947 resultados para Project 2004-011-B : Code Checking – Phase 2


Relevância:

100.00% 100.00%

Publicador:

Resumo:

B-1 Medicaid Reports -- The monthly Medicaid series of eight reports provide summaries of Medicaid eligibles, recipients served, and total payments by county, category of service, and aid category. These reports may also be known as the B-1 Reports. These reports are each available as a PDF for printing or as a CSV file for data analysis. Report Report name IAMM1800-R001--Medically Needy by County - No Spenddown and With Spenddown; IAMM1800-R002--Total Medically Needy, All Other Medicaid, and Grand Total by County; IAMM2200-R002--Monthly Expenditures by Category of Service; IAMM2200-R003--Fiscal YTD Expenditures by Category of Service; IAMM3800-R001--ICF & ICF-MR Vendor Payments by County; IAMM4400-R001--Monthly Expenditures by Eligibility Program; IAMM4400-R002--Monthly Expenditures by Category of Service by Program; IAMM4600-R002--Elderly Waiver Summary by County.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

B-1 Medicaid Reports -- The monthly Medicaid series of eight reports provide summaries of Medicaid eligibles, recipients served, and total payments by county, category of service, and aid category. These reports may also be known as the B-1 Reports. These reports are each available as a PDF for printing or as a CSV file for data analysis. Report Report name IAMM1800-R001--Medically Needy by County - No Spenddown and With Spenddown; IAMM1800-R002--Total Medically Needy, All Other Medicaid, and Grand Total by County; IAMM2200-R002--Monthly Expenditures by Category of Service; IAMM2200-R003--Fiscal YTD Expenditures by Category of Service; IAMM3800-R001--ICF & ICF-MR Vendor Payments by County; IAMM4400-R001--Monthly Expenditures by Eligibility Program; IAMM4400-R002--Monthly Expenditures by Category of Service by Program; IAMM4600-R002--Elderly Waiver Summary by County.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

B-1 Medicaid Reports -- The monthly Medicaid series of eight reports provide summaries of Medicaid eligibles, recipients served, and total payments by county, category of service, and aid category. These reports may also be known as the B-1 Reports. These reports are each available as a PDF for printing or as a CSV file for data analysis. Report Report name IAMM1800-R001--Medically Needy by County - No Spenddown and With Spenddown; IAMM1800-R002--Total Medically Needy, All Other Medicaid, and Grand Total by County; IAMM2200-R002--Monthly Expenditures by Category of Service; IAMM2200-R003--Fiscal YTD Expenditures by Category of Service; IAMM3800-R001--ICF & ICF-MR Vendor Payments by County; IAMM4400-R001--Monthly Expenditures by Eligibility Program; IAMM4400-R002--Monthly Expenditures by Category of Service by Program; IAMM4600-R002--Elderly Waiver Summary by County.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

B-1 Medicaid Reports -- The monthly Medicaid series of eight reports provide summaries of Medicaid eligibles, recipients served, and total payments by county, category of service, and aid category. These reports may also be known as the B-1 Reports. These reports are each available as a PDF for printing or as a CSV file for data analysis. Report Report name IAMM1800-R001--Medically Needy by County - No Spenddown and With Spenddown; IAMM1800-R002--Total Medically Needy, All Other Medicaid, and Grand Total by County; IAMM2200-R002--Monthly Expenditures by Category of Service; IAMM2200-R003--Fiscal YTD Expenditures by Category of Service; IAMM3800-R001--ICF & ICF-MR Vendor Payments by County; IAMM4400-R001--Monthly Expenditures by Eligibility Program; IAMM4400-R002--Monthly Expenditures by Category of Service by Program; IAMM4600-R002--Elderly Waiver Summary by County.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

B-1 Medicaid Reports -- The monthly Medicaid series of eight reports provide summaries of Medicaid eligibles, recipients served, and total payments by county, category of service, and aid category. These reports may also be known as the B-1 Reports. These reports are each available as a PDF for printing or as a CSV file for data analysis. Report Report name IAMM1800-R001--Medically Needy by County - No Spenddown and With Spenddown; IAMM1800-R002--Total Medically Needy, All Other Medicaid, and Grand Total by County; IAMM2200-R002--Monthly Expenditures by Category of Service; IAMM2200-R003--Fiscal YTD Expenditures by Category of Service; IAMM3800-R001--ICF & ICF-MR Vendor Payments by County; IAMM4400-R001--Monthly Expenditures by Eligibility Program; IAMM4400-R002--Monthly Expenditures by Category of Service by Program; IAMM4600-R002--Elderly Waiver Summary by County.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

B-1 Medicaid Reports -- The monthly Medicaid series of eight reports provide summaries of Medicaid eligibles, recipients served, and total payments by county, category of service, and aid category. These reports may also be known as the B-1 Reports. These reports are each available as a PDF for printing or as a CSV file for data analysis. Report Report name IAMM1800-R001--Medically Needy by County - No Spenddown and With Spenddown; IAMM1800-R002--Total Medically Needy, All Other Medicaid, and Grand Total by County; IAMM2200-R002--Monthly Expenditures by Category of Service; IAMM2200-R003--Fiscal YTD Expenditures by Category of Service; IAMM3800-R001--ICF & ICF-MR Vendor Payments by County; IAMM4400-R001--Monthly Expenditures by Eligibility Program; IAMM4400-R002--Monthly Expenditures by Category of Service by Program; IAMM4600-R002--Elderly Waiver Summary by County.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

B-1 Medicaid Reports -- The monthly Medicaid series of eight reports provide summaries of Medicaid eligibles, recipients served, and total payments by county, category of service, and aid category. These reports may also be known as the B-1 Reports. These reports are each available as a PDF for printing or as a CSV file for data analysis. Report Report name IAMM1800-R001--Medically Needy by County - No Spenddown and With Spenddown; IAMM1800-R002--Total Medically Needy, All Other Medicaid, and Grand Total by County; IAMM2200-R002--Monthly Expenditures by Category of Service; IAMM2200-R003--Fiscal YTD Expenditures by Category of Service; IAMM3800-R001--ICF & ICF-MR Vendor Payments by County; IAMM4400-R001--Monthly Expenditures by Eligibility Program; IAMM4400-R002--Monthly Expenditures by Category of Service by Program; IAMM4600-R002--Elderly Waiver Summary by County.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

B-1 Medicaid Reports -- The monthly Medicaid series of eight reports provide summaries of Medicaid eligibles, recipients served, and total payments by county, category of service, and aid category. These reports may also be known as the B-1 Reports. These reports are each available as a PDF for printing or as a CSV file for data analysis. Report Report name IAMM1800-R001--Medically Needy by County - No Spenddown and With Spenddown; IAMM1800-R002--Total Medically Needy, All Other Medicaid, and Grand Total by County; IAMM2200-R002--Monthly Expenditures by Category of Service; IAMM2200-R003--Fiscal YTD Expenditures by Category of Service; IAMM3800-R001--ICF & ICF-MR Vendor Payments by County; IAMM4400-R001--Monthly Expenditures by Eligibility Program; IAMM4400-R002--Monthly Expenditures by Category of Service by Program; IAMM4600-R002--Elderly Waiver Summary by County.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Introducción: El tratamiento con antagonistas del factor de necrosis tumoral alfa (anti TNF) ha impactado el pronóstico y la calidad de vida de los pacientes con artritis reumatoide (AR) positivamente, sin embargo, se interroga un incremento en el riesgo de desarrollar melanoma. Objetivo: Conocer la asociación entre el uso de anti TNF y el desarrollo de melanoma maligno en pacientes con AR. Metodología: Se realizó una búsqueda sistemática en MEDLINE, EMBASE, COCHRANE LIBRARY y LILACS para ensayos clínicos, estudios observacionales, revisiones y meta-análisis en pacientes adultos con diagnóstico de AR y manejo con anti TNF (Certolizumab pegol, Adalimumab, Etanercept, Infliximab y Golimumab). Resultados: 37 estudios clínicos cumplieron los criterios de inclusión para el meta-análisis, con una población de 16567 pacientes. El análisis de heterogeneidad no fue significativo (p=1), no se encontró diferencia en el riesgo entre los grupos comparados DR -0.00 (IC 95% -0.001; -0.001). Un análisis adicional de los estudios en los que se reportó al menos 1 caso de melanoma (4222 pacientes) tampoco mostró diferencia en el riesgo DR -0.00 (IC 95% -0.004 ; -0.003). Conclusión: En la evidencia disponible a la fecha no encontramos asociación significativa entre el tratamiento con anti TNF en pacientes con diagnóstico de AR y el desarrollo de melanoma cutáneo.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Con la creciente popularidad de las soluciones de IT como factor clave para aumentar la competitividad y la creación de valor para las empresas, la necesidad de invertir en proyectos de IT se incrementa considerablemente. La limitación de los recursos como un obstáculo para invertir ha obligado a las empresas a buscar metodologías para seleccionar y priorizar proyectos, asegurándose de que las decisiones que se toman son aquellas que van alineadas con las estrategias corporativas para asegurar la creación de valor y la maximización de los beneficios. Esta tesis proporciona los fundamentos para la implementación del Portafolio de dirección de Proyectos de IT (IT PPM) como una metodología eficaz para la gestión de proyectos basados en IT, y una herramienta para proporcionar criterios claros para los directores ejecutivos para la toma de decisiones. El documento proporciona la información acerca de cómo implementar el IT PPM en siete pasos, el análisis de los procesos y las funciones necesarias para su ejecución exitosa. Además, proporciona diferentes métodos y criterios para la selección y priorización de proyectos. Después de la parte teórica donde se describe el IT PPM, la tesis aporta un análisis del estudio de caso de una empresa farmacéutica. La empresa ya cuenta con un departamento de gestión de proyectos, pero se encontró la necesidad de implementar el IT PPM debido a su amplia cobertura de procesos End-to-End en Proyectos de IT, y la manera de asegurar la maximización de los beneficios. Con la investigación teórica y el análisis del estudio de caso, la tesis concluye con una definición práctica de un modelo aproximado IT PPM como una recomendación para su implementación en el Departamento de Gestión de Proyectos.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Revisión sistemática de la literatura tomando ensayos clínicos aleatorizados sobre el uso de la inyección intraprostática de la toxina botulínica en los pacientes con hiperplasia prostática benigna evaluando una escala validada de síntomas del tracto urinario bajo como desenlace primario

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Esta investigación se centra en la Fédération Internationale de Football Association (FIFA) como organización política. Intenta responder dos interrogantes primordiales: 1) ¿cómo la FIFA ha constituido el poder que tiene actualmente y, así, hacerse del monopolio indiscutido del fútbol? Y 2) ¿cómo ha cambiado en el tiempo la política interna de FIFA y su vínculo con la política internacional? Para lograr esto, se realiza un estudio histórico, basado principalmente en documentos, que intenta caracterizar y analizar los cambios de la organización en el tiempo. Se enfatizan las últimas dos presidencias de FIFA, de João Havelange y Joseph Blatter, como casos de estudio.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Acid mine drainage (AMD) is a widespread environmental problem associated with both working and abandoned mining operations. As part of an overall strategy to determine a long-term treatment option for AMD, a pilot passive treatment plant was constructed in 1994 at Wheat Jane Mine in Cornwall, UK. The plant consists of three separate systems; each containing aerobic reed beds, anaerobic cell and rock filters, and represents the largest European experimental facility of its kind. The systems only differ by the type of pre-treatment utilised to increase the pH of the influent minewater (pH<4): lime-dosed (LD), anoxic limestone drain (ALD) and lime free (LF), which receives no form of pre-treatment. The Wheal Jane pilot plant offered a unique facility and a major research project was established to evaluate the pilot plant and study in detail the biological mechanisms and the geochemical and physical processes that control passive treatment systems. The project has led to data, knowledge, models and design criteria for the future design, planning and sustainable management of passive treatment systems. A multidisciplinary team of scientists and managers from the U.K. universities, the Environment Agency and the Mining Industry has been put together to obtain the maximum advantage from the excellent facilities facility at Wheal Jane. (C) 2004 Elseaier B.V All rights reserved.