924 resultados para Graph operations
Resumo:
Audit report on the Honey Creek Resort Operations Account maintained by Central Group Management, LLC for the year ended June 30, 2013
Resumo:
One of the more severe winter hazards is ice or compacted snow on roadways. While three methods are typically used to combat ice (salting, sanding and scraping), relatively little effort has been applied to improve methods of scraping ice from roads. In this project, a new test facility has been developed, comprising a truck with an underbody blade, which has been instrumented such that the forces to scrape ice from a pavement can be measured. A test site has been used, which is not accessible to the public, and ice covers have been sprayed onto the pavement and subsequently scraped from it, while the scraping loads have been recorded. Three different cutting edges have been tested for their ice scraping efficiency. Two of the blades are standard (one with a carbide insert, the other without) while the third blade was designed under the SHRP H-204A project. Results from the tests allowed two parameters to be identified. The first is the scraping efficiency which is the ratio of vertical to horizontal force. The lower this ratio, the more efficiently ice is being removed. The second parameter is the scraping effectiveness, which is related (in some as yet unspecified manner) to the horizontal load. The higher the horizontal load, the more ice is being scraped. The ideal case is thus to have as high a horizontal load as possible, combined with the lowest possible vertical load. Results indicate that the SHRP blade removed ice more effectively than the other two blades under equivalent conditions, and furthermore, did so with greater efficiency and thus more control. Furthermore, blade angles close to 0 deg provide for the most efficient scraping for all three blades. The study has shown that field testing of plow blades is possible in controlled situations, and that blades can be evaluated using this system. The system is available for further tests as are deemed appropriate.
Resumo:
OBJECTIVE: We sought to study the epidemiologic and medical aspects of alpine helicopter rescue operations involving the winching of an emergency physician to the victim. METHODS: We retrospectively reviewed the medical and operational reports of a single helicopter-based emergency medical service. Data from 1 January 2003 to 31 December 2008 were analysed. RESULTS: A total of 921 patients were identified, with a male:female ratio of 2:1. There were 56 (6%) patients aged 15 or under. The median time from emergency call to helicopter take-off was 7 min (IQR = 5-10 min). 840 (91%) patients suffered from trauma-related injuries, with falls from heights during sports activities the most frequent event. The most common injuries involved the legs (246 or 27%), head (175 or 19%), upper limbs (117 or 13%), spine (108 or 12%), and femur (66 or 7%). Only 81 (9%) victims suffered from a medical emergency, but these cases were, when compared to the trauma victims, significantly more severe according to the NACA index (p<0.001). Overall, 246 (27%) patients had a severe injury or illness, namely, a potential or overt vital threat (NACA score between 4 and 6). A total of 478 (52%) patients required administration of major analgesics: fentanyl (443 patients or 48%), ketamine (42 patients or 5%) or morphine (7 patients or 1%). The mean dose of fentanyl was 188 micrograms (range 25-750, SD 127). Major medical interventions such as administration of vasoactive drugs, intravenous perfusions of more than 1000 ml of fluids, ventilation or intubation were performed on 39 (4%) patients. CONCLUSIONS: The severity of the patients' injuries or illnesses along with the high proportion of medical procedures performed directly on-site validates emergency physician winching for advanced life support procedures and analgesia.
Resumo:
Report on a review of the operations of certain departments of the University of Iowa Hospitals and Clinics for the period July 1, 2010 through December 31, 2012
Resumo:
"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 2 - Construction and Maintenance Operations and Reporting. This module provides hands on examples of applications of metric measurements in the construction and maintenance field operations.
Resumo:
This report discusses the asphalt pavement recycling project designated Project HR-188 in Kossuth County, Iowa. Specific objectives were: (a) to determine the effectiveness of drum mixing plant modifications designed to control air pollution within limits specified by the Iowa Department of Environmental Quality; (b) to assess the impact of varying the proportions of recycled and virgin aggregates, (c) to assess the impact of varying the production rate of the plant, and (d) to assess the impact of varying the mixing temperature. The discussion includes information on the proposed use of research funds, project location and description, the project planning conference, plan development, bid letting, asphalt plant configuration, actual plant operation, why this method is successful, probable process limitations, pollution results, recycled pavement test results, and the cost of virgin vs. recycled asphalt pavements.
Resumo:
A cluster of six pediatric cases of deep-seated Staphylococcus aureus infection after heart operations prompted us to perform molecular typing of the S. aureus isolates by pulsed-field gel electrophoresis. This revealed the presence of genotypically distinct isolates in four of the six patients. Isolates of two patients were genotypically identical. All patients carried S. aureus in the anterior nares. In each patient, the banding pattern of deoxyribonucleic acid in these isolates was indistinguishable from that in strains isolated from blood or wound cultures. Molecular typing with pulsed-field gel electrophoresis ruled out nosocomial transmission of S. aureus between four patients; at the same time, it provided evidence for an association between nasal colonization and postoperative wound infection. Epidemiologic investigation of potential links between two patients with identical isolates did not provide any evidence for nosocomial transmission of S. aureus between these patients. Because nasal colonization with S. aureus may be a risk factor for surgical wound infection in pediatric patients undergoing heart operations, preoperative decolonization appears to be warranted.
Resumo:
Report on a special investigation of the University of Iowa Athletic Ticket Office and the operations of the Hawkeye Express for the period September 1, 2005 through November 30, 2013
Resumo:
Winter weather in Iowa is often unpredictable and can have an adverse impact on traffic flow. The Iowa Department of Transportation (Iowa DOT) attempts to lessen the impact of winter weather events on traffic speeds with various proactive maintenance operations. In order to assess the performance of these maintenance operations, it would be beneficial to develop a model for expected speed reduction based on weather variables and normal maintenance schedules. Such a model would allow the Iowa DOT to identify situations in which speed reductions were much greater than or less than would be expected for a given set of storm conditions, and make modifications to improve efficiency and effectiveness. The objective of this work was to predict speed changes relative to baseline speed under normal conditions, based on nominal maintenance schedules and winter weather covariates (snow type, temperature, and wind speed), as measured by roadside weather stations. This allows for an assessment of the impact of winter weather covariates on traffic speed changes, and estimation of the effect of regular maintenance passes. The researchers chose events from Adair County, Iowa and fit a linear model incorporating the covariates mentioned previously. A Bayesian analysis was conducted to estimate the values of the parameters of this model. Specifically, the analysis produces a distribution for the parameter value that represents the impact of maintenance on traffic speeds. The effect of maintenance is not a constant, but rather a value that the researchers have some uncertainty about and this distribution represents what they know about the effects of maintenance. Similarly, examinations of the distributions for the effects of winter weather covariates are possible. Plots of observed and expected traffic speed changes allow a visual assessment of the model fit. Future work involves expanding this model to incorporate many events at multiple locations. This would allow for assessment of the impact of winter weather maintenance across various situations, and eventually identify locations and times in which maintenance could be improved.
Resumo:
Schizophrenia is postulated to be the prototypical dysconnection disorder, in which hallucinations are the core symptom. Due to high heterogeneity in methodology across studies and the clinical phenotype, it remains unclear whether the structural brain dysconnection is global or focal and if clinical symptoms result from this dysconnection. In the present work, we attempt to clarify this issue by studying a population considered as a homogeneous genetic sub-type of schizophrenia, namely the 22q11.2 deletion syndrome (22q11.2DS). Cerebral MRIs were acquired for 46 patients and 48 age and gender matched controls (aged 6-26, respectively mean age = 15.20 ± 4.53 and 15.28 ± 4.35 years old). Using the Connectome mapper pipeline (connectomics.org) that combines structural and diffusion MRI, we created a whole brain network for each individual. Graph theory was used to quantify the global and local properties of the brain network organization for each participant. A global degree loss of 6% was found in patients' networks along with an increased Characteristic Path Length. After identifying and comparing hubs, a significant loss of degree in patients' hubs was found in 58% of the hubs. Based on Allen's brain network model for hallucinations, we explored the association between local efficiency and symptom severity. Negative correlations were found in the Broca's area (p < 0.004), the Wernicke area (p < 0.023) and a positive correlation was found in the dorsolateral prefrontal cortex (DLPFC) (p < 0.014). In line with the dysconnection findings in schizophrenia, our results provide preliminary evidence for a targeted alteration in the brain network hubs' organization in individuals with a genetic risk for schizophrenia. The study of specific disorganization in language, speech and thought regulation networks sharing similar network properties may help to understand their role in the hallucination mechanism.
Resumo:
Audit report of the Honey Creek Resort Operations Account managed by Central Group Management, LLC (Honey Creek Resort) as of and for the year ended June 30, 2014
Resumo:
Audit report on the Honey Creek Resort Operations Account maintained by Central Group Management, LLC for the year ended June 30, 2014
Resumo:
Capacity is affected by construction type and its intensity on adjacent open traffic lanes. The effect on capacity is a function of vehicles moving in and out of the closed lanes of the work zone, and the presence of heavy construction vehicles. Construction activity and its intensity, however, are not commonly considered in estimating capacity of a highway lane. The main purpose of this project was to attempt to quantify the effects of construction type and intensity (e.g. maintenance, rehabilitation, reconstruction, and milling) on work zone capacity. The objective of this project is to quantify the effects of construction type and its intensity on work zone capacity and to develop guidelines for MoDOT to estimate the specific operation type and intensity that will improve the traffic flow by reducing the traffic flow and queue length commonly associated with work zones. Despite the effort put into field data collection, the data collected did not show a full speed-flow chart therefore extracting a reliable capacity value was difficult. A statistical comparison between the capacity values found in this study using either methodologies indicates that there is an effect of construction activity on the values work zone capacity. It was found that the heavy construction activity reduces the capacity. It is very beneficial to conduct similar studies on the capacity of work zone with different lane closure barriers, which is also directly related to the type of work zone being short-term or long-term work zones. Also, the effect of different geometric and environmental characteristics of the roadway should be considered in future studies.