999 resultados para Machine costs


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A diagnostic method based on Bayesian Networks (probabilistic graphical models) is presented. Unlike conventional diagnostic approaches, in this method instead of focusing on system residuals at one or a few operating points, diagnosis is done by analyzing system behavior patterns over a window of operation. It is shown how this approach can loosen the dependency of diagnostic methods on precise system modeling while maintaining the desired characteristics of fault detection and diagnosis (FDD) tools (fault isolation, robustness, adaptability, and scalability) at a satisfactory level. As an example, the method is applied to fault diagnosis in HVAC systems, an area with considerable modeling and sensor network constraints.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes a vision-based airborne collision avoidance system developed by the Australian Research Centre for Aerospace Automation (ARCAA) under its Dynamic Sense-and-Act (DSA) program. We outline the system architecture and the flight testing undertaken to validate the system performance under realistic collision course scenarios. The proposed system could be implemented in either manned or unmanned aircraft, and represents a step forward in the development of a “sense-and-avoid” capability equivalent to human “see-and-avoid”.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Previous research has put forward a number of properties of business process models that have an impact on their understandability. Two such properties are compactness and(block-)structuredness. What has not been sufficiently appreciated at this point is that these desirable properties may be at odds with one another. This paper presents the results of a two-pronged study aimed at exploring the trade-off between compactness and structuredness of process models. The first prong of the study is a comparative analysis of the complexity of a set of unstructured process models from industrial practice and of their corresponding structured versions. The second prong is an experiment wherein a cohort of students was exposed to semantically equivalent unstructured and structured process models. The key finding is that structuredness is not an absolute desideratum vis-a-vis for process model understandability. Instead, subtle trade-offs between structuredness and other model properties are at play.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The primary genetic risk factor in multiple sclerosis (MS) is the HLA-DRB1*1501 allele; however, much of the remaining genetic contribution to MS has yet to be elucidated. Several lines of evidence support a role for neuroendocrine system involvement in autoimmunity which may, in part, be genetically determined. Here, we comprehensively investigated variation within eight candidate hypothalamic-pituitary-adrenal (HPA) axis genes and susceptibility to MS. A total of 326 SNPs were investigated in a discovery dataset of 1343 MS cases and 1379 healthy controls of European ancestry using a multi-analytical strategy. Random Forests, a supervised machine-learning algorithm, identified eight intronic SNPs within the corticotrophin-releasing hormone receptor 1 or CRHR1 locus on 17q21.31 as important predictors of MS. On the basis of univariate analyses, six CRHR1 variants were associated with decreased risk for disease following a conservative correction for multiple tests. Independent replication was observed for CRHR1 in a large meta-analysis comprising 2624 MS cases and 7220 healthy controls of European ancestry. Results from a combined meta-analysis of all 3967 MS cases and 8599 controls provide strong evidence for the involvement of CRHR1 in MS. The strongest association was observed for rs242936 (OR = 0.82, 95% CI = 0.74-0.90, P = 9.7 × 10-5). Replicated CRHR1 variants appear to exist on a single associated haplotype. Further investigation of mechanisms involved in HPA axis regulation and response to stress in MS pathogenesis is warranted. © The Author 2010. Published by Oxford University Press. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sourcing funding for the provision of new urban infrastructure has been a policy dilemma for governments around the world for decades. This is particularly relevant in high growth areas where new services are required to support swelling populations. Existing communities resist the introduction of new taxes to fund such infrastructure, hence the introduction of charges to the developer has flourished. The Australian infrastructure funding policy dilemmas are reflective of similar matters to some extent in the United Kingdom, and to a greater extent the United States of America. In these countries, infrastructure cost recovery policies have been in place since the 1940’s and 1970’s respectively. There is an extensive body of theoretical and empirical literature that discusses the passing on (to home buyers) or passing back (to the englobo land seller) of these increased infrastructure charges, and the corresponding impact on housing cost and supply. The purpose of this research is to examine the international evidence that suggests infrastructure charges contribute to increased house prices as well as reduced land supply. The paper concludes that whilst the theoretical work is largely consistent, the empirical research to date is inconclusive and further research is required into these impacts in Australia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Article in Courier Mail. Friday July 22, 2011.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The decision in QCOAL Pty Ltd v Cliffs Australia Coal Pty Ltd [2010] QSC 479 involved an examination of a number of issues relating to the assessment of costs under the Legal Profession Act 2007 (Qld). The decision highlights a range of issues which, in slightly different circumstances, may have deprived the successful party of the right to recover costs by reference to the costs agreement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article examines the decision in Turner v Mitchells Solicitors [2011] QDC 61 and the issue whether an application for assessment of costs under an interim bill at the time of a final bill is subject to the usual 12-month restriction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper investigates train scheduling problems when prioritised trains and non-prioritised trains are simultaneously traversed in a single-line rail network. In this case, no-wait conditions arise because the prioritised trains such as express passenger trains should traverse continuously without any interruption. In comparison, non-prioritised trains such as freight trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available, which is thought of as a relaxation of no-wait conditions. With thorough analysis of the structural properties of the No-Wait Blocking Parallel-Machine Job-Shop-Scheduling (NWBPMJSS) problem that is originated in this research, an innovative generic constructive algorithm (called NWBPMJSS_Liu-Kozan) is proposed to construct the feasible train timetable in terms of a given order of trains. In particular, the proposed NWBPMJSS_Liu-Kozan constructive algorithm comprises several recursively-used sub-algorithms (i.e. Best-Starting-Time-Determination Procedure, Blocking-Time-Determination Procedure, Conflict-Checking Procedure, Conflict-Eliminating Procedure, Tune-up Procedure and Fine-tune Procedure) to guarantee feasibility by satisfying the blocking, no-wait, deadlock-free and conflict-free constraints. A two-stage hybrid heuristic algorithm (NWBPMJSS_Liu-Kozan-BIH) is developed by combining the NWBPMJSS_Liu-Kozan constructive algorithm and the Best-Insertion-Heuristic (BIH) algorithm to find the preferable train schedule in an efficient and economical way. Extensive computational experiments show that the proposed methodology is promising because it can be applied as a standard and fundamental toolbox for identifying, analysing, modelling and solving real-world scheduling problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In practice, parallel-machine job-shop scheduling (PMJSS) is very useful in the development of standard modelling approaches and generic solution techniques for many real-world scheduling problems. In this paper, based on the analysis of structural properties in an extended disjunctive graph model, a hybrid shifting bottleneck procedure (HSBP) algorithm combined with Tabu Search metaheuristic algorithm is developed to deal with the PMJSS problem. The original-version SBP algorithm for the job-shop scheduling (JSS) has been significantly improved to solve the PMJSS problem with four novelties: i) a topological-sequence algorithm is proposed to decompose the PMJSS problem into a set of single-machine scheduling (SMS) and/or parallel-machine scheduling (PMS) subproblems; ii) a modified Carlier algorithm based on the proposed lemmas and the proofs is developed to solve the SMS subproblem; iii) the Jackson rule is extended to solve the PMS subproblem; iv) a Tabu Search metaheuristic algorithm is embedded under the framework of SBP to optimise the JSS and PMJSS cases. The computational experiments show that the proposed HSBP is very efficient in solving the JSS and PMJSS problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

On 2 December 1998, the Federal Government tabled their policy paper entitled Regulation Impact Statement for the Introduction of a Goods and Services Tax (RIS) in the House of Representatives. The Federal Government predicted that total gross GST compliance costs to Australian businesses in the first year of implementation would be approximately $1,912 million (or $1,195 per firm). Furthermore, it is estimated that the recurrent net compliance costs will be much lower at $131 per firm. Whilst the government made brief references to charitable organisations in their analysis, it stated that the compliance costs faced by nonprofits would, in substance, be no different to the compliance costs faced by businesses or government departments. This paper examines the RIS process in relation to nonprofit organisations in the context of recent taxation legislation affecting nonprofit organisations. It argues that the assumption that nonprofit compliance costs are similar to government and business costs is flawed and makes a case for the RIS process to be reformed to include more appropriate assessments of the impact of legislation on nonprofit enterprises.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Toolbox, combined with MATLAB ® and a modern workstation computer, is a useful and convenient environment for investigation of machine vision algorithms. For modest image sizes the processing rate can be sufficiently ``real-time'' to allow for closed-loop control. Focus of attention methods such as dynamic windowing (not provided) can be used to increase the processing rate. With input from a firewire or web camera (support provided) and output to a robot (not provided) it would be possible to implement a visual servo system entirely in MATLAB. Provides many functions that are useful in machine vision and vision-based control. Useful for photometry, photogrammetry, colorimetry. It includes over 100 functions spanning operations such as image file reading and writing, acquisition, display, filtering, blob, point and line feature extraction, mathematical morphology, homographies, visual Jacobians, camera calibration and color space conversion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An earlier study by the Asian Development Bank (ADB) showed that the annual cost of road traffic accidents in 2001 was S$699.36 million which was 0.5% of the annual GDP. This paper attempts to update of the cost estimates of road traffic accidents. More precise methods of computing the human cost, lost output and property damage are adopted which grew in an annual cost of S$610.3 million or 0.338% of the annual GDP in 2003. A more conservative estimate of S$878,000 for fatal accident is also obtained, compared to the earlier figure of S$1.4 million. This study has shown that it is necessary to update the annual traffic accident costs regularly, as the figures vary with the number of accidents which change with time.

Relevância:

20.00% 20.00%

Publicador: