The concept of constructability uses integration art of individual functions through a valuable and timely construction inputs into planning and design development stages. It results in significant savings in cost and time needed to finalize infrastructure projects. However, available constructability principles, developed by CII Australia (1993), do not cover Operation and Maintenance (O&M) phases of projects, whilst major cost and time in multifaceted infrastructure projects are spent in post-occupancy stages. This paper discusses the need to extend the constructability concept by examining current O&M issues in the provision of multifaceted building projects. It highlights available O&M problems and shortcomings of building projects, as well as their causes and reasons in different categories. This initial categorization is an efficient start point for testing probable present O&M issues in various cases of complex infrastructure building projects. This preliminary categorization serve as a benchmark to develop an extended constructability model that considers the whole project life cycle phases rather than a specific phase. It anticipates that the development of an extended constructability model can reduce significant number of reworks, mistakes, extra costs and time wasted during delivery stages of multifaceted building projects.
Resumo:
Public awareness of large infrastructure projects, many of which are delivered through networked arrangements is high for several reasons. These projects often involve significant public investment; they may involve multiple and conflicting stakeholders and can potentially have significant environmental impacts (Lim and Yang, 2008). To produce positive outcomes from infrastructure delivery it is imperative that stakeholder “buy in” be obtained particularly about decisions relating to the scale and location of infrastructure. Given the likelihood that stakeholders will have different levels of interest and investment in project outcomes, failure to manage this dynamic could potentially jeopardise project delivery by delaying or halting the construction of essential infrastructure. Consequently, stakeholder engagement has come to constitute a critical activity in infrastructure development delivered through networks. This paper draws on stakeholder theory and governance network theory and provides insights into how three multi-level networks within the Roads Alliance in Queensland engage with stakeholders in the delivery of road infrastructure. New knowledge about stakeholders has been obtained by testing a model of Stakeholder Salience and Engagement which combines and extends the stakeholder identification and salience theory and the ladder of stakeholder management and engagement. By applying this model, the broad research question: “How do governance networks engage with stakeholders?” has been addressed. A multiple embedded case study design was selected as the overall approach to explore, describe, explain and evaluate how stakeholder engagement occurred in three governance networks delivering road infrastructure in Queensland. The outcomes of this research contribute to and extend stakeholder theory by showing how stakeholder salience impacts on decisions about the types of engagement processes implemented. Governance network theory is extended by showing how governance networks interact with stakeholders. From a practical perspective this research provides governance networks with an indication of how to more effectively undertake engagement with different types of stakeholders.
Resumo:
In response to the need to leverage private finance and the lack of competition in some parts of the Australian public sector major infrastructure market, especially in very large economic infrastructure procured using Pubic Private Partnerships, the Australian Federal government has demonstrated its desire to attract new sources of in-bound foreign direct investment (FDI) into the Australian construction market. This paper aims to report on progress towards an investigation into the determinants of multinational contractors’ willingness to bid for Australian public sector major infrastructure projects and which is designed to give an improved understanding of matters surrounding FDI into the Australian construction sector. This research deploys Dunning’s eclectic theory for the first time in terms of in-bound FDI by multinational contractors and as head contractors bidding for Australian major infrastructure public sector projects. Elsewhere, the authors have developed Dunning’s principal hypothesis associated with his eclectic framework in order to suit the context of this research and to address a weakness arising in Dunning’s principal hypothesis that is based on a nominal approach to the factors in the eclectic framework and which fail to speak to the relative explanatory power of these factors. In this paper, an approach to reviewing and analysing secondary data, as part of the first stage investigation in this research, is developed and some illustrations given, vis-à-vis the selected sector (roads, bridges and tunnels) in Australia (as the host location) and using one of the selected home countries (Spain). In conclusion, some tentative thoughts are offered in anticipation of the completion of the first stage investigation - in terms of the extent to which this first stage based on secondary data only might suggest the relative importance of the factors in the eclectic framework. It is noted that more robust conclusions are expected following the future planned stages of the research and these stages including primary data are briefly outlined. Finally, and beyond theoretical contributions expected from the overall approach taken to developing and testing Dunning’s framework, other expected contributions concerning research method and practical implications are mentioned.
Resumo:
In response to the need to leverage private finance and the lack of competition in some parts of the Australian public sector infrastructure market, especially in the very large economic infrastructure sector procured using Pubic Private Partnerships, the Australian Federal government has demonstrated its desire to attract new sources of in-bound foreign direct investment (FDI). This paper aims to report on progress towards an investigation into the determinants of multinational contractors’ willingness to bid for Australian public sector major infrastructure projects. This research deploys Dunning’s eclectic theory for the first time in terms of in-bound FDI by multinational contractors into Australia. Elsewhere, the authors have developed Dunning’s principal hypothesis to suit the context of this research and to address a weakness arising in this hypothesis that is based on a nominal approach to the factors in Dunning's eclectic framework and which fails to speak to the relative explanatory power of these factors. In this paper, a first stage test of the authors' development of Dunning's hypothesis is presented by way of an initial review of secondary data vis-à-vis the selected sector (roads and bridges) in Australia (as the host location) and with respect to four selected home countries (China; Japan; Spain; and US). In doing so, the next stage in the research method concerning sampling and case studies is also further developed and described in this paper. In conclusion, the extent to which the initial review of secondary data suggests the relative importance of the factors in the eclectic framework is considered. It is noted that more robust conclusions are expected following the future planned stages of the research including primary data from the case studies and a global survey of the world’s largest contractors and which is briefly previewed. Finally, and beyond theoretical contributions expected from the overall approach taken to developing and testing Dunning’s framework, other expected contributions concerning research method and practical implications are mentioned.
Resumo:
The concept of constructability integrates individual construction functions and experiences through suitable and timely inputs into early stages of project planning and design. It aims to ease construction processes for a more effective and efficient achievement of overall project objectives. Similarly, the concepts of operability and maintainability integrate the functions and experiences of Operation and Maintenance (O&M) into project planning and design. Various studies suggested that these concepts have been implemented in isolation of each other and thus preventing optimum result in delivering infrastructure projects. This paper explores the integration of these three concepts in order to maximize the benefits of their implementation. It reviews the literature to identify the main O&M concerns, and assesses their association with constructability principles. This provides a structure to develop an extended constructability model that includes O&M concerns. It is anticipated that an extended constructability model that include O&M considerations can lead to a more efficient and effective delivery of infrastructure projects.
Resumo:
Project selection is a complex decision making process that is not merely influenced by the technical aspects of the project. Selection of road infrastructure projects in the Indonesian public sector is generally conducted at an organisational level, which involves multiple objectives, constraints and stakeholders. Hence, a deeper understanding of the various organisational drivers that impact on such decisions, in particular organisational culture, is much needed for improving decision-making processes as it has been posited by some researchers that organisational culture can become either an enabler, or a barrier, to the process. One part of the cultural assessment undertaken as part of the research, identifies and analyses the cultural types of relevant and involved organisations in the decision making process. The organisational culture assessment instrument (OCAI) of Cameron and Quinn (2011) was utilized in this study and the data was taken from three selected provinces in Indonesia. The results can facilitate the surveyed (and similar) organisations to improve their performance by moving towards a more appropriate cultural typology that is arguably better suited to their operations and to improving their organisational processes to more closely align with their organisational vision, mission and objectives.
Resumo:
The advanced programmatic risk analysis and management model (APRAM) is one of the recently developed methods that can be used for risk analysis and management purposes considering schedule, cost, and quality risks simultaneously. However, this model considers those failure risks that occur only over the design and construction phases of a project’s life cycle. While it can be sufficient for some projects for which the required cost during the operating life is much less than the budget required over the construction period, it should be modified in relation to infrastructure projects because the associated costs during the operating life cycle are significant. In this paper, a modified APRAM is proposed, which can consider potential risks that might occur over the entire life cycle of the project, including technical and managerial failure risks. Therefore, the modified model can be used as an efficient decision-support tool for construction managers in the housing industry in which various alternatives might be technically available. The modified method is demonstrated by using a real building project, and this demonstration shows that it can be employed efficiently by construction managers. The Delphi method was applied in order to figure out the failure events and their associated probabilities. The results show that although the initial cost of a cold-formed steel structural system is higher than a conventional construction system, the former’s failure cost is much lower than the latter’s
Resumo:
This paper reports the findings of an in-depth literature review, which was designed as the first phase of a study that ultimately aims to rank the importance of key governance mechanisms on collaborative construction projects, in terms of impact on value-for-money. The absence of such information in the global knowledge base has prompted the current study. Seminal research completed recently concluded that deductive evidence with regard to the performance outcomes of collaborative procurement mechanisms is currently limited (Eriksson and Westerberg 2011). The authors aim to address this gap in current understanding. The literature review identifies key features of both formal and informal mechanisms which have been applied within collaborative contracting contexts. The literature review lays a solid foundation for designing a deductive research strategy to be implemented in the second phase of the study, which will employ a large-scale quantitative survey to shed light on the governance structures of collaborative contracts, and the ways in which they impact on realisation of VfM during project delivery in the Australian infrastructure industry. The current paper aims to identify the main categories of formal and informal governance mechanisms currently being employed globally. This will provide structure for the development of the survey in the second phase of the study.
Resumo:
Public-private partnerships (PPPs) are increasingly used to procure Australian infrastructure projects. As with all construction projects, the early briefing stages are often the most crucial in determining a successful outcome. There is, however, a lack of systematic research on the type and nature of the critical factors affecting the effectiveness and efficiency of PPP during this period. A literature review is presented of PPP usage in Australia, in which four main categories of factors (procurement, stakeholder, risk, and finance) are identified, each with several subfactors. A questionnaire survey involving state government stakeholders is also described, and a mathematical model that ranks the factors involved is developed. This is followed by an examination of the potential of the factors to help improve the PPP briefing stage for both public and private sectors.
Resumo:
In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.
Resumo:
Increasing scrutiny from the wider community is contributing to a shift towards the delivery and operation of major projects that meets and maintains the sustainability priorities of the community. This is especially significant for large economic projects which have a global track record of social benefit shortfalls, cost overruns, and underestimation of risks. Major industrial and infrastructure projects that cost more than US$1 billion are typically called mega-projects. Globally, investment in mega-projects has exceeded $10 trillion in the last ten years. With so many projects in the pipeline -and many taking place in emerging economies – the effectiveness of the sustainability decision making process is particularly important. The purpose of this paper is to examine how the existing sustainability decision making processes and strategies address the potential challenges facing communities affected by mega-projects. It highlights issues with current operational level approaches to social sustainability assessment at the project level, and argues that to improve accountability and transparency of project outcomes, positive externalities that flow from goods and services provided by the social and cultural systems of the community must be incorporated into decision making.
Resumo:
Existing research and best practice were utilized to develop the Project Management, Stakeholder Engagement and Change Facilitation (PSC) approach to road safety infrastructure projects. Two case studies involving Queensland Transport and Main Roads demonstrated that use of the PSC has potential to create synergies for projects undertaken by multi-disciplinary road safety groups, and to complement Safe System projects and philosophy. The case studies were the North West Road Safety Alliance project, and the implementation of Road Safety Audit policy, and utilised a mix of qualitative and quantitative methods including interviews and surveys.
Resumo:
Queensland University of Technology, together with the Royal Melbourne Institute of Technology, the Alliancing Association of Australia, and the Australian Research Council, have recently commenced a 3 year research project which aims to explore the ways in which value for money can be optimised using collaborative contracting during delivery of Australian infrastructure projects.
Resumo:
The construction industry accounts for a significant portion of the material consumption of our industrialised societies. That material consumption comes at an environmental cost, and when buildings and infrastructure projects are demolished and discarded, after their useful lifespan, that environmental cost remains largely unrecovered. The expected operational lifespan of modern buildings has become disturbingly short as buildings are replaced for reasons of changing cultural expectations, style, serviceability, locational obsolescence and economic viability. The same buildings however are not always physically or structurally obsolete; the materials and components within them are very often still completely serviceable. While there is some activity in the area of recycling of selected construction materials, such as steel and concrete, this is almost always in the form of down cycling or reprocessing. Very little of this material and component resource is reuse in a way that more effectively captures its potential. One significant impediment to such reuse is that buildings are not designed in a way that facilitates easy recovery of materials and components; they are designed and built for speed of construction and quick economic returns, with little or no consideration of the longer term consequences of their physical matter. This research project explores the potential for the recovery of materials and components if buildings were designed for such future recovery; a strategy of design for disassembly. This is not a new design philosophy; design for disassembly is well understood in product design and industrial design. There are also some architectural examples of design for disassembly; however these are specialist examples and there is no significant attempt to implement the strategy in the main stream construction industry. This paper presents research into the analysis of the embodied energy in buildings, highlighting its significance in comparison with operational energy. Analysis at material, component, and whole-of-building levels shows the potential benefits of strategically designing buildings for future disassembly to recover this embodied energy. Careful consideration at the early design stage can result in the deconstruction of significant portions of buildings and the recovery of their potential through higher order reuse and upcycling.
Resumo:
The demand for tunnelling and underground space creation is rapidly growing due to the requirement of civil infrastructure projects and urbanisation. Blasting remains the most inexpensive method of underground excavations in hard rock. Unfortunately, there are no specific safety guidelines available for the blasted tunnels with regards to the threshold limits of vibrations caused by repeated blasting activity in the close proximity. This paper presents the results of a comprehensive study conducted to find out the effect of repeated blast loading on the damage experienced by jointed basaltic rock mass during tunnelling works. Conducting of multiple rounds of blasts for various civil excavations in a railway tunnel imparted repeated loading on rock mass of sidewall and roof of the tunnel. The blast induced damage was assessed by using vibration attenuation equations of charge weight scaling law and measured by borehole extensometers and borehole camera. Ground vibrations of each blasting round were also monitored by triaxial geophones installed near the borehole extensometers. The peak particle velocity (V-max) observations and plastic deformations from borehole extensometers were used to develop a site specific damage model. The study reveals that repeated dynamic loading imparted on the exposed tunnel from subsequent blasts, in the vicinity, resulted in rock mass damage at lesser vibration levels than the critical peak particle velocity (V-cr). It was found that, the repeated blast loading resulted in the near-field damage due to high frequency waves and far-field damage due to low frequency waves. The far field damage, after 45-50 occurrences of blast loading, was up to 55% of the near-field damage in basaltic rock mass. The findings of the study clearly indicate that the phenomena of repeated blasting with respect to number of cycles of loading should be taken into consideration for proper assessment of blast induced damage in underground excavations.