906 resultados para Project Management Maturity Model


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a framework for project management competence assessment based on participant’s performance and contribution in a simulated environment. The proposed framework considers competence assessment through evidences and the participation of different roles. The system enforces the assessment of individual competences by means of a set of performance indicators. A specific case study is presented and the relationship between exhibited transversal competences and project quality is analysed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since 2010 the Industrial Engineering School at Universidad Politécnica de Madrid (ETSII UPM) has its Plan Study accredited by ABET. Since then a big motivation has been promoted from the management team encouraging teachers to work on the measurement and strengthening of student¿s competences. Generic skills or behavior acquired significant importance in the workplace, particularly in relation to project management. Because of this, and framed within the requirements of the European Higher Education Area (EHEA), the curriculum of the new degrees are being developed under the competence-based learning. This situation leads to the need to have a clear measurement tool skills as a basis for developing them within the curriculum. A group of multidisciplinary teachers have been working together during two years to design measuring instruments valid for engineering students.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article shows how a very small company has tailored Scrum according to its own needs. The main additions made were the “sprint design” phase and the “sprint test” phase. Before the sprint 0, the requirements elicitation and the functional specification were made in order to meet deadlines and costs agreed with clients. Besides, the introduction of an agile project management tool has supported all the process and it is considered the main success factor for the institutionalization of the Scrum process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Includes bibliographical references (p. 48-49).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Bibliography: p. 123-127

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Uses research in a major UK company on the introduction of an electronic document management system to explore perceptions of, and attitudes to, risk. Phenomenological methods were used; with subsequent dialogue transcripts evaluated with Winmax dialogue software, using an adapted theoretical framework based upon an analysis of the literature. The paper identifies a number of factors, and builds a framework, that should support a greater understanding of risk assessment and project management by the academic community and practitioners.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Indian petroleum industry is passing through a very dynamic business environment due to the liberalisation of many government policies, vertical integration among organisations and the presence of multinational companies. This caused a competitive environment among the organisations in the Indian petroleum industry in the public sector. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered one of the means for remaining competitive in this business environment. However, present project management practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the issues in managing projects of the organisation in the Indian petroleum sector with the involvement of the executives in a workshop environment. This also suggests some remedial measures for resolving those issues through identifying critical success factors and enablers. The enablers not only resolve the present issues but also ensure superior performance. These are analysed in a quantitative framework to derive improvement measures in project management practices.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Healthcare professionals routinely deploy various quality management tools and techniques in order to improve performance of healthcare delivery. However, they are characterised by fragmented approach i.e., they are not linked with the strategic intent of the organisation. This study introduces a holistic quality improvement method, which integrates all quality improvement projects with the strategic intent of the healthcare organisations. It first identifies a healthcare system and its environment. The Strengths, Weaknesses, Opportunities and Threats (SWOT) of the system are then derived with the involvement of the concerned stakeholders. This leads to developing the strategies in order to satisfy customers in line with the organisation's competitive position. These strategies help identify a few projects, the implementation of which ensures achievement of desired quality. The projects are then prioritised with the involvement of the concerned stakeholders and implemented in order to improve the system performance. The effectiveness of the method has been demonstrated using a case study of an intensive care unit at the Eric Williams Medical Sciences Complex Hospital in Trinidad. Copyright © 2007 Inderscience Enterprises Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Eight steps for projectizing continuous improvement to deliver desired change