973 resultados para Modular application system


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa State University of Science and Technology Accounts Receivable System for the period of March 29, 2010 through May 6, 2010

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Report on a review of selected application controls over the University of Northern Iowa Non-Student Accounts Receivable System for the period June 10, 2010 through July 23, 2010

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Report on a review of selected application controls over the Iowa Department of Human Services’ KinderTrack system for the period March 12, 2010 through April 2, 2010

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Achieving a high degree of dependability in complex macro-systems is challenging. Because of the large number of components and numerous independent teams involved, an overview of the global system performance is usually lacking to support both design and operation adequately. A functional failure mode, effects and criticality analysis (FMECA) approach is proposed to address the dependability optimisation of large and complex systems. The basic inductive model FMECA has been enriched to include considerations such as operational procedures, alarm systems. environmental and human factors, as well as operation in degraded mode. Its implementation on a commercial software tool allows an active linking between the functional layers of the system and facilitates data processing and retrieval, which enables to contribute actively to the system optimisation. The proposed methodology has been applied to optimise dependability in a railway signalling system. Signalling systems are typical example of large complex systems made of multiple hierarchical layers. The proposed approach appears appropriate to assess the global risk- and availability-level of the system as well as to identify its vulnerabilities. This enriched-FMECA approach enables to overcome some of the limitations and pitfalls previously reported with classical FMECA approaches.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The anaerobically inducible arcDABC operon encodes the enzymes of the arginine deiminase pathway in Pseudomonas aeruginosa. Upon induction, the arcAB mRNAs and proteins reach high intracellular levels, because of a strong anaerobically controlled promoter and mRNA processing in arcD, leading to stable downstream transcripts. We explored the usefulness of this system for the construction of expression vectors. The lacZ gene of Escherichia coli was expressed to the highest levels when fused close to the arc promoter. Insertion of lacZ further downstream into arcA or arcB did not stabilize the intrinsically unstable lacZ mRNA. On the contrary, lacZ mRNA appeared to be a vulnerable endonuclease target destabilizing arcAB mRNAs in the 5'-to-3' direction in P. aeruginosa. The native arc promoter was modified for optional expression in the -10 sequence and in the -40 region, which is a binding site for the anaerobic regulator ANR. In P. aeruginosa grown either anaerobically or with oxygen limitation in unshaken cultures, this promoter was stronger than the induced tac promoter. The P. aeruginosa lipAH genes, which encode extracellular lipase and lipase foldase, respectively, were fused directly to the modified arc promoter in an IncQ vector plasmid. Semianaerobic static cultures of P. aeruginosa PAO1 carrying this recombinant plasmid overproduced extracellular lipase 30-fold during stationary phase compared with the production by strain PAO1 without the plasmid. Severe oxygen limitation, in contrast, resulted in poor lipase productivity despite effective induction of the ANR-dependent promoter, suggesting that secretion of active lipase is blocked by the absence of oxygen. In conclusion, the modified arc promoter is useful for driving the expression of cloned genes in P. aeruginosa during oxygen-limited growth and stationary phase.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Report on a review of selected application controls over the Iowa Department of Transportation’s Payroll System for the period April 12, 2010 through June 30, 2010

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Report on a review of selected general and application controls for the Iowa Department of Education’s Electronic Access System for Iowa Education Records (EASIER) system for the period April 4 through May 10, 2011

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System (IPERS) Legacy and I-Que Pension Administration Systems for the period May 16, 2011 through June 16, 2011

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Department of Administrative Service’s (DAS) Human Resource Information System (HRIS), Payroll, Integrated Information for Iowa (I/3) and E-Payment Engine Systems for the periods April 13, 2009 through May 15, 2009 and April 5, 2010 through May 7, 2010

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Report on a review of selected application controls over the University of Northern Iowa General Ledger System for the period of June 22, 2011 through August 4, 2011

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Report on a review of selected application controls over the Iowa Department of Transportation’s Driver’s License System for the period May 2, 2011 through May 27, 2011

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Report on a review of selected application controls over the Iowa State University of Science and Technology Facilities Planning and Management - Facilities Administrative Management Information System for the period of April 18, 2011 through May 16, 2011

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Department of Human Services’ Medicaid Management Information System for the period April 4, 2011 through April 29, 2011

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System I-Que Pension Administration System for the period June 18, 2012 through July 11, 2012

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa State University of Science and Technology Room and Board System for the period of April 9, 2012 through May 1, 2012