918 resultados para Life Cycle Assessment fermentazione anaerobica FORSU rifiuto organico compostaggio biowaste energia rinnovabile compost


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Queensland Department of Main Roads, Australia, spends approximately A$ 1 billion annually for road infrastructure asset management. To effectively manage road infrastructure, firstly road agencies not only need to optimise the expenditure for data collection, but at the same time, not jeopardise the reliability in using the optimised data to predict maintenance and rehabilitation costs. Secondly, road agencies need to accurately predict the deterioration rates of infrastructures to reflect local conditions so that the budget estimates could be accurately estimated. And finally, the prediction of budgets for maintenance and rehabilitation must provide a certain degree of reliability. This paper presents the results of case studies in using the probability-based method for an integrated approach (i.e. assessing optimal costs of pavement strength data collection; calibrating deterioration prediction models that suit local condition and assessing risk-adjusted budget estimates for road maintenance and rehabilitation for assessing life-cycle budget estimates). The probability concept is opening the path to having the means to predict life-cycle maintenance and rehabilitation budget estimates that have a known probability of success (e.g. produce budget estimates for a project life-cycle cost with 5% probability of exceeding). The paper also presents a conceptual decision-making framework in the form of risk mapping in which the life-cycle budget/cost investment could be considered in conjunction with social, environmental and political issues.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Road infrastructure has been considered as one of the most expensive and extensive infrastructure assets of the built environment globally. This asset also impacts the natural environment significantly during different phases of life e.g. construction, use, maintenance and end-of-life. The growing emphasis for sustainable development to meet the needs of future generations requires mitigation of the environmental impacts of road infrastructure during all phases of life e.g. construction, operation and end-of-life disposal (as required). Life-cycle analysis (LCA), a method of quantification of all stages of life, has recently been studied to explore all the environmental components of road projects due to limitations of generic environmental assessments. The LCA ensures collection and assessment of the inputs and outputs relating to any potential environmental factor of any system throughout its life. However, absence of a defined system boundary covering all potential environmental components restricts the findings of the current LCA studies. A review of the relevant published LCA studies has identified that environmental components such as rolling resistance of pavement, effect of solar radiation on pavement(albedo), traffic congestion during construction, and roadway lighting & signals are not considered by most of the studies. These components have potentially higher weightings for environment damage than several commonly considered components such as materials, transportation and equipment. This paper presents the findings of literature review, and suggests a system boundary model for LCA study of road infrastructure projects covering potential environmental components.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The evaluation of life cycle greenhouse gas emissions from power generation with carbon capture and storage (CCS) is a critical factor in energy and policy analysis. The current paper examines life cycle emissions from three types of fossil-fuel-based power plants, namely supercritical pulverized coal (super-PC), natural gas combined cycle (NGCC) and integrated gasification combined cycle (IGCC), with and without CCS. Results show that, for a 90% CO2 capture efficiency, life cycle GHG emissions are reduced by 75-84% depending on what technology is used. With GHG emissions less than 170 g/kWh, IGCC technology is found to be favorable to NGCC with CCS. Sensitivity analysis reveals that, for coal power plants, varying the CO2 capture efficiency and the coal transport distance has a more pronounced effect on life cycle GHG emissions than changing the length of CO2 transport pipeline. Finally, it is concluded from the current study that while the global warming potential is reduced when MEA-based CO2 capture is employed, the increase in other air pollutants such as NOx and NH3 leads to higher eutrophication and acidification potentials.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

During the PhD program in chemistry, curriculum in environmental chemistry, at the University of Bologna the sustainability of industry was investigated through the application of the LCA methodology. The efforts were focused on the chemical sector in order to investigate reactions dealing with the Green Chemistry and Green Engineering principles, evaluating their sustainability in comparison with traditional pathways by a life cycle perspective. The environmental benefits associated with a reduction in the synthesis steps and the use of renewable feedstock were assessed through a holistic approach selecting two case studies with high relevance from an industrial point of view: the synthesis of acrylonitrile and the production of acrolein. The current approach wants to represent a standardized application of LCA methodology to the chemical sector, which could be extended to several case studies, and also an improvement of the current databases, since the lack of data to fill the inventories of the chemical productions represent a huge limitation, difficult to overcome and that can affects negatively the results of the studies. Results emerged from the analyses confirms that the sustainability in the chemical sector should be evaluated from a cradle-to-gate approach, considering all the stages and flows involved in each pathways in order to avoid shifting the environmental burdens from a steps to another. Moreover, if possible, LCA should be supported by other tools able to investigate the other two dimensions of sustainability represented by the social and economic issues.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

abstract to be added by authors

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of the present research is to characterise the international scene in the field of building refurbishment, by thoroughly reviewing the literature relating to building renovation and systematising the results according to the different aspects considered by the authors. Even though there is certain consensus with respect to the criteria for the selection of energy efficiency measures, the assessment criteria differ broadly and widely. The present work highlights the lack of consensus on the assessment criteria and the need of harmonization. A holistic view is required in order to identify the most sustainable strategies in each particular case, considering social, environmental and economic impacts from a life cycle perspective.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the European context of upgrading the housing stock energy performance, multiple barriers hinder the wide uptake of sustainable retrofitting practices. Moreover, some of these may imply negative effects often disregarded. Policy makers need to identify how to increase and improve retrofitting practices from the comprehensive point of view of sustainability. None of the existing assessment tools addresses all the issues relevant for sustainable development in a local situation from a life cycle perspective. Life cycle sustainability assessment methodology, or LCSA, analyzes environmental and socioeconomic impacts. The environmental part is quite developed, but the socioeconomic aspect is still challenging. This work proposes socioeconomic criteria to be included in a LCSA to assess retrofitting works in the specific context of Brussels-Capital Region. LCSA feasibility and challenging methodology aspects are discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper discusses challenges to developers of a national Life Cycle Inventory (LCI) database on which to base assessment of building environmental impacts and a key to development of a fully integrated eco-design tool created for automated eco-efficiency assessment of commercial building design direct from 3D CAD. The scope of this database includes Australian and overseas processing burdens involved in acquiring, processing, transporting, fabricating, finishing and using metals, masonry, timber, glazing, ceramics, plastics, fittings, composites and coatings. Burdens are classified, calculated and reported for all flows of raw materials, fuels, energy and emissions to and from the air, soil and water associated with typical products and services in building construction, fitout and operation. The aggregated life cycle inventory data provides the capacity to generate environmental impact assessment reports based on accepted performance indicators. Practitioners can identify hot spots showing high environmental burdens of a proposed design and drill down to report on specific building components. They can compare assessments with case studies and operational estimates to assist in eco-efficient design of a building, fitout and operation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sustainable development is about making societal investments. These investments should be in synchronization with the natural environment, trends of social development, as well as organisational and local economies over a long time span. Traditionally in the eyes of clients, project development will need to produce the required profit margins, with some degrees of consideration for other impacts. This is being changed as all citizens of our society are becoming more aware of concepts and challenges such as the climate change, greenhouse footprints, and social dimensions of sustainability, and will in turn demand answers to these issues in built facilities. A large number of R&D projects have focused on the technical advancement and environmental assessment of products and built facilities. It is equally important address the cost/benefit issue, as developers in the world would not want to loose money by investing in built assets. For infrastructure projects, due to its significant cost of development and lengthy delivery time, presenting the full money story of going green is of vital importance. Traditional views of life-cycle costing tend to focus on the pure economics of a construction project. Sustainability concepts are not broadly integrated with the current LCCA in the construction sector. To rectify this problem, this paper reports on the progress to date of developing and extending contemporary LCCA models in the evaluation of road infrastructure sustainability. The suggested new model development is based on sustainability indicators identified through previous research, and incorporating industry verified cost elements of sustainability measures. The on-going project aims to design and a working model for sustainability life-cycle costing analysis for this type of infrastructure projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Current building regulations are generally prescriptive in nature. It is widely accepted in Europe that this form of building regulation is stifling technological innovation and leading to inadequate energy efficiency in the building stock. This has increased the motivation to move design practices towards a more ‘performance-based’ model in order to mitigate inflated levels of energy-use consumed by the building stock. A performance based model assesses the interaction of all building elements and the resulting impact on holistic building energy-use. However, this is a nebulous task due to building energy-use being affected by a myriad of heterogeneous agents. Accordingly, it is imperative that appropriate methods, tools and technologies are employed for energy prediction, measurement and evaluation throughout the project’s life cycle. This research also considers that it is imperative that the data is universally accessible by all stakeholders. The use of a centrally based product model for exchange of building information is explored. This research describes the development and implementation of a new building energy-use performance assessment methodology. Termed the Building Effectiveness Communications ratios (BECs) methodology, this performance-based framework is capable of translating complex definitions of sustainability for energy efficiency and depicting universally understandable views at all stage of the Building Life Cycle (BLC) to the project’s stakeholders. The enabling yardsticks of building energy-use performance, termed Ir and Pr, provide continuous design and operations feedback in order to aid the building’s decision makers. Utilised effectively, the methodology is capable of delivering quality assurance throughout the BLC by providing project teams with quantitative measurement of energy efficiency. Armed with these superior enabling tools for project stakeholder communication, it is envisaged that project teams will be better placed to augment a knowledge base and generate more efficient additions to the building stock.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tese de doutoramento, Biologia (Biologia Marinha e Aquacultura), Universidade de Lisboa, Faculdade de Ciências, 2015

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The UK has adopted legally binding carbon reduction targets of 34% by 2020 and 80% by 2050 (measured against the 1990 baseline). Buildings are estimated to be responsible for more than 50% of greenhouse gas (GHG) emissions in the UK. These consist of both operational, produced during use, and embodied, produced during manufacture of materials and components, and during construction, refurbishments and demolition. A brief assessment suggests that it is unlikely that UK emission reduction targets can be met without substantial reductions in both Oc and Ec. Oc occurs over the lifetime of a building whereas the bulk of Ec occurs at the start of a building’s life. A time value for emissions could influence the decision making process when it comes to comparing mitigation measures which have benefits that occur at different times. An example might be the choice between building construction using low Ec construction materials versus building construction using high Ec construction materials but with lower Oc, although the use of high Ec materials does not necessarily imply a lower Oc. Particular time related issues examined here are: the urgency of the need to achieve large emissions reductions during the next 10 to 20 years; the earlier effective action is taken, the less costly it will be; future reduction in carbon intensity of energy supply; the carbon cycle and relationship between the release of GHG’s and their subsequent concentrations in the atmosphere. An equation is proposed, which weights emissions according to when they occur during the building life cycle, and which effectively increases Ec as a proportion of the total, suggesting that reducing Ec is likely to be more beneficial, in terms of climate change, for most new buildings. Thus, giving higher priority to Ec reductions is likely to result in a bigger positive impact on climate change and mitigation costs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building integrated photovoltaic (BiPV) systems generate electricity, but also heat, which is typically wasted and also reduces the efficiency of generation. A heat recovery unit can be combined with a BiPV system to take advantage of this waste heat, thus providing cogeneration. Two different photovoltaic (PV) cell types were combined with a heat recovery unit and analysed in terms of their life-cycle energy consumption to determine the energy payback period. A net energy analysis of these PV systems has previously been performed, but recent improvements in the data used for this study allow for a more comprehensive assessment of the combined energy used throughout the entire life-cycle of these systems to be performed. Energy payback periods between 4 and 16.5 years were found, depending on the BiPV system. The energy embodied in PV systems is significant, emphasised here due to the innovative use of national average input–output (I–O) data to fill gaps in traditional life-cycle inventories, i.e. hybrid analysis. These findings provide an insight into the net energy savings that are possible with a well-designed and managed BiPV system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A holistic approach to low-energy building design is essential to ensure that any efficiency improvement strategies provide a net energy benefit over the life of the building. Previous work by the authors has established a model for informing low-energy building design based on a comparison of the life cycle energy demand associated with a broad range of building assemblies. This model ranks assemblies based on their combined initial and recurrent embodied energy and operational energy demand. The current study applies this model to an actual residential building in order to demonstrate the application of the model for optimising a building’s life cycle energy performance. The aim of this study was to demonstrate how the availability of comparable energy performance information at the building design stage can be used to better optimise a building’s energy performance. The life cycle energy demand of the case study building, located in the temperate climate of Melbourne, Australia, was quantified using a comprehensive embodied energy assessment technique and TRNSYS thermal energy simulation software. The building was then modelled with variations to its external assemblies in an attempt to optimise its life cycle energy performance. The alternative assemblies chosen were those shown through the author’s previous modelling to result in the lowest life cycle energy demand for each building element. The best performing assemblies for each of the main external building elements were then combined into a best-case scenario to quantify the potential life cycle energy savings possible compared to the original building. The study showed that significant life cycle energy savings are possible through the modelling of individual building elements for the case study building. While these findings relate to a very specific case, this study demonstrates the application of a model for optimising building life cycle energy performance that may be applied more broadly during early-stage building design to optimise life cycle energy performance.