1000 resultados para Gully process
Resumo:
Business Process Management (BPM) has emerged as a popular management approach in both Information Technology (IT) and management practice. While there has been much research on business process modelling and the BPM life cycle, there has been little attention given to managing the quality of a business process during its life cycle. This study addresses this gap by providing a framework for organisations to manage the quality of business processes during different phases of the BPM life cycle. This study employs a multi-method research design which is based on the design science approach and the action research methodology. During the design science phase, the artifacts to model a quality-aware business process were developed. These artifacts were then evaluated through three cycles of action research which were conducted within three large Australian-based organisations. This study contributes to the body of BPM knowledge in a number of ways. Firstly, it presents a quality-aware BPM life cycle that provides a framework on how quality can be incorporated into a business process and subsequently managed during the BPM life cycle. Secondly, it provides a framework to capture and model quality requirements of a business process as a set of measurable elements that can be incorporated into the business process model. Finally, it proposes a novel root cause analysis technique for determining the causes of quality issues within business processes.
Resumo:
To meet new challenges of Enterprise Systems that essentially go beyond the initial implementation, contemporary organizations seek employees with business process experts with software skills. Despite a healthy demand from the industry for such expertise, recent studies reveal that most Information Systems (IS) graduates are ill-equipped to meet the challenges of modern organizations. This paper shares insights and experiences from a course that is designed to provide a business process centric view of a market leading Enterprise System. The course, designed for both undergraduate and graduate students, uses two common business processes in a case study that employs both sequential and explorative exercises. Student feedback gained through two longitudinal surveys across two phases of the course demonstrates promising signs of the teaching approach.
Resumo:
This paper proposes a method which aims at increasing the efficiency of enterprise system implementations. First, we argue that existing process modeling languages that feature different degrees of abstraction for different user groups exist and are used for different purposes which makes it necessary to integrate them. We describe how to do this using the meta models of the involved languages. Second, we argue that an integrated process model based on the integrated meta model needs to be configurable and elaborate on the enabling mechanisms. We introduce a business example using SAP modeling techniques to illustrate the proposed method.
Resumo:
Mainstream business process modelling techniques promote a design paradigm wherein the activities to be performed within a case, together with their usual execution order, form the backbone of a process model, on top of which other aspects are anchored. This paradigm, while eective in standardised and production-oriented domains, shows some limitations when confronted with processes where case-by-case variations and exceptions are the norm. In this thesis we develop the idea that the eective design of exible process models calls for an alternative modelling paradigm, one in which process models are modularised along key business objects, rather than along activity decompositions. The research follows a design science method, starting from the formulation of a research problem expressed in terms of requirements, and culminating in a set of artifacts that have been devised to satisfy these requirements. The main contributions of the thesis are: (i) a meta-model for object-centric process modelling incorporating constructs for capturing exible processes; (ii) a transformation from this meta-model to an existing activity-centric process modelling language, namely YAWL, showing the relation between object-centric and activity-centric process modelling approaches; and (iii) a Coloured Petri Net that captures the semantics of the proposed meta-model. The meta-model has been evaluated using a framework consisting of a set of work ow patterns. Moreover, the meta-model has been embodied in a modelling tool that has been used to capture two industrial scenarios.
Resumo:
Determining sensitivity and specificity of a postoperative infection surveillance process is a difficult undertaking. Because postoperative infections are rare, vast numbers of negative results exist, and it is often not reasonable to assess them all. This study gives a methodological framework for estimating sensitivity and specificity by taking only a small sample of the number of patients who test negative and comparing their findings to the reference or “gold standard” rather than comparing the findings of all patients to the gold standard. It provides a formula for deriving confidence intervals for these estimates and a guide to minimum requirements for sampling results.
Resumo:
Quality has been an important factor for shopping centers in competitive conditions. However, quality measurement has no standard. In Surabaya, only two regional shopping centers will be measured in this research. The objective is assessing quality of shopping centers building using Analytical Hierarchy Process (AHP) method and calculating the Building Quality Index. An overall ranking of Hierarchy priorities of quality criteria founded as a result from AHP analysis. Access and Circulation became the highest priority in affecting quality of shopping centers building according to respondents’ perception of quality. Weightened value as a result from comparison between two shopping centers as follows: Tunjungan Plaza get 0,732 point and Surabaya Plaza get 0,268 point. The first shopping center got higher weight than the second shopping center. The BQI for Tunjungan Plaza is 66% and for Surabaya Plaza is 64%.
Resumo:
Games and related virtual environments have been a much-hyped area of the entertainment industry. The classic quote is that games are now approaching the size of Hollywood box office sales [1]. Books are now appearing that talk up the influence of games on business [2], and it is one of the key drivers of present hardware development. Some of this 3D technology is now embedded right down at the operating system level via the Windows Presentation Foundations – hit Windows/Tab on your Vista box to find out... In addition to this continued growth in the area of games, there are a number of factors that impact its development in the business community. Firstly, the average age of gamers is approaching the mid thirties. Therefore, a number of people who are in management positions in large enterprises are experienced in using 3D entertainment environments. Secondly, due to the pressure of demand for more computational power in both CPU and Graphical Processing Units (GPUs), your average desktop, any decent laptop, can run a game or virtual environment. In fact, the demonstrations at the end of this paper were developed at the Queensland University of Technology (QUT) on a standard Software Operating Environment, with an Intel Dual Core CPU and basic Intel graphics option. What this means is that the potential exists for the easy uptake of such technology due to 1. a broad range of workers being regularly exposed to 3D virtual environment software via games; 2. present desktop computing power now strong enough to potentially roll out a virtual environment solution across an entire enterprise. We believe such visual simulation environments can have a great impact in the area of business process modeling. Accordingly, in this article we will outline the communication capabilities of such environments, giving fantastic possibilities for business process modeling applications, where enterprises need to create, manage, and improve their business processes, and then communicate their processes to stakeholders, both process and non-process cognizant. The article then concludes with a demonstration of the work we are doing in this area at QUT.
Resumo:
Despite more than three decades of research, there is a limited understanding of the transactional processes of appraisal, stress and coping. This has led to calls for more focused research on the entire process that underlies these variables. To date, there remains a paucity of such research. The present study examined Lazarus and Folkman’s (1984) transactional model of stress and coping. One hundred and twenty nine Australian participants with full time employment (i.e. nurses and administration employees) were recruited. There were 49 male (age mean = 34, SD = 10.51) and 80 female (age mean = 36, SD = 10.31) participants. The analysis of three path models indicated that in addition to the original paths, which were found in Lazarus and Folkman’s transactional model (primary appraisal-->secondary appraisal-->stress-->coping), there were also direct links between primary appraisal and stress level time one and between stress level time one to stress level time two. This study has provided additional insights into the transactional process which will extend our understanding of how individuals appraise, cope and experience occupational stress.