991 resultados para II Republic


Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

For a series of six-coordinate Ru(II)(CO)L or Rh(III)(X–)L porphyrins which are facially differentiated by having a naphthoquinol- or hydroquinol-containing strap across one face, we show that ligand migration from one face to the other can occur under mild conditions, and that ligand site preference is dependent on the nature of L and X–. For bulky nitrogen-based ligands, the strap can be displaced sideways to accommodate the ligand on the same side as the strap. For the ligand pyrazine, we show 1 H NMR evidence for monodentate and bidentate binding modes on both faces, dependent on ligand concentration and metalloporphyrin structure, and that inter-facial migration is rapid under normal conditions. For monodentate substituted pyridine ligands there is a site dependence on structure, and we show clear evidence of dynamic ligand migration through a series of ligand exchange reactions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a road survey as part of a workshop conducted by the Texas Department of Transportation (TxDOT) to evaluate and improve the maintenance practices of the Texas highway system. Directors of maintenance from six peer states (California, Kansas, Georgia, Missouri, North Carolina, and Washington) were invited to this 3-day workshop. One of the important parts of this workshop was a Maintenance Test Section Survey (MTSS) to evaluate a number of pre-selected one-mile roadway sections. The workshop schedule allowed half a day to conduct the field survey and 34 sections were evaluated. Each of the evaluators was given a booklet and asked to rate the selected road sections. The goals of the MTSS were to: 1. Assess the threshold level at which maintenance activities are required as perceived by the evaluators from the peer states; 2. Assess the threshold level at which maintenance activities are required as perceived by evaluators from other TxDOT districts; and 3. Perform a pilot evaluation of the MTSS concept. This paper summarizes the information obtained from survey and discusses the major findings based on a statistical analysis of the data and comments from the survey participants.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: To measure renal adenosine triphosphate (ATP) (bioenergetics) during hypotensive sepsis with or without angiotensin II (Ang II) infusion. Methods: In anaesthetised sheep implanted with a renal artery flow probe and a magnetic resonance coil around one kidney, we induced hypotensive sepsis with intravenous Escherichia coli injection. We measured mean arterial pressure (MAP), heart rate, renal blood flow RBF and renal ATP levels using magnetic resonance spectroscopy. After 2 h of sepsis, we randomly assigned sheep to receive an infusion of Ang II or vehicle intravenously and studied the effect of treatment on the same variables. Results: After E. coli administration, the experimental animals developed hypotensive sepsis (MAP from 92 ± 9 at baseline to 58 ± 4 mmHg at 4 h). Initially, RBF increased, then, after 4 h, it decreased below control levels (from 175 ± 28 at baseline to 138 ± 27 mL/min). Despite decreased RBF and hypotension, renal ATP was unchanged (total ATP to inorganic phosphate ratio from 0.69 ± 0.02 to 0.70 ± 0.02). Ang II infusion restored MAP but caused significant renal vasoconstriction. However, it induced no changes in renal ATP (total ATP to inorganic phosphate ratio from 0.79 ± 0.03 to 0.80 ± 0.02). Conclusions:During early hypotensive experimental Gram-negative sepsis, there was no evidence of renal bioenergetic failure despite decreased RBF. In this setting, the addition of a powerful renal vasoconstrictor does not lead to deterioration in renal bioenergetics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-builders play a vital role in the success of DB projects. In the construction market of the People’s Republic of China, most of the design-builders, however, lack adequate competences to conduct the DB projects successfully. The objective of this study is, therefore, to identify the key competences that design-builders should possess to not only ensure the success of DB projects but also acquire the competitive advantages in the DB market. Five semi-structured face-to-face interviews and two rounds of Delphi questionnaire survey were conducted to identify the key competences of design-builders. Rankings have been assigned to these key competences on the basis of their relative importance. Six ranked key competences of design-builders have been identified, which are, namely, (1) experience with similar DB projects; (2) capability of corporate management; (3) combination of building techniques and design expertise; (4) financial capability for DB projects; (5) enterprise qualification and scale; and (6) credit records and reputation in the industry. The design-builders can make use of the research findings as guidelines to improve their DB competence. These research findings will also be useful to clients during the selection of design-builders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-build (DB) system has been demonstrated as an effective delivery method and been widely used overseas. However it does not receive the same popularity in the People’s Republic of China (PRC). This paper first conducts a literature review on advantages and disadvantages of DB in general; then it gives an overview of the PRC construction industry. There are ample evidences that the DB system will theoretically bring benefits to the PRC construction industry. After a thorough investigation of the current DB market, it can be concluded that the development of the DB system is still at its infancy stage. The barriers to entry have been finally identified, which relate to the legal restraints, negative owner attitude, and high requirement of DB projects. These barriers constitute obstacles to the development of DB system in the PRC. However, with rapid growth of construction industry, new requirements in modern construction projects, and strong promotion from governments, it is believed that the domestic DB market will have great potential in the near future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-Build (DB) system has been widely adopted overseas but it has not received the same popularity yet in the People’s Republic of China. The selection of design-build variant is regarded as one of the critical obstacles to the application of this alternative. This paper investigates categories of design-build variants in the construction market of China. The develop-and-construction, enhanced design-build, traditional-design-build and engineering procurement-construction (EPC) are the four current designbuild variants adopted by clients. Each of them is developed to meet a varying set of circumstances and has its own advantages and disadvantages. The develop-and-construction is mostly used in large, complex projects in housing industry and it will guarantee client’s great control over the project while still leave some design room for the contractor. The traditional-design-build and enhanced-design-build systems are mostly applied in projects that are comparatively simple, small-scale, and the DB contractors will have greater control of the projects. The EPC is the extension of pure design-build method and is widely adopted in the petrochemical, metallurgical and electronic fields because of the high-technique requirements and the necessity for one entity to control the design, construction, procurement and commissioning etc. Four corresponding design-build projects are also presented in this paper in order to better illustrate the operational process and provide the insight for understanding the design-build variants in Mainland China.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Although the design-build (DB) system has been demonstrated to be an effective delivery method and has gained popularity worldwide, it has not gained the same popularity in the construction market of China. The objective of this study was, theretofore, to investigate the barriers to entry in the DB market. A total of 22 entry barriers were first identified through an open-ended questionnaire survey with 15 top construction professionals in the construction market of China. A broad questionnaire survey was further conducted to prioritize these entry barriers. Statistical analysis of responses shows that the most dominant barriers to entry into the DB market are, namely, lack of design expertise, lack of interest from owners, lack of suitable organization structure, lack of DB specialists, and lack of credit record system. Analysis of variance indicates that there is no difference of opinions among the respondent groups of academia, government departments, state-owned company, and private company, at the 5% significance level, on most of the barriers to entry. Finally, the underlying dimensions of barriers to entry in the DB market were investigated through factor analysis. The results indicate that there are six major underlying dimensions of entry barriers in DB market, which include, namely, the competence of design-builders, difficulty in project procurement, characteristics of DB projects, lack of support from public sectors, the competence of DB owners, and the immaturity of DB market. These findings are useful for both potential and incumbent design-builders to understand and analyze the DB market in China.