938 resultados para Electric equipment
Resumo:
In this paper we present a Constraint Logic Programming (CLP) based model, and hybrid solving method for the Scheduling of Maintenance Activities in the Power Transmission Network. The model distinguishes from others not only because of its completeness but also by the way it models and solves the Electric Constraints. Specifically we present a efficient filtering algorithm for the Electrical Constraints. Furthermore, the solving method improves the pure CLP methods efficiency by integrating a type of Local Search technique with CLP. To test the approach we compare the method results with another method using a 24 bus network, which considerers 42 tasks and 24 maintenance periods.
Resumo:
This paper presents a simulator for electric vehicles in the context of smart grids and distribution networks. It aims to support network operator´s planning and operations but can be used by other entities for related studies. The paper describes the parameters supported by the current version of the Electric Vehicle Scenario Simulator (EVeSSi) tool and its current algorithm. EVeSSi enables the definition of electric vehicles scenarios on distribution networks using a built-in movement engine. The scenarios created with EVeSSi can be used by external tools (e.g., power flow) for specific analysis, for instance grid impacts. Two scenarios are briefly presented for illustration of the simulator capabilities.
Resumo:
Electrical activity is extremely broad and distinct, requiring by one hand, a deep knowledge on rules, regulations, materials, equipments, technical solutions and technologies and assistance in several areas, as electrical equipment, telecommunications, security and efficiency and rational use of energy, on the other hand, also requires other skills, depending on the specific projects to be implemented, being this knowledge a characteristic that belongs to the professionals with relevant experience, in terms of complexity and specific projects that were made.
Resumo:
A mobilidade é considerada um dos factores chave na sustentabilidade e desenvolvimento de qualquer economia. Em Portugal essa realidade não é diferente. Em 2011 verifica-se que 41% do consumo global de combustíveis pertence ao sector rodoviário [1] o que evidencia a sua relevância na economia do país. No que concerne aos veículos de tracção eléctrica, começaram a surgir nos finais do séc. XIX, e no início do séc. XX nos Estados Unidos da América representavam 38% dos veículos [2]. Diversos factores económicos e tecnológicos conduziram a um crescente desinteresse por parte da indústria em investir na produção deste tipo de veículos. Contudo com a introdução de baterias de iões de lítio em veículos de tracção eléctrica, torna-os viáveis e competitivos. Neste trabalho é proposto o desenvolvimento de um sistema de gestão de baterias de iões de lítio do tipo LiFePO4 para aplicação em veículos eléctricos. O sistema deverá assegurar a protecção das baterias e indicar o estado de carga das mesmas. Este sistema permitirá uma optimização no uso deste género de baterias, proporcionará uma melhor utilização, aumentando a sua vida útil. O sistema irá ser aplicado e testado experimentalmente no veículo eléctrico ecológico (Veeco). No âmbito do projecto Veeco foi projectado e construído um banco de ensaios utilizado na análise do comportamento das baterias, e determinar quais os requisitos necessários para o sistema de gestão desenvolvido. Foi também projectado e realizado um sistema de aquisição e processamento de dados que permite obter informações acerca da bateria, dados que estarão disponíveis no interface Homem-máquina do Veeco.
Resumo:
Electric vehicles (EV) offer a great potential to address the integration of renewable energy sources (RES) in the power grid, and thus reduce the dependence on oil as well as the greenhouse gases (GHG) emissions. The high share of wind energy in the Portuguese energy mix expected for 2020 can led to eventual curtailment, especially during the winter when high levels of hydro generation occur. In this paper a methodology based on a unit commitment and economic dispatch is implemented, and a hydro-thermal dispatch is performed in order to evaluate the impact of the EVs integration into the grid. Results show that the considered 10 % penetration of EVs in the Portuguese fleet would increase load in 3 % and would not integrate a significant amount of wind energy because curtailment is already reduced in the absence of EVs. According to the results, the EV is charged mostly with thermal generation and the associated emissions are much higher than if they were calculated based on the generation mix.
Resumo:
Mestrado em Engenharia Química
Resumo:
Os objectivos principais deste estudo são a caracterização de uma das linhas de extrusão existentes na Cabelte, nomeadamente a linha de extrusão de referência EP5, composta por duas extrusoras. Pretende-se fazer a determinação de indicadores energéticos e de processo e a optimização do consumo energético, no que diz respeito à energia consumida e às perdas térmicas relativas a esta linha. Para fazer a monitorização da linha de extrusão EP5 foi colocado no quadro geral dessa linha um equipamento central de medida de forma a ser possível a sua monitorização. No entanto, para a extrusora auxiliar as medições foram efectuadas com uma pinça amperimétrica e um fasímetro. Foram também efectuados ensaios onde foi avaliada a quantidade de material transformada, para isso foi utilizado um equipamento de pesagem, doseador gravimétrico aplicado nas extrusoras. As medições de temperatura para os cálculos das perdas térmicas da extrusora principal e para a caracterização dos materiais plásticos, foram efectuadas utilizando um termómetro digital. Foram efectuados ensaios de débito às extrusoras auxiliar e principal e foi estudada a variação do factor de potência em função da rotação do fuso. Na perspectiva do utilizador final a optimização para a utilização racional de energia está na redução de encargos da factura de energia eléctrica. Essa factura não depende só da quantidade mas também do modo temporal como se utiliza essa energia, principalmente a energia eléctrica, bastante dependente do período em que é consumida. Uma metodologia diferente no planeamento da produção, contemplando o fabrico dos cabos com maior custo específico nas horas de menor custo energético, implicaria uma redução dos custos específicos de 18,7% para o horário de verão e de 20,4% para o horário de inverno. Os materiais de revestimento utilizados (PE e PVC), influenciam directamente os custos energéticos, uma vez que o polietileno (PE) apresenta sempre valores de entalpia superiores (0,317 kWh/kg e 0,281 kWh/kg)) e necessita de temperaturas de trabalho mais elevadas do que o policloreto de vinilo (PVC) (0,141 kWh/kg e 0,124 kWh/kg). O consumo específico tendencialmente diminui à medida que aumenta a rotação do fuso, até se atingir o valor de rotação óptimo, a partir do qual esta tendência se inverte. O cosφ para as duas extrusoras em estudo, aumenta sempre com o aumento de rotação do fuso. Este estudo permitiu avaliar as condições óptimas no processo de revestimento dos cabos, de forma a minimizarmos os consumos energéticos. A redução de toda a espécie de desperdícios (sobre consumos, desperdício em purgas) é uma prioridade de gestão que alia também a eficácia à eficiência, e constitui uma ferramenta fundamental para assegurar o futuro da empresa. O valor médio lido para o factor de potência (0,38) da linha EP5, valor extremamente baixo e que vem associado à energia reactiva, além do factor económico que lhe está inerente, condiciona futuras ampliações. A forma de se corrigir o factor de potência é instalando uma bateria de condensadores de 500 kVAr. Considerando o novo sistema tarifário aplicado à energia reactiva, vamos ter um ganho de 36167,4 Euro/ano e o período de retorno de investimento é de 0,37 ano (4,5 meses). Esta medida implica também uma redução anual na quantidade de CO2 emitida de 6,5%. A quantificação das perdas térmicas é importante, pois só desta forma se podem definir modos de actuação de forma a aumentar a eficiência energética. Se não existir conhecimento profundo dos processos e metodologias correctas, não podem existir soluções eficientes, logo é importante medir antes de avançar com qualquer medida de gestão.
Resumo:
Na actualidade, quando se procura a diversificação energética, em especial de fontes renováveis, a gasificação surge como uma forma promissora de aproveitamento da biomassa, nomeadamente dos resíduos florestais, para a geração de energia eléctrica. Neste contexto, passou-se em revista as diversas formas de gasificação, a sua evolução histórica e os diversos tipos de reactores com as suas vantagens e desvantagens. De igual forma, foram analisadas as disponibilidades e características da biomassa no mundo e em Portugal, destacando-se as suas potencialidades e as dificuldades no seu aproveitamento. Fez-se o dimensionamento de um reactor-gasificador de leito fluidizado borbulhante à escala piloto, bem como dos equipamentos complementares, sistema de alimentação, ventilador, ciclone, filtro para o gás produzido e gerador eléctrico. As dimensões dum reactor para trabalhos laboratoriais foram determinadas por cálculo das condições hidrodinâmicas, que, também, permitiram calcular o caudal de ar a utilizar. Por balanços materiais, considerando-se uma composição experimental do gás de síntese citada na literatura, determinou-se uma possível composição da alimentação e um caudal de alimentação.
Resumo:
The introduction of electricity markets and integration of Distributed Generation (DG) have been influencing the power system’s structure change. Recently, the smart grid concept has been introduced, to guarantee a more efficient operation of the power system using the advantages of this new paradigm. Basically, a smart grid is a structure that integrates different players, considering constant communication between them to improve power system operation and management. One of the players revealing a big importance in this context is the Virtual Power Player (VPP). In the transportation sector the Electric Vehicle (EV) is arising as an alternative to conventional vehicles propel by fossil fuels. The power system can benefit from this massive introduction of EVs, taking advantage on EVs’ ability to connect to the electric network to charge, and on the future expectation of EVs ability to discharge to the network using the Vehicle-to-Grid (V2G) capacity. This thesis proposes alternative strategies to control these two EV modes with the objective of enhancing the management of the power system. Moreover, power system must ensure the trips of EVs that will be connected to the electric network. The EV user specifies a certain amount of energy that will be necessary to charge, in order to ensure the distance to travel. The introduction of EVs in the power system turns the Energy Resource Management (ERM) under a smart grid environment, into a complex problem that can take several minutes or hours to reach the optimal solution. Adequate optimization techniques are required to accommodate this kind of complexity while solving the ERM problem in a reasonable execution time. This thesis presents a tool that solves the ERM considering the intensive use of EVs in the smart grid context. The objective is to obtain the minimum cost of ERM considering: the operation cost of DG, the cost of the energy acquired to external suppliers, the EV users payments and remuneration and penalty costs. This tool is directed to VPPs that manage specific network areas, where a high penetration level of EVs is expected to be connected in these areas. The ERM is solved using two methodologies: the adaptation of a deterministic technique proposed in a previous work, and the adaptation of the Simulated Annealing (SA) technique. With the purpose of improving the SA performance for this case, three heuristics are additionally proposed, taking advantage on the particularities and specificities of an ERM with these characteristics. A set of case studies are presented in this thesis, considering a 32 bus distribution network and up to 3000 EVs. The first case study solves the scheduling without considering EVs, to be used as a reference case for comparisons with the proposed approaches. The second case study evaluates the complexity of the ERM with the integration of EVs. The third case study evaluates the performance of scheduling with different control modes for EVs. These control modes, combined with the proposed SA approach and with the developed heuristics, aim at improving the quality of the ERM, while reducing drastically its execution time. The proposed control modes are: uncoordinated charging, smart charging and V2G capability. The fourth and final case study presents the ERM approach applied to consecutive days.
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica
Resumo:
Este trabalho teve como propósito fazer uma avaliação do desempenho energético e da qualidade do ar no interior das instalações de uma Piscina Municipal Coberta, localizada na zona norte de Portugal, sendo estabelecidos os seguintes objetivos: caracterização geral da piscina, no que respeita aos seus diferentes espaços e equipamentos, cálculo dos consumos térmicos e elétricos bem como o registo das concentrações de elementos poluentes para controlo da qualidade do ar no interior da piscina, tendo como base a legislação atualmente em vigor. A caracterização geral da piscina permitiu verificar algumas inconformidades como a temperatura da água nos tanques de natação que tem valores superiores aos recomendados e a sala de primeiros socorros que não possui acesso direto ao exterior. Acrescente-se que o pavimento nos chuveiros da casa de banho feminina e os valores de pH para água do tanque grande e pequeno não estão sempre dentro da gama de recomendação. O caudal da renovação de ar está a ser operado manualmente e quando está a funcionar a 50% da sua capacidade máxima, que acontece numa parte do dia, apenas consegue renovar 77,5% do caudal recomendado pelo RSECE. Para se obter o valor recomendado é necessário ter pelo menos 7 horas com o caudal a 100% da capacidade máxima. A avaria na UTA2 originou que 40% dos registos diários da humidade relativa interior estivessem fora da gama de valores recomendados e que esta é fortemente dependente da humidade no exterior e pode ser agravada quando as portas dos envidraçados da nave são abertas. Analisando ainda a quantidade de água removida na desumidificação do ar com a água evaporada em condições de Outono-Inverno ou Primavera-Verão, este estudo permitiu concluir que todas as combinações demonstraram a necessidade de desumidificação salvo a combinação Outono-Inverno e UTA2 a funcionar a 100% da sua capacidade máxima. Os isolamentos das tubagens na sala das caldeiras foram observados e comparados com as soluções recomendadas pelas empresas especialistas e verificou-se que alguns estão mal colocados com parcial ou total degradação, promovendo perdas térmicas. No caso das perdas calorificas por evaporação, estas representaram cerca de 67,78% das perdas totais. Como tal, estudou-se a aplicação de uma cobertura sobre o plano de água durante o período de inatividade da piscina (8 horas) e verificou-se que o resultado seria uma poupança de 654,8 kWh/dia, na ausência de evaporação da água, mais 88,00 kWh/dia do período da UTA2 a funcionar a 50% da sua capacidade, perfazendo um total de 742,8 kWh/dia. A aplicação da cobertura permite obter um VAL de valor positivo, uma TIR de 22,77% e sendo este valor superior ao WACC (Weight Average Cost of Capital), o projeto torna-se viável com um Pay-Back de 3,17 anos. Caracterizou-se também o consumo total diário em eletricidade, e verificou-se que as unidades de climatização, as bombas de circulação de água, a iluminação, e outros equipamentos representam, respetivamente, cerca de 67,81, 25,26, 2,68 e 3,91% da energia elétrica total consumida. Por fim, a análise à qualidade do ar no interior da nave em Maio e Setembro identificou que as concentrações de ozono apresentavam valores no limite do aceitável em Maio e superiores ao valor de emissão em Setembro. Os compostos orgânicos voláteis também apresentavam valores em Maio 4,98 vezes superior e em Setembro 6,87 vezes superior aos valores máximos exigidos pelo D.L. nº 79/2006. Houve ainda altas concentrações de radão registadas na casa dos filtros, em Maio com um valor 11,49 vezes superior, no entanto esse valor desceu em Setembro para 1,08 vezes, mesmo assim superior ao exigido pelo D.L. nº 79/2006.
Resumo:
Objectives - Identify radiographers’ postures during frequent mammography procedures related to the mammography equipment and patient characteristics. Methods - A postural task analysis was performed using images acquired during the simulation of mammography positioning procedures. Simulations included craniocaudal/(CC) and mediolateral-oblique/(MLO) positioning in three different settings: radiographers and patients with similar statures, radiographers smaller than the patients and radiographers taller than the patients. Measurements of postural angles were performed by two raters using adequate software and classified according to the European Standard EN1005-4:2005 + A1:2008. Results - The simulations revealed that the most awkward posture in mammography is during the positioning of MLO projection in short-stature patients. Postures identified as causing work-related musculoskeletal disorder (WRMSD) risk were neck extension, arms elevated and the back stooped, presenting angles of 87.2, 118.6 and 63.6, respectively. If radiographers were taller than patients, then the trunk and arm postures were not acceptable. Conclusions - Working in a mammography room leads to awkward postures that can have an impact on radiographers’ health, namely WRMSDs. The results in this study showed that there are non-acceptable postures associated with frequent working procedures in mammography. MLO is the most demanding procedure for radiographer postures and may be related to WRMSDs. Mammography devices should be redesigned considering adjustability for radiographers. Main Messages: • Mammography constraints for radiographers in mammography procedures have not been well studied. • Performing mammography leads to awkward postures that can impact radiographers’ health. • MLO, the most demanding procedure for radiographers, is possibly related to WRMSDs.
Resumo:
O diagnóstico de máquinas elétricas pela análise de vibração é utilizado num plano de manutenção, onde é dado a conhecer a “real condição do equipamento”, e surgiu da necessidade de detetar vibrações indesejáveis nas máquinas elétricas, de uma forma simples e com custos acessíveis. Numa fase inicial é obtido um sinal correspondente á vibração da máquina, recorrendo a um acelerômetro, que dependendo da aceleração da máquina, constrói uma forma de onda correspondente. A forma de onda fica guardada em formato de áudio *.wav. Posteriormente, em software Matlab o ficheiro *.wav irá ser carregado, e comparado com o ficheiro *.wav original da máquina. Ao comparar os ficheiros o software analisa o espectro original da máquina através da transformada de Fourier, com o espectro atual. Se este espectro sair do intervalo de segurança, o software deteta nesse espectro a origem da vibração, pois cada vibração tem uma frequência associada. Percorridos os passos descritos, o software disponibiliza ao utilizador as respetivas formas de onda e todo o restante diagnóstico de forma a uma possível intervenção antecipada da avaria.
Resumo:
X-ray fluoroscopy is essential in both diagnosis and medical intervention, although it may contribute to significant radiation doses to patients that have to be optimised and justified. Therefore, it is crucial to the patient to be exposed to the lowest achievable dose without compromising the image quality. The purpose of this study was to perform an analysis of the quality control measurements, particularly dose rates, contrast and spatial resolution of Portuguese fluoroscopy equipment and also to provide a contribution to the establishment of reference levels for the equipment performance parameters. Measurements carried out between 2007 and 2013 on 143 fluoroscopy equipment distributed by 34 nationwide health units were analysed. The measurements suggest that image quality and dose rates of Portuguese equipment are congruent with other studies, and in general, they are as per the Portuguese law. However, there is still a possibility of improvements intending optimisation at a national level.
Resumo:
The economical and environment impacts of fossil energies increased the interest for hybrid, battery and fuel-cell electric vehicles. Several demanding engineering challenges must be faced, motivated by different physical domains integration. This paper aims to present an overview on hybrid (HEV) and electric vehicles (EV) basic structures and features. In addition, it will try to point out some of the most relevant challenges to overcome for HEV and EV may be a solid option for the mobility issue. New developments in energy storage devices and energy management systems (EMS) are crucial to achieve this goal.