cultural perspectives. Future empirical research can be built on the model to provide a more comprehensive and coherent picture of the determinants of safety climate.
Resumo:
While many Australian hospitals have good infection control practices, research about the role cleaning in the hospital environment plays in preventing infections is limited.
Resumo:
The inspection of marine vessels is currently performed manually. Inspectors use tools (e.g. cameras and devices for non-destructive testing) to detect damaged areas, cracks, and corrosion in large cargo holds, tanks, and other parts of a ship. Due to the size and complex geometry of most ships, ship inspection is time-consuming and expensive. The EU-funded project INCASS develops concepts for a marine inspection robotic assistant system to improve and automate ship inspections. In this paper, we introduce our magnetic wall–climbing robot: Marine Inspection Robotic Assistant (MIRA). This semiautonomous lightweight system is able to climb a vessels steel frame to deliver on-line visual inspection data. In addition, we describe the design of the robot and its building subsystems as well as its hardware and software components.
Resumo:
The purpose of this study is to examine the current level of stakeholder involvement during the project's planning process. Stakeholders often provide the needed resources and have the ability to control the interaction and resource flows in the network. They also ultimately have strong impact on an organisation's survival, and therefore appropriate management and involvement of key stakeholders should be an important part of any project management plan. A series of literature reviews was conducted to identify and categorise significant phases involved in the planning. For data collection, a questionnaire survey was designed and distributed amongst nearly 200 companies who were involved in the residential building sector in Australia. Results of the analysis demonstrate the engagement levels of the four stakeholder groups involved in the planning process and establish a basis for further stakeholder involvement improvement.
Resumo:
As the social environment begins to create more awareness in the area of conserving the natural environment, a new generation of building has emerged. A trend of constructing buildings that minimise impacts on the environment has been established in the construction industry. Therefore, suitable project management practices have been adopted to efficiently manage the construction of these green buildings. This study aims at investigating practices of project management in traditional and accredited green construction projects, with the purpose of discovering if Green Project Management (GPM) practices can be applied to traditional projects to achieve more successful outcomes. The process of GPM contains what applied to traditional projects, could possibly result in benefits in terms of budget control and constructability. Currently the construction industry has been known to suffer difficulties within these areas; therefore GPM practices could possibly hold a solution to these common problems.
Resumo:
The aim of this project was to evaluate the cost-effectiveness of hand hygiene interventions in resource-limited hospital settings. Using data from north-east Thailand, the research found that such interventions are likely to be very cost-effective in intensive care unit settings as a result of reduced incidence of methicillin-resistant Staphylococcus aureus bloodstream infection alone. This study also found evidence showing that the World Health Organization's (WHO) multimodal intervention is effective and when adding either goal-setting, reward incentives, or accountability strategies to the WHO intervention, compliance could be further improved.
Resumo:
As a first step to better targeting the activities of a project for improving management of western flower thrips, Frankliniella occidentialis, (WFT) in field grown vegetable crops, we surveyed growers, consultants and other agribusiness personnel in two regions of Queensland. Using face-to-face interviews, we collected data on key pests and measures used to manage them, the importance of WFT and associated viral diseases, sources of pest management information and additional skills and knowledge needed by growers and industry. Responses were similar in the two regions. While capsicum growers in one northern Queensland district had suffered serious losses from WFT damage in 2002, in general the pest was not seen as a major problem. In cucurbit crops, the silverleaf whitefly (Bemisia tabaci biotype B) was considered the most difficult insect pest to manage. Pest control tactics were largely based on pesticides although many respondents mentioned non-chemical methods such as good farm hygiene practices, control of weed hosts and regular crop monitoring, particularly when prompted. Respondents wanted to know more about pest identification, biology and damage, spray application and the best use of insecticides. Natural enemies were mentioned infrequently. Keeping up to date with available pesticide options, availability of new chemicals and options for a district-wide approach to managing pests emerged as key issues. Growers identified agricultural distributors, consultants, Queensland Department of Primary Industries staff, other growers and their own experience as important sources of information. Field days, workshops and seminars did not rank highly. Busy vegetable growers wanted these activities to be short and relevant, and preferred to be contacted by post and facsimile rather than email. In response to these results, we are focusing on three core, interrelated project extension strategies: (i) short workshops, seminars and farm walks to provide opportunities for discussion, training and information sharing with growers and their agribusiness advisors; (ii) communication via newsletters and information leaflets; (iii) support for commercialisation of services.
Resumo:
Our evaluation of the predation of calves by wild dogs in the 1990s found that the number of calves killed and frequency of years that calf losses occurred, is higher in baited areas compared to adjoining, non-baited areas of similar size. Calf losses were highest with poor seasonal conditions, low prey numbers and where baited areas were re-colonised by wild dogs soon after baiting. We monitored wild dog “activity” before and after 35 baiting programs in southwest, central west and far north Queensland between 1994 and 2006 and found change in activity depends on the timing of the baiting. Baiting programs conducted between October and April show an increase in dog activity post-baiting (average increase of 219.1%, SEM 100.9, n=9, for programs conducted in October and November; an increase of 82.5%, SEM 54.5, n=7 for programs conducted in March and April; and a decrease in activity of 46.5%, SEM 10.2, n=19 for programs conducted between May and September). We monitored the seasonal activity and dispersal of wild dogs fitted with satellite transmitters 2006 to present. We have found that: • Activity of breeding males and females, whilst rearing and nurturing pups, is focussed around the den between July to September and away from areas of human activity. Activity of breeding groups appears to avoid locations of human activity until juveniles become independent (around late November). • While independent and solitary yearlings often have unstable, elliptically-shaped territories in less favourable areas, members of breeding groups have territories that appear seasonally stable and circular located in more favourable habitats. • Extra-territorial forays of solitary yearlings can be huge, in excess of 200 km. The largest forays we have monitored have occurred when the activity of pack members is focussed around rearing pups and juveniles (August to November). • Where wild dogs have dispersed or had significant territorial expansion, it has occurred within days of baiting programs and onto recently baited properties. • The wild dogs we have tracked have followed netting barrier fences for hundreds of kilometres and lived adjacent to or bypassed numerous grids in the barrier. Based on these studies, we conclude that a proportion of the perceived decline in dog activity between May and September, post baiting, is due to a decline in dog activity in areas associated with human activity. The increase in dog activity post-baiting between October and May (and increased calf predation on baited properties) is likely caused by wild dogs dispersing (juveniles and yearlings) or expanding (adults) their territory into baited, now ‘vacant’, areas. We hypothesise that baiting programs should be focussed in summer and autumn commencing late November as soon as juveniles become independent of adults. We also hypothesise that instead of large, annual or semi-annual baiting programs, laying the same number of baits over 4-6 weeks may be more effective. These hypotheses need to be tested through an adaptive management project.