985 resultados para Infrastructure wind park
Resumo:
The lava park is surrounded by the volcanic mountains of Les Preses, revealed as the edges of a vast caldera and repeated at a human scale with low walls made up of small volcanic boulders. These walls are evidence of how successive communities have gradually worked amongst this lava flow to create arable land, supported by rich soils. The people saw the land prosper and learned how to maximise its productivity. Boulders that had come to the surface during agricultural cultivation were moved with human labour to create "artigas“, the characteristic pilings of volcanic stone. They have been used to raise and lower areas, to create shelter and exposure for their crops and to make caves for storage. Amongst all this, paths weave and cross. The whole place is made up of grey and black rocks with a constant cover of green crops or grass.
Resumo:
Groningen is a city that collects contemporary projects. A trip around town reveals something like a zoo, with examples of all design languages of the last twenty years, many of them now aging and distinctly past their prime. Even though some of these projects are outdated, this collection not only demonstrates a commitment to design (even occasionally lacking judgement) but also serves an archival function: we can consult the Groningen Zoo of Design to determine the design to determine the design preoccupations of the past and how those often theoretical interests (since most of the work by these designers was not built) manifested themselves in material form on the ground.
Resumo:
Most infrastructure projects share the same characteristics in term of management aspects and shortcomings. Human factor is believed to be the major drawbacks due to the nature of unstructured problems which can further contribute to management conflicts. This growing complexity in infrastructure projects has shift the paradigm of policy makers to adopt Information Communication Technology (ICT) as a driving force. For this reason, it is vital to fully maximise and utilise the recent technologies to accelerate management process particularly in planning phase. Therefore, a lot of tools have been developed to assist decision making in construction project management. The variety of uncertainties and alternatives in decision making can be entertained by using useful tool such as Decision Support System (DSS). However, the recent trend shows that most DSS in this area only concentrated in model development and left few fundamentals of computing. Thus, most of them were found complicated and less efficient to support decision making within project team members. Due to the current incapability of many software aspects, it is desirable for DSS to provide more simplicity, better collaborative platform, efficient data manipulation and reflection to user needs. By considering these factors, the paper illustrates four challenges for future DSS development i.e. requirement engineering, communication framework, data management and interoperability, and software usability
Resumo:
This paper will examine the intersection of design research and problem‐based teaching through the process and outcomes of a four year long ARC funded research project: the Emerging Futures Project. Sustainability is central to the project; in its overall content as well as in the broad aim of determining better outcomes for urban consolidation.
Resumo:
Efficient and effective urban management systems for Ubiquitous Eco Cities require having intelligent and integrated management mechanisms. This integration includes bringing together economic, socio-cultural and urban development with a well orchestrated, transparent and open decision making mechanism and necessary infrastructure and technologies. In Ubiquitous Eco Cities telecommunication technologies play an important role in monitoring and managing activities over wired, wireless or fibre-optic networks. Particularly technology convergence creates new ways in which the information and telecommunication technologies are used and formed the back bone or urban management systems. The 21st Century is an era where information has converged, in which people are able to access a variety of services, including internet and location based services, through multi-functional devices such as mobile phones and provides opportunities in the management of Ubiquitous Eco Cities. This research paper discusses the recent developments in telecommunication networks and trends in convergence technologies and their implications on the management of Ubiquitous Eco Cities and how this technological shift is likely to be beneficial in improving the quality of life and place of residents, workers and visitors. The research paper reports and introduces recent approaches on urban management systems, such as intelligent urban management systems, that are suitable for Ubiquitous Eco Cities.
Resumo:
Construction projects can involve a diverse range of stakeholders and the success of the project depends very much on fulfilling their needs and expectations. It is important, therefore, to identify and recognize project stakeholders and develop a rigorous stakeholder management process. However, limited research has investigated the impact of stakeholders on construction projects in developing countries. A stakeholder impact analysis (SIA), based on an approach developed by Olander (2007), was adopted to investigate the stakeholders' impact on state-owned civil engineering projects in Vietnam. This involved the analysis of a questionnaire survey of 57 project managers to determine the relative importance of different stakeholders. The results show the client to have the highest level of impact on the projects, followed by project managers and the senior management of state-owned engineering firms. The SIA also provides suggestions to project managers in developing and evaluating the stakeholder management process.
Resumo:
Public private partnerships (PPP) have been widely used as a method for public infrastructure project delivery not only locally and internationally, however the adoption of PPPs in social infrastructure procurement has still been very limited. The objective of this paper is to investigate the potential of implementation of current PPP framework in social affordable housing projects in South East Queensland. Data were collected from 22 interviewees with rich experiences in the industry. The findings of this study show that affordable housing investment have been considered by the industry practitioners as a risky business in comparison to other private rental housing investment. The main determents of the adoption of PPPs in social infrastructure project are the tenant-related factors, such as the inability of paying rent and the inability of caring the property. The study also suggests the importance of seeking strategic partnership with community-based organisation that has experiences in managing similar tenants’ profiles. Current PPP guideline is also viewed as inappropriate for the affordable housing projects, but the principle of VFM framework and risk allocation in PPPs still be applied to the affordable housing projects. This study helps to understand the viability of PPP in social housing procurement projects, and point out the importance of developing guideline for multi-stakeholder partnership and the expansion of the current VFM and PPPs guidelines.
Resumo:
Literature on Ubiquitous Eco Cities highlights three key issues to be carefully considered while planning, developing and managing such cities: ‘technology, infrastructure and management’. This paper discusses the recent developments in telecommunication networks, trends in technology convergence and both of their implications on the management of Ubiquitous Eco Cities. The paper also introduces recent approaches on urban management, such as intelligent urban management systems, that are potentially suitable for Ubiquitous Eco Cities.
Resumo:
A successful urban management system for a Ubiquitous Eco City requires an integrated approach. This integration includes bringing together economic, socio-cultural and urban development with a well orchestrated, transparent and open decision making mechanism and necessary infrastructure and technologies. Rapidly developing information and telecommunication technologies and their platforms in the late 20th Century improves urban management and enhances the quality of life and place. Telecommunication technologies provide an important base for monitoring and managing activities over wired, wireless or fibre-optic networks. Particularly technology convergence creates new ways in which the information and telecommunication technologies are used. The 21st Century is an era where information has converged, in which people are able to access a variety of services, including internet and location based services, through multi-functional devices such as mobile phones and provides opportunities in the management of Ubiquitous Eco Cities. This paper discusses the recent developments in telecommunication networks and trends in convergence technologies and their implications on the management of Ubiquitous Eco Cities and how this technological shift is likely to be beneficial in improving the quality of life and place. The paper also introduces recent approaches on urban management systems, such as intelligent urban management systems, that are suitable for Ubiquitous Eco Cities.
Resumo:
Modern enterprise knowledge management systems typically require distributed approaches and the integration of numerous heterogeneous sources of information. A powerful foundation for these tasks can be Topic Maps, which not only provide a semantic net-like knowledge representation means and the possibility to use ontologies for modelling knowledge structures, but also offer concepts to link these knowledge structures with unstructured data stored in files, external documents etc. In this paper, we present the architecture and prototypical implementation of a Topic Map application infrastructure, the ‘Topic Grid’, which enables transparent, node-spanning access to different Topic Maps distributed in a network.
Resumo:
Abstract: Purpose – Several major infrastructure projects in the Hong Kong Special Administrative Region (HKSAR) have been delivered by the build-operate-transfer (BOT) model since the 1960s. Although the benefits of using BOT have been reported abundantly in the contemporary literature, some BOT projects were less successful than the others. This paper aims to find out why this is so and to explore whether BOT is the best financing model to procure major infrastructure projects. Design/methodology/approach – The benefits of BOT will first be reviewed. Some completed BOT projects in Hong Kong will be examined to ascertain how far the perceived benefits of BOT have been materialized in these projects. A highly profiled project, the Hong Kong-Zhuhai-Macau Bridge, which has long been promoted by the governments of the People's Republic of China, Macau Special Administrative Region and the HKSAR that BOT is the preferred financing model, but suddenly reverted back to the traditional financing model to be funded primarily by the three governments with public money instead, will be studied to explore the true value of the BOT financial model. Findings – Six main reasons for this radical change are derived from the analysis: shorter take-off time for the project; difference in legal systems causing difficulties in drafting BOT agreements; more government control on tolls; private sector uninterested due to unattractive economic package; avoid allegation of collusion between business and the governments; and a comfortable financial reserve possessed by the host governments. Originality/value – The findings from this paper are believed to provide a better understanding to the real benefits of BOT and the governments' main decision criteria in delivering major infrastructure projects.
Resumo:
The establishment of corporate objectives regarding economic, environmental, social, and ethical responsibilities, to inform business practice, has been gaining credibility in the business sector since the early 1990’s. This is witnessed through (i) the formation of international forums for sustainable and accountable development, (ii) the emergence of standards, systems, and frameworks to provide common ground for regulatory and corporate dialogue, and (iii) the significant quantum of relevant popular and academic literature in a diverse range of disciplines. How then has this move towards greater corporate responsibility become evident in the provision of major urban infrastructure projects? The gap identified, in both academic literature and industry practice, is a structured and auditable link between corporate intent and project outcomes. Limited literature has been discovered which makes a link between corporate responsibility; project performance indicators (or critical success factors) and major infrastructure provision. This search revealed that a comprehensive mapping framework, from an organisation’s corporate objectives through to intended, anticipated and actual outcomes and impacts has not yet been developed for the delivery of such projects. The research problem thus explored is ‘the need to better identify, map and account for the outcomes, impacts and risks associated with economic, environmental, social and ethical outcomes and impacts which arise from major economic infrastructure projects, both now, and into the future’. The methodology being used to undertake this research is based on Checkland’s soft system methodology, engaging in action research on three collaborative case studies. A key outcome of this research is a value-mapping framework applicable to Australian public sector agencies. This is a decision-making methodology which will enable project teams responsible for delivering major projects, to better identify and align project objectives and impacts with stated corporate objectives.
Resumo:
Road and highway infrastructure provides the backbone for a nation's economic growth. The versatile dispersion of population in Australia, from sparsely settled communities in remote areas to regenerated inner city suburbs with high density living in metropolitans, calls for continuing development and improvement on roads infrastructure under the current federal government policies and state governments' strategic plans. As road infrastructure projects involve large resources and mechanism, achieving sustainability not only in economic scales but also through environmental and social responsibility becomes a crucial issue. Current efforts are often impeded by different interpretation on sustainability agenda by stakeholders involved in these types of projects. As a result, sustainability deliverables at the project level is not often as transparent and measurable, compared to promises in project briefs and designs. This paper reviews the past studies on sustainable infrastructure construction, focusing on roads and highway projects. Through literature study and consultation with the industry, key sustainability indicators specific to road infrastructure projects have been identified. Based on these findings, this paper introduces an on-going research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, and issues that impact on the gap between sustainability foci and its actual realization at project end level. The exploration helps generate an integrated decision-making model for sustainable road infrastructure projects. The research will promote to the industry more systematic and integrated approaches to decision-making on the implementation of sustainability strategies to achieve deliverable goals throughout the development and delivery process of road infrastructure projects in Australia.