977 resultados para Historical method
Resumo:
The dynamic interaction between building systems and external climate is extremely complex, involving a large number of difficult-to-predict variables. In order to study the impact of global warming on the built environment, the use of building simulation techniques together with forecast weather data are often necessary. Since all building simulation programs require hourly meteorological input data for their thermal comfort and energy evaluation, the provision of suitable weather data becomes critical. Based on a review of the existing weather data generation models, this paper presents an effective method to generate approximate future hourly weather data suitable for the study of the impact of global warming. Depending on the level of information available for the prediction of future weather condition, it is shown that either the method of retaining to current level, constant offset method or diurnal modelling method may be used to generate the future hourly variation of an individual weather parameter. An example of the application of this method to the different global warming scenarios in Australia is presented. Since there is no reliable projection of possible change in air humidity, solar radiation or wind characters, as a first approximation, these parameters have been assumed to remain at the current level. A sensitivity test of their impact on the building energy performance shows that there is generally a good linear relationship between building cooling load and the changes of weather variables of solar radiation, relative humidity or wind speed.
Resumo:
For certain continuum problems, it is desirable and beneficial to combine two different methods together in order to exploit their advantages while evading their disadvantages. In this paper, a bridging transition algorithm is developed for the combination of the meshfree method (MM) with the finite element method (FEM). In this coupled method, the meshfree method is used in the sub-domain where the MM is required to obtain high accuracy, and the finite element method is employed in other sub-domains where FEM is required to improve the computational efficiency. The MM domain and the FEM domain are connected by a transition (bridging) region. A modified variational formulation and the Lagrange multiplier method are used to ensure the compatibility of displacements and their gradients. To improve the computational efficiency and reduce the meshing cost in the transition region, regularly distributed transition particles, which are independent of either the meshfree nodes or the FE nodes, can be inserted into the transition region. The newly developed coupled method is applied to the stress analysis of 2D solids and structures in order to investigate its’ performance and study parameters. Numerical results show that the present coupled method is convergent, accurate and stable. The coupled method has a promising potential for practical applications, because it can take advantages of both the meshfree method and FEM when overcome their shortcomings.
Resumo:
In this article I outline and demonstrate a synthesis of the methods developed by Lemke (1998) and Martin (2000) for analyzing evaluations in English. I demonstrate the synthesis using examples from a 1.3-million-word technology policy corpus drawn from institutions at the local, state, national, and supranational levels. Lemke's (1998) critical model is organized around the broad 'evaluative dimensions' that are deployed to evaluate propositions and proposals in English. Martin's (2000) model is organized with a more overtly systemic-functional orientation around the concept of 'encoded feeling'. In applying both these models at different times, whilst recognizing their individual usefulness and complementarity, I found specific limitations that led me to work towards a synthesis of the two approaches. I also argue for the need to consider genre, media, and institutional aspects more explicitly when claiming intertextual and heteroglossic relations as the basis for inferred evaluations. A basic assertion made in this article is that the perceived Desirability of a process, person, circumstance, or thing is identical to its 'value'. But the Desirability of anything is a socially and thus historically conditioned attribution that requires significant amounts of institutional inculcation of other 'types' of value-appropriateness, importance, beauty, power, and so on. I therefore propose a method informed by critical discourse analysis (CDA) that sees evaluation as happening on at least four interdependent levels of abstraction.
Resumo:
Troubled dynamics between residents of an Aboriginal town in Queensland and the local health system were established during colonisation and consolidated during those periods of Australian history where the policies of 'protection' (segregation), integration and then assimilation held sway. The status of Aboriginal health is, in part, related to interactions between the residents' current and historical experiences of the health and criminal justice systems as together these agencies used medical and moral policing to legitimate dispossession, marginalisation, institutionalisation and control of the residents. The punitive regulations and ethnocentric strategies used by these institutions are within the living memory of many of the residents or in the published accounts of preceding generations. This paper explores current residents' memories and experiences.
Resumo:
The determination of the most appropriate procurement method for capital works projects is a challenging task for the Department of Housing and Works (DHW) and other Western Australian State Government Agencies because of the array of assessment criteria that are considered and the procurement methods that are available. A number of different procurement systems can be used to deliver capital works projects such a traditional, design and construct and management. Sub-classifications of these systems have proliferated and continue to emerge in response to market demands. The selection of an inappropriate procurement method may lead to undesirable project outcomes. To facilitate DHW in selecting an appropriate procurement method for its capital works projects, a six step procurement method selection process is presented. The characteristics of the most common forms of procurement method used in Australia are presented. Case studies where procurement methods have been used for specific types of capital works in Western Australia are offered to provide a reference point and learning opportunity for procurement method selection.
Resumo:
For a sustainable building industry, not only should the environmental and economic indicators be evaluated but also the societal indicators for building. Current indicators can be in conflict with each other, thus decision making is difficult to clearly quantify and assess sustainability. For the sustainable building, the objectives of decreasing both adverse environmental impact and cost are in conflict. In addition, even though both objectives may be satisfied, building management systems may present other problems such as convenience of occupants, flexibility of building, or technical maintenance, which are difficult to quantify as exact assessment data. These conflicting problems confronting building managers or planners render building management more difficult. This paper presents a methodology to evaluate a sustainable building considering socio-economic and environmental characteristics of buildings, and is intended to assist the decision making for building planners or practitioners. The suggested methodology employs three main concepts: linguistic variables, fuzzy numbers, and an analytic hierarchy process. The linguistic variables are used to represent the degree of appropriateness of qualitative indicators, which are vague or uncertain. These linguistic variables are then translated into fuzzy numbers to reflect their uncertainties and aggregated into the final fuzzy decision value using a hierarchical structure. Through a case study, the suggested methodology is applied to the evaluation of a building. The result demonstrates that the suggested approach can be a useful tool for evaluating a building for sustainability.
Resumo:
Improving the performance of a incident detection system was essential to minimize the effect of incidents. A new method of incident detection was brought forward in this paper based on an in-car terminal which consisted of GPS module, GSM module and control module as well as some optional parts such as airbag sensors, mobile phone positioning system (MPPS) module, etc. When a driver or vehicle discovered the freeway incident and initiated an alarm report the incident location information located by GPS, MPPS or both would be automatically send to a transport management center (TMC), then the TMC would confirm the accident with a closed-circuit television (CCTV) or other approaches. In this method, detection rate (DR), time to detect (TTD) and false alarm rate (FAR) were more important performance targets. Finally, some feasible means such as management mode, education mode and suitable accident confirming approaches had been put forward to improve these targets.